Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
S655519 BjD Services LLC Privately-Owned Business 18565 Soledad Canyon Rd # 314 Canyon Country, CA 91351 562-212-5921 brian@bjd-resourcing.com
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
S876429 Kuykendall Residence and Garage Los Angeles 4 Facility Discharger 10/07/2019 None
Total Related Places: 1
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
N/A brian mcwilliams Contact Owner Contact N/A N/A N/A
Total Related Parties: 1
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
S513680 Construction 4 4 19C388366 Active CONSTW 2009-0009-DWQ 10/11/2019 None Discharger 10/07/2019 None None
Total Regulatory Measures: 1
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
S884525 03/29/2022 SW - Deficient BMP Implementation BMP Deficiencies: ? The discharger failed to establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site. ? The discharger failed to ensure that all portable toilets had proper containment (i.e., secondary containment). ? The discharger failed to ensure that all storm drain inlets and perimeter controls, runoff control BMPs, and pollutant controls at entrances and exits are maintained and protected from activities that impact their effectiveness. Violation N Inspection Kuykendall Residence and Garage S513680 2009-0009-DWQ N
S884524 03/29/2022 SW - Incomplete/Insufficient SWPPP SWPPP Deficiencies: ? The discharger failed to submit the 2019-2020 and 2020-2021 Annual Reports ? A Change of Information (COI) needs to be submitted in SMARTS to extend the project completion/end date and recalculate the Risk Level. ? Post-Construction BMP Plan needs to be uploaded to SMARTS. ? Contractor?s list and Training Log need to be updated and included in the SWPPP. ? The construction schedule needs to be updated/included in the SWPPP. ? The discharger failed to perform weekly inspections and observations, and at least once each 24-hour period during extended storm events, to identify and record BMPs that need maintenance to operate effectively, that have failed, or that could fail to operate as intended. Violation N Inspection Kuykendall Residence and Garage S513680 2009-0009-DWQ Y
S876980 06/08/2021 SW - Late Report 2019-20 AR is overdue. Violation N Report Kuykendall Residence and Garage S513680 2009-0009-DWQ Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 3
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
S449453 Verbal Communication None 4 19C388366 CONSTW 03/29/2022 Historical
S440693 1st Annual Report Notice of Non-Compliance None 4 19C388366 CONSTW 06/08/2021 Active
Total Enforcement Actions: 2
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 05/17/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page