Violation ID |
Occurrence Date |
Violation Type |
Violation Description(+) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
1128215 |
04/23/2024 |
OEV |
pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.59 SU at M-INT |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1128214 |
04/23/2024 |
CAT1 |
Total Suspended Solids (TSS) Monthly Average limit is 13.2 lb/day and reported v |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1128213 |
04/23/2024 |
CAT1 |
Total Suspended Solids (TSS) Monthly Average limit is 30 mg/L and reported value |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1126587 |
03/04/2024 |
OEV |
pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.42 SU at M-INT |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1126586 |
03/04/2024 |
OEV |
pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.14 SU at M-INT |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1123578 |
12/17/2023 |
Order Conditions |
Temp Diff b/n Intake and Discharge Instantaneous Maximum limit is 30.0 Degrees C |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1122294 |
10/30/2023 |
Deficient Monitoring |
pH measurements outside the acceptable range for relative percent difference (RP |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1121428 |
09/20/2023 |
Deficient Monitoring |
Samples were collected per the NPDES permit requirement. Cross contamination occ |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1121427 |
09/20/2023 |
Deficient Monitoring |
Samples were collected per the NPDES permit requirement. Cross contamination occ |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1121426 |
09/20/2023 |
Deficient Monitoring |
Samples were collected per the NPDES permit requirement. Cross contamination occ |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1120670 |
08/29/2023 |
OEV |
pH Instantaneous Maximum limit is 9 SU and reported value was 9.2 SU at M-INTB2. |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1120669 |
08/29/2023 |
OEV |
pH Instantaneous Maximum limit is 9 SU and reported value was 9.96 SU at M-INTB1 |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1120668 |
08/29/2023 |
CAT1 |
Total Suspended Solids (TSS) Monthly Average limit is 30 mg/L and reported value |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
1119737 |
07/24/2023 |
OEV |
pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.24 SU at M-INT |
Violation |
N |
eSMR |
Huntington Beach Generating Station |
422464 |
R8-2020-0040 |
N |
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
|