Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
S646808 JH Construction & Design Inc Privately-Owned Business 488 Wrangler way walnut, CA 91789 626-593-1288 mzhang@fbsmfgusa.com
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
S855061 Deodar Los Angeles 4 Facility Discharger 05/01/2017 None
Total Related Places: 1
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
N/A Stephen Liu Contact Owner Contact N/A N/A N/A
Total Related Parties: 1
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
S486002 Construction 4 4 19C379817 Active CONSTW 2009-0009-DWQ 05/11/2017 None Discharger 05/01/2017 None None
Total Regulatory Measures: 1
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
S885733 06/07/2023 SW - Deficient BMP Implementation Entrance/exit observed with deficient stabilization BMPs in place. Sediment tracked out onto the road observed. A large metal container with trash without cover observed. Perimeter controls were observed deficient with broken sandbags. Inadequately protected storm drain catch basins observed with debris in them. A stockpile of loose soil observed near Sawpit Wash/Channel without cover and deficient sediment and perimeter controls. Violation N Inspection Deodar S486002 2009-0009-DWQ Y
S876683 10/07/2020 SW - Late Report The operator has not submitted 2018-2019 and 2019-2020 annual reports. Violation N Inspection Deodar S486002 2009-0009-DWQ Y
S876682 10/07/2020 SW - No SWPPP At the time of the inspection, the SWPPP and sampling data were not available for review onsite. In addition, The completion date is expired. Violation N Inspection Deodar S486002 2009-0009-DWQ Y
S885734 06/07/2023 SW - Incomplete/Insufficient SWPPP Contractor?s list needs to be updated and included in the SWPPP. Construction completion date needs to be updated, risk recalculated, and included in the SWPPP. A Change of Information needs to be requested in SMARTS for these. The 2020-2021 Annual Report is past due. Violation N Inspection Deodar S486002 2009-0009-DWQ Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 4
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
S432598 1st Annual Report Notice of Non-Compliance None 4 19C379817 CONSTW 02/22/2019 Historical
S450563 Notice of Violation None 4 19C379817 CONSTW 11/03/2023 Historical
S440413 Notice of Violation None 4 19C379817 CONSTW 03/23/2021 Historical
S433567 Notice of Violation None 4 19C379817 CONSTW 07/22/2019 Historical
Total Enforcement Actions: 4
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 05/17/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page