|
General Information |
|
Party ID |
Party Name |
Party Classification |
Mailing Address |
Work Phone |
Email/Website |
S646808 |
JH Construction & Design Inc |
Privately-Owned Business |
488 Wrangler way walnut, CA 91789 |
626-593-1288 |
mzhang@fbsmfgusa.com |
|
|
|
|
|
|
Related Places
|
|
Total Related Places: 1
|
|
|
|
|
|
|
Related Parties
|
|
Total Related Parties: 1
|
|
|
|
|
|
|
Regulatory Measures (non-enforcement)
|
|
Total Regulatory Measures: 1
|
|
|
|
|
|
|
Violations within the past five years
|
Violation ID |
Occurrence Date |
Violation Type |
Violation Description(-) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
S885733 |
06/07/2023 |
SW - Deficient BMP Implementation |
Entrance/exit observed with deficient stabilization BMPs in place. Sediment tracked out onto the road observed. A large metal container with trash without cover observed. Perimeter controls were observed deficient with broken sandbags. Inadequately protected storm drain catch basins observed with debris in them. A stockpile of loose soil observed near Sawpit Wash/Channel without cover and deficient sediment and perimeter controls. |
Violation |
N |
Inspection |
Deodar |
S486002 |
2009-0009-DWQ |
Y |
S876683 |
10/07/2020 |
SW - Late Report |
The operator has not submitted 2018-2019 and 2019-2020 annual reports. |
Violation |
N |
Inspection |
Deodar |
S486002 |
2009-0009-DWQ |
Y |
S876682 |
10/07/2020 |
SW - No SWPPP |
At the time of the inspection, the SWPPP and sampling data were not available for review onsite. In addition, The completion date is expired. |
Violation |
N |
Inspection |
Deodar |
S486002 |
2009-0009-DWQ |
Y |
S885734 |
06/07/2023 |
SW - Incomplete/Insufficient SWPPP |
Contractor?s list needs to be updated and included in the SWPPP. Construction completion date needs to be updated, risk recalculated, and included in the SWPPP. A Change of Information needs to be requested in SMARTS for these. The 2020-2021 Annual Report is past due. |
Violation |
N |
Inspection |
Deodar |
S486002 |
2009-0009-DWQ |
Y |
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
|
|
Total Violations: 4
|
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
|
|
|
|
|
|
|
Enforcement Actions
|
Enforcement ID |
Enforcement Type |
Enf. Order No. |
Title |
Program |
Effective Date |
Status |
S432598 |
1st Annual Report Notice of Non-Compliance |
None |
4 19C379817 |
CONSTW |
02/22/2019 |
Historical |
S450563 |
Notice of Violation |
None |
4 19C379817 |
CONSTW |
11/03/2023 |
Historical |
S440413 |
Notice of Violation |
None |
4 19C379817 |
CONSTW |
03/23/2021 |
Historical |
S433567 |
Notice of Violation |
None |
4 19C379817 |
CONSTW |
07/22/2019 |
Historical |
|
Total Enforcement Actions: 4
|
|
|
|
|
|
|
Regulatory Measures linked to Related Parties
|
|
Total Regulatory Measures linked to Related Parties: 0
|
|
|