Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S910282
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
4 S910282 Lakeland Apartments Facility 13231 Lakeland Road Santa Fe Springs, CA, 90670 Los Angeles

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S680635 Organization The Richman Group N/A Private Business 01/25/2023
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S557798 Construction 4 CONSTW 2009-0009-DWQ 4 19C399699 02/01/2023 Active
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S888592 02/15/2024 Deficient BMP Implementation • The discharger failed to minimize or prevent pollutants in stormwater discharges through the use of controls, structures, and management practices that achieve BAT for toxic and non-conventional pollutants and BCT for conventional pollutants. • The discharger failed to ensure the effectiveness of existing BMPs to reduce or prevent pollutants in stormwater discharges. • The discharger failed to establish and maintain effective perimeter controls. • Accumulated sediment debris build-up from recent storms observed on the sidewalk. • Sediment track-out observed from the stabilized entrance leading onto Lakeland Road. Violation B Inspection
S888438 02/06/2024 Incomplete/Insufficient SWPPP 1. The discharger failed to upload a copy of the Post-Construction BMP Plan into SMARTS. 2. The discharger failed to update the contractors’ list in the SWPPP. 3. The discharger failed to provide an updated construction schedule in the SWPPP. 4. Failed to provide training information in the Annual Reports consisting of the following: a. Documentation of all training for individuals responsible for all activities associated with compliance for this General Permit; b. Documentation of all training for individuals responsible for BMP installation, inspection, maintenance, and repair; and c. Documentation of all training for individuals responsible for overseeing, revising, and amending the SWPPP. Violation B Inspection
S888439 02/06/2024 Deficient BMP Implementation 1. The discharger failed to minimize or prevent pollutants in stormwater discharges through the use of controls, structures, and management practices that achieve BAT for toxic and non-conventional pollutants and BCT for conventional pollutants. 2. The discharger failed to ensure the effectiveness of existing BMPs to reduce or prevent pollutants in stormwater discharges. 3. The discharger failed to provide effective soil cover for inactive areas and all finished slopes 4. The discharger failed to establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site. 5. The discharger failed to effectively manage all run-on, all runoff within the site, and all runoff that discharges off the site. Run-on from off-site shall be directed away from all disturbed areas or shall collectively be in compliance with the effluent limitations in this General Permit. Violation B Inspection
S888440 10/03/2023 Deficient BMP Implementation Site was observed with sediment track out. Violation B Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 4 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation Incomplete/Insufficient SWPPP = Incomplete/Insufficient SWPPP

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
S452872 Verbal Communication 10/03/2023 Historical
Total Enf Actions: 1

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2064060 Enforcement Follow-up Andrew Veloz 04/09/2024 N 0 N/A
S2063878 Enforcement Follow-up Andrew Veloz 03/07/2024 N 0 N/A
S2063707 Enforcement Follow-up Andrew Veloz 02/20/2024 N 0 N/A
S2063708 A Type compliance Andrew Veloz 02/20/2024 N 0 N/A
S2063657 Enforcement Follow-up Andrew Veloz 02/15/2024 N 1 N/A
S2063476 B Type compliance Andrew Veloz 02/06/2024 N 1 N/A
S2063475 Inspection from Vehicle Andrew Veloz 10/03/2023 N 2 N/A
Total Inspections: 7 Last Inspection: 04/09/2024
  
The current report was generated with data as of: 05/17/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page