Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
S618488 Garcia Recycling Center Privately-Owned Business 13862 Seaboard Circle Garden Grove, CA 92843 714-554-3213 garciarecycling@sbcglobal.net
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
S816776 Garcia Recycling Center Orange 8 Facility Discharger 04/30/2012 None
Total Related Places: 1
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
N/A Jesus Garcia Sanchez Contact Owner Contact N/A N/A N/A
Total Related Parties: 1
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
S426656 Region 8 - Scrap Metal Permit 8 8 30MR000017 Active INDSTW R8-2012-0012 05/15/2012 None Discharger 04/30/2012 None None
Total Regulatory Measures: 1
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
S877450 08/02/2021 SW - Late Report Failure to submit 2020/2021 AR by 8/1/21 deadline Violation N Internal Report Garcia Recycling Center S426656 R8-2012-0012 Y
S870394 06/17/2019 SW - Incomplete/Insufficient SWPPP The following were observed: ? The two undocumented discharge points and unidentified monitoring locations for the LID BMP constitutes a failure to document all discharge points and monitoring locations on the site map in the SWPPP in violation of Section III.E.1.c.1.a; ? The failure to update the SWPPP violates Section III.D.3; and, Violation N Inspection Garcia Recycling Center S426656 R8-2012-0012 Y
S875569 06/15/2020 SW - Deficient BMP Implementation Phase III CAP was approved in a letter dated 3/17/20 with 6/15/20 implementation deadline. Discharger has not implemented the Phase III CAP as of 12/29/20. Violation N Internal Report Garcia Recycling Center S426656 R8-2012-0012 Y
S872111 07/16/2019 SW - Deficient BMP Implementation Failed to submit Corrective Action Plan by the 2014-2015 reporting year. Violation N Internal Report Garcia Recycling Center S426656 R8-2012-0012 Y
S870393 06/17/2019 SW - Deficient BMP Implementation The following violations were observed: ? The poor housekeeping conditions constitutes the failure to sweep industrial areas on a regular basis which is a violation of Section III.E.1.c.1.b.xvii; ? The leak from the roll off constitutes a failure to cleanup spills and leaks promptly using dry methods in violation of Section III.E.1.c.1.c.ii; ? The broken glass near the storm drain in the southwest corner of the facility and the trash and debris near and inside the storm drain in the eastern portion of the facility constitutes the failure to clean catch basins and other storm water conveyance systems on as needed basis in violation of Section III.E.1.c.1.b.xviii; ? Evidence of the unauthorized non-storm water discharges observed from the two outlets south of the western gate and from the discharge point located at the northern gate constitutes a failure to eliminate all unauthorized non-storm water discharges in violation of Section III.E.1.c.1.b.x; ? Mr. Garcia stated the undocumented discharge points have both previously discharged. In addition, Mr. Garcia stated the cap from the secondary containment structure for the above ground storage tank is opened when it rains. This again constitutes a failure to eliminate all unauthorized non-storm water discharges in violation of Section III.E.1.c.1.b.x; ? The unidentified sample collection point before storm water enters the LID BMPs constitutes a failure to collect samples before runoff comes into contact with the LID BMPs and after runoff passes through the LID BMPs in violation of Section III.E.1.c.1.b.vii. Violation N Inspection Garcia Recycling Center S426656 R8-2012-0012 Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 5
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
S416263 1st Annual Report Notice of Non-Compliance None 8 30MR000017 INDSTW 09/02/2014 Historical
S415661 Staff Enforcement Letter None 8 30MR000017 INDSTW 04/03/2014 Historical
S426811 Notice of Non-Compliance for Non-Filers None 8 30MR000017 INDSTW 05/11/2012 Historical
S439230 Verbal Communication None 8 30MR000017 INDSTW 12/29/2020 Active
S435450 Staff Enforcement Letter None 8 30MR000017 INDSTW 08/12/2019 Historical
S441379 1st Annual Report Notice of Non-Compliance None 8 30MR000017 INDSTW 08/16/2021 Historical
S435455 Staff Enforcement Letter None 8 30MR000017 INDSTW 11/05/2019 Historical
S436000 Staff Enforcement Letter None 8 30MR000017 INDSTW 01/15/2020 Historical
S433506 Staff Enforcement Letter None 8 30MR000017 INDSTW 07/08/2019 Historical
S433538 Staff Enforcement Letter None 8 30MR000017 INDSTW 07/16/2019 Historical
S436267 Verbal Communication None 8 30MR000017 INDSTW 02/18/2020 Historical
Total Enforcement Actions: 11
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 05/16/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page