Violation ID |
Occurrence Date |
Violation Type |
Violation Description(-) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
S881560 |
08/24/2021 |
SW - Deficient BMP Implementation |
The observed driveway along Placentia Lane, indiscernible from the soft shoulder on Placentia Lane due to sediment and debris, constitutes a failure to maintain effective perimeter controls and stabilize all site entrances/exits to sufficiently control discharges and thusly is a violation of Section III.E.1.c.1.b.iv |
Violation |
N |
Inspection |
Augustine Metals |
S426984 |
R8-2012-0012 |
Y |
S881561 |
08/24/2021 |
SW - Deficient BMP Implementation |
The materials stored in and around the gravel percolation bed constitutes a failure to clean catch basins and other stormwater conveyances and thusly is a violation of Section III.E.1.c.b.xviii |
Violation |
N |
Inspection |
Augustine Metals |
S426984 |
R8-2012-0012 |
Y |
S881567 |
03/31/2021 |
SW - Deficient Report |
The submitted Phase III CAP is wholly insufficient in addressing the pollutant sources from your facility and has not been approved. Advancing to Phase III necessitates the use of a Best Available Technology (BAT) treatment method (i.e. advanced media filtration system or other equivalent treatment system) to meet NALs |
Violation |
N |
Internal Report |
Augustine Metals |
S426984 |
R8-2012-0012 |
Y |
S881562 |
08/24/2021 |
SW - Deficient BMP Implementation |
The unpaved industrial areas of the facility constitutes a failure to pave all industrial areas of the site to minimize dust generation and erosion and thusly is a violation of Section III.E.1.c.1.b.iii; |
Violation |
N |
Inspection |
Augustine Metals |
S426984 |
R8-2012-0012 |
Y |
S881563 |
08/24/2021 |
SW - Deficient BMP Implementation |
The percolation or evapotranspiration of untreated stormwater from industrial areas constitutes a failure to adequately pre-treat run-off prior to infiltration and thusly is a violation of Section III.E.1c.1.b.viii; |
Violation |
N |
Inspection |
Augustine Metals |
S426984 |
R8-2012-0012 |
Y |
S881559 |
08/24/2021 |
SW - Deficient BMP Implementation |
The observed sediment and fine metal debris accumulation on paved areas constitutes a failure to sweep industrial areas on a regular basis and thusly is a violation of Section III.E.1.c.1.b.xvii; |
Violation |
N |
Inspection |
Augustine Metals |
S426984 |
R8-2012-0012 |
Y |
S881564 |
08/24/2021 |
SW - Incomplete/Insufficient SWPPP |
The unavailability of the facility SWPPP and related documents during the August 24, 2021 inspection constitutes a failure to maintain the SWPPP on site and be made available to Santa Ana Water Board staff upon request and thusly is a violation of Section III.D.3; |
Violation |
N |
Inspection |
Augustine Metals |
S426984 |
R8-2012-0012 |
Y |
S881565 |
08/24/2021 |
SW - Incomplete/Insufficient SWPPP |
The failure to appropriately identify stormwater conveyance systems and discharge points is a violation of Section III.E.1.c.1.a; and, |
Violation |
N |
Internal Report |
Augustine Metals |
S426984 |
R8-2012-0012 |
Y |
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
|