Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
S680635 The Richman Group Privately-Owned Business 2727 Newport Blvd 203 Newport Beach, CA 92663 None None
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
S910282 Lakeland Apartments Los Angeles 4 Facility Discharger 01/25/2023 None
Total Related Places: 1
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
N/A Rick Westberg Contact Owner Contact N/A N/A N/A
Total Related Parties: 1
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
S557798 Construction 4 4 19C399699 Active CONSTW 2009-0009-DWQ 02/01/2023 None Discharger 01/25/2023 None None
Total Regulatory Measures: 1
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
S888440 10/03/2023 SW - Deficient BMP Implementation Site was observed with sediment track out. Violation N Inspection Lakeland Apartments S557798 2009-0009-DWQ Y
S888438 02/06/2024 SW - Incomplete/Insufficient SWPPP 1. The discharger failed to upload a copy of the Post-Construction BMP Plan into SMARTS. 2. The discharger failed to update the contractors? list in the SWPPP. 3. The discharger failed to provide an updated construction schedule in the SWPPP. 4. Failed to provide training information in the Annual Reports consisting of the following: a. Documentation of all training for individuals responsible for all activities associated with compliance for this General Permit; b. Documentation of all training for individuals responsible for BMP installation, inspection, maintenance, and repair; and c. Documentation of all training for individuals responsible for overseeing, revising, and amending the SWPPP. Violation N Inspection Lakeland Apartments S557798 2009-0009-DWQ N
S888592 02/15/2024 SW - Deficient BMP Implementation ? The discharger failed to minimize or prevent pollutants in stormwater discharges through the use of controls, structures, and management practices that achieve BAT for toxic and non-conventional pollutants and BCT for conventional pollutants. ? The discharger failed to ensure the effectiveness of existing BMPs to reduce or prevent pollutants in stormwater discharges. ? The discharger failed to establish and maintain effective perimeter controls. ? Accumulated sediment debris build-up from recent storms observed on the sidewalk. ? Sediment track-out observed from the stabilized entrance leading onto Lakeland Road. Violation N Inspection Lakeland Apartments S557798 2009-0009-DWQ N
S888439 02/06/2024 SW - Deficient BMP Implementation 1. The discharger failed to minimize or prevent pollutants in stormwater discharges through the use of controls, structures, and management practices that achieve BAT for toxic and non-conventional pollutants and BCT for conventional pollutants. 2. The discharger failed to ensure the effectiveness of existing BMPs to reduce or prevent pollutants in stormwater discharges. 3. The discharger failed to provide effective soil cover for inactive areas and all finished slopes 4. The discharger failed to establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site. 5. The discharger failed to effectively manage all run-on, all runoff within the site, and all runoff that discharges off the site. Run-on from off-site shall be directed away from all disturbed areas or shall collectively be in compliance with the effluent limitations in this General Permit. Violation N Inspection Lakeland Apartments S557798 2009-0009-DWQ N
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 4
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
S452872 Verbal Communication None 4 19C399699 CONSTW 10/03/2023 Historical
Total Enforcement Actions: 1
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 05/17/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page