Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
S654964 Dhandra Developement Privately-Owned Business 11806 Peak Rd Chatsworth, CA 91311 213-788-4708 ravigrewal192@gmail.com
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
S869150 Dhandra Development Los Angeles 4 Facility Discharger 12/12/2018 None
Total Related Places: 1
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
N/A Ravinder Grewal Contact Owner Contact N/A N/A N/A
Total Related Parties: 1
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
S504314 Construction 4 4 19C385610 Active CONSTW 2009-0009-DWQ 12/27/2018 None Discharger 12/12/2018 None None
Total Regulatory Measures: 1
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
S884396 01/05/2023 SW - Incomplete/Insufficient SWPPP ? The discharger failed to request for a Change of Information (COI) that is required to update the construction end date and the following information: o The project will need to extend the completion date and update the Risk Assessment. o Based on the updated information, the project must verify if the Risk Level remains in Level 1 or if the level goes to Level 2. ? The discharger failed to upload a copy of the Post-Construction BMP Plan into SMARTS. ? The discharger failed to update the Responsible Parties' information. ? The discharger failed to update the contractors? list in the SWPPP. ? The discharger failed to provide an updated construction schedule in the SWPPP ? The discharge failed to provide training information in the Annual Reports consisting of the following: Violation N Inspection Dhandra Development S504314 2009-0009-DWQ Y
S884402 01/10/2023 SW - Incomplete/Insufficient SWPPP nding SWPPP Violations: ? The discharger failed to request for a Change of Information (COI) that is required to update the construction end date and the following information: o The project will need to extend the completion date and update the Risk Assessment. o Based on the updated information, the project must verify if the Risk Level remains in Level 1 or if the level goes to Level 2. ? The discharger failed to upload a copy of the Post-Construction BMP Plan into SMARTS. ? The discharger failed to update the Responsible Parties' information. ? The discharger failed to update the contractors? list in the SWPPP. ? The discharger failed to provide an updated construction schedule in the SWPPP. ? The discharge failed to provide training information in the Annual Reports consisting of the following: Violation N Inspection Dhandra Development S504314 2009-0009-DWQ Y
S887746 12/21/2023 SW - Deficient BMP Implementation Erosion and Sediment Control BMP Violations. Stormwater sediment laden discharger occurred. Violation N Inspection Dhandra Development S504314 2009-0009-DWQ N
S884401 01/10/2023 SW - Deficient BMP Implementation ? Poor housekeeping was observed throughout the site. ? The discharger failed to minimize or prevent pollutants in stormwater discharges through the use of controls, structures, and management practices that achieve BAT for toxic and non-conventional pollutants and BCT for conventional pollutants. ? The discharger failed to cover and berm loose stockpiled construction materials that were not actively being used (i.e., soil, spoils, aggregate, fly-ash, stucco, hydrated lime, etc.). ? The discharger failed to ensure the effectiveness of existing BMPs to reduce or prevent pollutants in stormwater discharges. ? The discharger failed to provide effective soil cover for inactive areas and all finished slopes ? The discharger failed to establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site. ? The discharger failed to effectively manage all run-on, all run-off within the site, and all run-off that discharges off the site. Run-on from off-site shall be directed away from all disturbed areas or shall collectively be in compliance with the effluent limitations in this Construction General Permit. Violation N Inspection Dhandra Development S504314 2009-0009-DWQ Y
S884400 01/05/2023 SW - Deficient BMP Implementation ? Poor housekeeping was observed throughout the site. ? The discharger failed to minimize or prevent pollutants in stormwater discharges through the use of controls, structures, and management practices that achieve BAT for toxic and non-conventional pollutants and BCT for conventional pollutants. ? The discharger failed to cover and berm loose stockpiled construction materials that were not actively being used (i.e., soil, spoils, aggregate, fly-ash, stucco, hydrated lime, etc.). ? The discharger failed to ensure the effectiveness of existing BMPs to reduce or prevent pollutants in stormwater discharges. ? The discharger failed to provide effective soil cover for inactive areas and all finished slopes ? The discharger failed to establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site. ? The discharger failed to effectively manage all run-on, all runoff within the site, and all runoff that discharges off the site. Run-on from off-site shall be directed away from all disturbed areas or shall collectively be in compliance with the effluent limitations in this General Permit. Violation N Inspection Dhandra Development S504314 2009-0009-DWQ Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 5
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
S449352 Notice of Violation None 4 19C385610 CONSTW 02/01/2023 Active
Total Enforcement Actions: 1
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 05/16/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page