Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
569044 Greenrock Ranch Lands, LLC Privately-Owned Business 45 Koch Rd #A Corte Madera, CA 94925 None None
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
214640 Ione WWTF Amador 5S Wastewater Treatment Facility None None None
Total Related Places: 1
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
Total Related Parties: 0
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
368758 WDR 5S 5B030102001 Active WDRMUNILRG R5-2013-0022 04/11/2013 None Discharger 10/12/2017 None Y
Total Regulatory Measures: 1
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
1113934 01/19/2023 Unauthorized Discharge During the inspection of the Town Field, including the tailwater control and return systems, the following violations of the WDR conditions were confirmed: ?Discharge Specification B.3: The discharge shall remain within the permitted waste treatment/containment structures and land application areas at all times.? At the time of the inspection Regional Board staff observed a large amount of tailwater pooled along the tailwater control berm on the southeast and south boarders of the Ione wastewater treatment facility LAAs designated the ?Town Field?. Further into the inspection Regional Board staff observed that the tailwater return vault was underwater and the valve was shut off. The Discharger was knowingly not complying with conditions of the WDRs nor implementing their best management practice of returning excess tailwater back to the plant. Board staff also inspected the tailwater control berm, which had been breached and failed in numerous places along the southwest and southern boarders of the Town Field. On the southeastern boarder of the Town Field discharging tailwater was leaving the LAA and flooding the adjacent pastureland to the west of the Town Field. Violation None Inspection Ione WWTF 368758 R5-2013-0022 N
1113937 01/19/2023 Unauthorized Discharge During the inspection of the Town Field, including the tailwater control and return systems, the following violations of the WDR conditions were confirmed: ?Water Recycling Specification G.9: The LAAs shall be inspected as frequently as necessary to comply with Monitoring and Reporting Program R5-2013-0022 and to ensure continuous compliance with the requirements of this Order.? At the time of the inspection Regional Board staff observed a large amount of tailwater pooled along the tailwater control berm on the southeast and south boarders of the Ione wastewater treatment facility LAAs designated the ?Town Field?. Further into the inspection Regional Board staff observed that the tailwater return vault was underwater and the valve was shut off. The Discharger was knowingly not complying with conditions of the WDRs nor implementing their best management practice of returning excess tailwater back to the plant. Board staff also inspected the tailwater control berm, which had been breached and failed in numerous places along the southwest and southern boarders of the Town Field. On the southeastern boarder of the Town Field discharging tailwater was leaving the LAA and flooding the adjacent pastureland to the west of the Town Field. Violation None Inspection Ione WWTF 368758 R5-2013-0022 N
1113938 01/19/2023 Unauthorized Discharge During the inspection of the Town Field, including the tailwater control and return systems, the following violations of the WDR conditions were confirmed: ?Water Recycling Specification G.12: All storm water runoff from the LAAs shall be captured and recycled for irrigation or allowed to percolate within the use areas.? At the time of the inspection Regional Board staff observed a large amount of tailwater pooled along the tailwater control berm on the southeast and south boarders of the Ione wastewater treatment facility LAAs designated the ?Town Field?. Further into the inspection Regional Board staff observed that the tailwater return vault was underwater and the valve was shut off. The Discharger was knowingly not complying with conditions of the WDRs nor implementing their best management practice of returning excess tailwater back to the plant. Board staff also inspected the tailwater control berm, which had been breached and failed in numerous places along the southwest and southern boarders of the Town Field. On the southeastern boarder of the Town Field discharging tailwater was leaving the LAA and flooding the adjacent pastureland to the west of the Town Field. Violation None Inspection Ione WWTF 368758 R5-2013-0022 N
1089763 03/30/2021 Order Conditions 1. It does not appear disinfection has been added to the treatment train as required by the WDRs. This is a violation of Discharge Specification E.4 and Provision I.1.a of the WDRs: Discharge Specification E.4: ¿The City shall operate all systems and equipment to optimize the quality of the discharge.¿ Provision I.1.a: ¿By 31 December 2013, the City shall submit a Phase I Improvements Completion Report (Phase I includes a disinfection contact chamber, see Finding 18) that certifies construction and start-up testing of the new wastewater treatment system and recycling sites have been completed, and certifies that the WWTF can comply with the applicable effluent limitations. The report certify that the improvements were constructed as described in the RWD and this Order, and shall include as-built drawings of the WWTF and recycling site improvements.¿ Violation N Inspection Ione WWTF 368758 R5-2013-0022 N
1113932 01/19/2023 Unauthorized Discharge During the inspection of the Town Field, including the tailwater control and return systems, the following violations of the WDR conditions were confirmed: ?Discharge Prohibition A.1: Discharge of wastes to surface waters or surface water drainage courses is prohibited.? At the time of the inspection Regional Board staff observed a large amount of tailwater pooled along the tailwater control berm on the southeast and south boarders of the Ione wastewater treatment facility LAAs designated the ?Town Field?. Further into the inspection Regional Board staff observed that the tailwater return vault was underwater and the valve was shut off. The Discharger was knowingly not complying with conditions of the WDRs nor implementing their best management practice of returning excess tailwater back to the plant. Board staff also inspected the tailwater control berm, which had been breached and failed in numerous places along the southwest and southern boarders of the Town Field. On the southeastern boarder of the Town Field discharging tailwater was leaving the LAA and flooding the adjacent pastureland to the west of the Town Field. Violation None Inspection Ione WWTF 368758 R5-2013-0022 N
1113935 01/19/2023 Unauthorized Discharge During the inspection of the Town Field, including the tailwater control and return systems, the following violations of the WDR conditions were confirmed: ??Land Application Specification F.4: Any irrigation runoff (tailwater) shall be confined to the LAAs or collected and recycled at the LAAs, and shall not enter any surface water drainage course or storm water drainage system.? At the time of the inspection Regional Board staff observed a large amount of tailwater pooled along the tailwater control berm on the southeast and south boarders of the Ione wastewater treatment facility LAAs designated the ?Town Field?. Further into the inspection Regional Board staff observed that the tailwater return vault was underwater and the valve was shut off. The Discharger was knowingly not complying with conditions of the WDRs nor implementing their best management practice of returning excess tailwater back to the plant. Board staff also inspected the tailwater control berm, which had been breached and failed in numerous places along the southwest and southern boarders of the Town Field. On the southeastern boarder of the Town Field discharging tailwater was leaving the LAA and flooding the adjacent pastureland to the west of the Town Field. Violation None Inspection Ione WWTF 368758 R5-2013-0022 N
1113936 01/19/2023 Unauthorized Discharge During the inspection of the Town Field, including the tailwater control and return systems, the following violations of the WDR conditions were confirmed: ?Discharge Specification B.5: Excluding the water recycling LAAs, all treatment, storage, and disposal systems shall be designed, constructed, operated, and maintained to prevent inundation or washout due to floods with a 100-year return frequency.? At the time of the inspection Regional Board staff observed a large amount of tailwater pooled along the tailwater control berm on the southeast and south boarders of the Ione wastewater treatment facility LAAs designated the ?Town Field?. Further into the inspection Regional Board staff observed that the tailwater return vault was underwater and the valve was shut off. The Discharger was knowingly not complying with conditions of the WDRs nor implementing their best management practice of returning excess tailwater back to the plant. Board staff also inspected the tailwater control berm, which had been breached and failed in numerous places along the southwest and southern boarders of the Town Field. On the southeastern boarder of the Town Field discharging tailwater was leaving the LAA and flooding the adjacent pastureland to the west of the Town Field. Violation None Inspection Ione WWTF 368758 R5-2013-0022 N
1113933 01/19/2023 Unauthorized Discharge During the inspection of the Town Field, including the tailwater control and return systems, the following violations of the WDR conditions were confirmed: ?Discharge Prohibition A.6: Discharge of waste at a location or in a manner different from that described in the Findings is prohibited.? At the time of the inspection Regional Board staff observed a large amount of tailwater pooled along the tailwater control berm on the southeast and south boarders of the Ione wastewater treatment facility LAAs designated the ?Town Field?. Further into the inspection Regional Board staff observed that the tailwater return vault was underwater and the valve was shut off. The Discharger was knowingly not complying with conditions of the WDRs nor implementing their best management practice of returning excess tailwater back to the plant. Board staff also inspected the tailwater control berm, which had been breached and failed in numerous places along the southwest and southern boarders of the Town Field. On the southeastern boarder of the Town Field discharging tailwater was leaving the LAA and flooding the adjacent pastureland to the west of the Town Field. Violation None Inspection Ione WWTF 368758 R5-2013-0022 N
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 8
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
429624 Clean-up and Abatement Order R5-2019-0701 CAO R5-2019-0701 for Greenrock Ranch Lands, LLC WDRMUNILRG 03/22/2019 Active
Total Enforcement Actions: 1
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 05/16/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page