Spill Details |
|
*18 - Spill appearance point: |
|
|
19 - Spill appearance point explanation:
|
|
|
*20 - Did the spill discharge to a drainage channel and/or surface water? |
und
|
|
*21 - Did the spill reach a separate (i.e.,not combined) storm drainpipe? |
und
|
*22 - If spill reached to a separate storm drainpipe, was all of the wastewater fully captured from the separate storm drain and returned to the sanitary sewer system? |
und
|
|
*23 - Private lateral spill? |
und
|
24 - Name of responsible party (for private lateral spill only, if known): |
|
|
*25 - Final spill destination:
|
und
|
|
26 - Explanation of final spill destination:
|
und
|
|
*27 - Estimated spill volume: |
0 gallons
|
|
28 - Estimated volume of spill recovered: |
0 gallons
|
|
*1.1 - Estimated volume of spill that reached surface water, drainage channel, or not recovered from a separate storm drain: |
|
29 - Estimated current spill rate (if applicable): |
0 gallons per minute |
|
*30 - Estimated spill start date/time: |
01/01/1900
|
|
*31 - Date and time sanitary sewer system agency was notified of or discovered spill: |
|
|
*32 - Estimated Operator arrival date/time: |
|
|
*33 - Estimated spill end date/time: |
|
|
*34 - Spill cause: |
|
|
35 - Spill cause explanation:
|
|
36 - Where did failure occur? |
und
|
|
37 - Explanation of Where failure occured:
|
und
|
38 - If spill caused by wet weather, choose size of storm: |
|
39 - Diameter of sewer pipe at the point of blockage or spill cause (if applicable): |
|
40 - Material of sewer pipe at the point of blockage or spill cause (if applicable): |
|
41 - Estimated age of sewer pipe at the point of blockage or spill cause (if applicable): |
|
42 - Description of terrain surrounding the point of blockage or spill cause (if applicable): |
|
|
*43 - Spill response activities:
|
|
|
44 - Explanation of spill response activities:
|
|
45 - Visual inspection results from impacted receiving water: |
|
|
*1.3 - Health warnings posted? |
|
|
46a - Name of impacted beach(es) (enter NA if not applicable): |
|
|
*46b - Name of impacted surface water(s) (enter NA if not applicable): |
|
|
Notification Details |
|
47 - OES Control Number
|
|
|
48 - OES Called Date/Time
|
|
49 - Regional Water Quality Control Board notified date/time: |
|
50 - Method Notification: |
|
51 - Name of Staff Contacted: |
|
52 - Phone Number of Staff Contacted: |
|
53 - Other Agency Notified: |
|
54 - Was any of this spill report information submitted via fax (or electronically) to the Regional
Water Quality Control Board? |
|
|
55 - Date and time spill report information was submitted via
fax (or electronically) to the Regional Water quality Control Board:
|
|