|
General Information |
|
Party ID |
Party Name |
Party Classification |
Mailing Address |
Work Phone |
Email/Website |
S656898 |
Steaven Jones Development Company |
Privately-Owned Business |
12381 Wilshire Boulevard Suite 201 Los Angeles, CA 90025 |
310-826-3600 15 |
lmeister@sjdcinc.com |
|
|
|
|
|
|
Related Places
|
|
Total Related Places: 2
|
|
|
|
|
|
|
Related Parties
|
|
Total Related Parties: 1
|
|
|
|
|
|
|
Regulatory Measures (non-enforcement)
|
|
Total Regulatory Measures: 0
|
|
|
|
|
|
|
Violations within the past five years
|
Violation ID |
Occurrence Date |
Violation Type |
Violation Description(-) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
S870540 |
07/16/2019 |
SW - Incomplete/Insufficient SWPPP |
SWPPP Violations: ? The SWPPP was not available for review onsite at the time of the inspection. ? The weekly, pre-storm, and post-storm inspection records were not available for review onsite at the time of the inspection. ? The SWPPP (in SMARTS) did not include a list of names of all contractors, subcontractors, and individuals who will be directed by the QSP. ? The SWPPP (in SMARTS) did not include a copy of the QSD and QSP certifications. ? The discharger failed to ensure that all persons responsible for implementing requirements of the General Permit were appropriately trained in accordance with the CGP. No copies of the trained contractor personnel log were found in the SWPPP. ? The SWPPP (in SMARTS) did not include information that supports the conclusions, selections, use, and maintenance of BMPs. |
Violation |
N |
Inspection |
INclave |
S508309 |
2009-0009-DWQ |
N |
S870539 |
07/16/2019 |
SW - Deficient BMP Implementation |
BMP Deficiencies: ? Sediment track-out was observed at entrances and exits without proper BMPs and without a stabilized construction entrance/exit. ? Perimeter controls were observed inadequate in some areas of the project site at the time of the inspection. ? Poor housekeeping was observed. Trash and dried stucco and concrete waste materials were observed throughout the project site without proper BMP measures in place. |
Violation |
N |
Inspection |
INclave |
S508309 |
2009-0009-DWQ |
Y |
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
|
|
Total Violations: 2
|
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
|
|
|
|
|
|
|
Enforcement Actions
|
|
Total Enforcement Actions: 1
|
|
|
|
|
|
|
Regulatory Measures linked to Related Parties
|
|
Total Regulatory Measures linked to Related Parties: 0
|
|
|