|
General Information |
|
Party ID |
Party Name |
Party Classification |
Mailing Address |
Work Phone |
Email/Website |
S629282 |
Oxnard School District |
Elementary School |
1051 South A Street Oxnard, CA 93030 |
805-385-1501 2400 |
lcline@oxnardsd.org |
|
|
|
|
|
|
Related Places
|
|
Total Related Places: 5
|
|
|
|
|
|
|
Related Parties
|
|
Total Related Parties: 2
|
|
|
|
|
|
|
Regulatory Measures (non-enforcement)
|
|
Total Regulatory Measures: 2
|
|
|
|
|
|
|
Violations within the past five years
|
Violation ID |
Occurrence Date |
Violation Type |
Violation Description(-) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
S872597 |
01/22/2020 |
SW - Deficient BMP Implementation |
BMP Deficiencies: ? Staff observed inadequate perimeter controls throughout the project site. Sediment was observed leaving the site from areas with no perimeter controls or inadequate controls ? Staff observed wet and dry concrete wastes and residuals directly on the ground without proper BMPs. No concrete wash-out bins were observed onsite at the time of the inspection ? Staff observed sediment leaving the perimeter fence and construction entrance at the north portion of the project site onto the public alleyway ? Staff observed inadequate stabilized construction entrance at the north portion of the project site. Mr. Root stated that the entrance was only used a few times and won?t be used at all going forward ? Staff observed poor Housekeeping Site Management throughout the project site. ? Staff observed poor inlet protection BMP controls |
Violation |
N |
Inspection |
Mckinna Elementary School |
S499243 |
2009-0009-DWQ |
Y |
S872598 |
01/22/2020 |
SW - Incomplete/Insufficient SWPPP |
SWPPP Violations: ? The discharger failed to ensure that all inspections, maintenance, repairs, and sampling activities at the project location were performed or supervised by a Qualified SWPPP Practitioner (QSP) representing the discharger. ? The discharger failed to ensure that all persons responsible for implementing the SWPPP requirements were appropriately trained in accordance with the Construction General Permit (CGP). ? The discharger failed to use inspection checklist, using a form provided by the State Water Board or Regional Water Board or in an alternative format. The provided inspections lacked key CGP components on their alternative format used. ? The discharger failed to update the Risk Assessment for the project when the date for construction completion changed. A new Risk Assessment is required for the revised construction end date. The construction end date identified in SMARTS is November 30, 2019. The permittee needs to complete a revised Risk Assessment. ? An updated contractor and subcontractors list was not included in the SWPPP. |
Violation |
N |
Inspection |
Mckinna Elementary School |
S499243 |
2009-0009-DWQ |
Y |
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
|
|
Total Violations: 2
|
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
|
|
|
|
|
|
|
Enforcement Actions
|
Enforcement ID |
Enforcement Type |
Enf. Order No. |
Title |
Program |
Effective Date |
Status |
S436201 |
Notice of Violation |
None |
4 56C383912 |
CONSTW |
02/10/2020 |
Historical |
S418280 |
1st Annual Report Notice of Non-Compliance |
None |
4 56I017854 |
INDSTW |
02/13/2015 |
Historical |
S409483 |
1st Annual Report Notice of Non-Compliance |
None |
4 56I017854 |
INDSTW |
08/10/2012 |
Historical |
S249594 |
Notice of Violation |
NOV |
4 56I017854 |
INDSTW |
12/12/2003 |
Historical |
|
Total Enforcement Actions: 4
|
|
|
|
|
|
|
Regulatory Measures linked to Related Parties
|
|
Total Regulatory Measures linked to Related Parties: 0
|
|
|