General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
S629282 Oxnard School District Elementary School 1051 South A Street Oxnard, CA 93030 805-385-1501 2400 lcline@oxnardsd.org
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
S268595 Transportation Facility Ventura 4 Facility Discharger 09/01/2005 None
S841997 Lemonwood Elementary School Ventura 4 Facility Discharger 10/16/2015 None
S899997 Rose Avenue Elementary School Ventura 4 Facility Discharger 11/16/2021 None
S865263 Mckinna Elementary School Ventura 4 Facility Discharger 06/28/2018 None
S850741 Elm Street Elementary School Ventura 4 Facility Discharger 10/20/2016 None
Total Related Places: 5
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
N/A David Fateh Contact Owner Contact N/A N/A N/A
N/A Marcos Lopez Contact Owner Contact N/A N/A N/A
Total Related Parties: 2
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
S543848 Construction 4 4 56C395963 Active CONSTW 2009-0009-DWQ 12/15/2021 None Discharger 11/16/2021 None None
S192825 Industrial 4 4 56I017854 Active INDSTW 2014-0057-DWQ 03/04/2003 None Discharger 09/01/2005 None None
Total Regulatory Measures: 2
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
S872598 01/22/2020 SW - Incomplete/Insufficient SWPPP SWPPP Violations: ? The discharger failed to ensure that all inspections, maintenance, repairs, and sampling activities at the project location were performed or supervised by a Qualified SWPPP Practitioner (QSP) representing the discharger. ? The discharger failed to ensure that all persons responsible for implementing the SWPPP requirements were appropriately trained in accordance with the Construction General Permit (CGP). ? The discharger failed to use inspection checklist, using a form provided by the State Water Board or Regional Water Board or in an alternative format. The provided inspections lacked key CGP components on their alternative format used. ? The discharger failed to update the Risk Assessment for the project when the date for construction completion changed. A new Risk Assessment is required for the revised construction end date. The construction end date identified in SMARTS is November 30, 2019. The permittee needs to complete a revised Risk Assessment. ? An updated contractor and subcontractors list was not included in the SWPPP. Violation N Inspection Mckinna Elementary School S499243 2009-0009-DWQ Y
S872597 01/22/2020 SW - Deficient BMP Implementation BMP Deficiencies: ? Staff observed inadequate perimeter controls throughout the project site. Sediment was observed leaving the site from areas with no perimeter controls or inadequate controls ? Staff observed wet and dry concrete wastes and residuals directly on the ground without proper BMPs. No concrete wash-out bins were observed onsite at the time of the inspection ? Staff observed sediment leaving the perimeter fence and construction entrance at the north portion of the project site onto the public alleyway ? Staff observed inadequate stabilized construction entrance at the north portion of the project site. Mr. Root stated that the entrance was only used a few times and won?t be used at all going forward ? Staff observed poor Housekeeping Site Management throughout the project site. ? Staff observed poor inlet protection BMP controls Violation N Inspection Mckinna Elementary School S499243 2009-0009-DWQ Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 2
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
S409483 1st Annual Report Notice of Non-Compliance None 4 56I017854 INDSTW 08/10/2012 Historical
S436201 Notice of Violation None 4 56C383912 CONSTW 02/10/2020 Historical
S418280 1st Annual Report Notice of Non-Compliance None 4 56I017854 INDSTW 02/13/2015 Historical
S249594 Notice of Violation NOV 4 56I017854 INDSTW 12/12/2003 Historical
Total Enforcement Actions: 4
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 05/17/2024