1061270 |
05/31/2019 |
OEV |
Turbidity Monthly Average limit is 5.0 NTU and reported value was 8.4 NTU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1121323 |
09/21/2023 |
OEV |
pH Daily Maximum limit is 8.8 SU and reported value was 8.9 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
1096141 |
07/22/2021 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.7 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1061268 |
06/30/2019 |
OEV |
Turbidity Monthly Average limit is 5.0 NTU and reported value was 13 NTU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1096144 |
07/22/2021 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.6 SU at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1077661 |
06/03/2020 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.8 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1121322 |
08/24/2023 |
OEV |
Temperature Daily Maximum limit is 80 Degrees F and reported value was 81.86 Degrees F at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
1109472 |
08/25/2022 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 9.4 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1109474 |
07/28/2022 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 9.2 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1077663 |
05/27/2020 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.6 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1112929 |
11/17/2022 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.8 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
1109475 |
08/25/2022 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 9.4 SU at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1121321 |
07/20/2023 |
OEV |
Temperature Daily Maximum limit is 80 Degrees F and reported value was 81.5 Degrees F at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
1106480 |
06/23/2022 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.7 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1106481 |
05/19/2022 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.6 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1080557 |
07/30/2020 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 9.5 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1092283 |
05/26/2021 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.7 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1088717 |
02/18/2021 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.7 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1073512 |
02/27/2020 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.6 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1096142 |
08/12/2021 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.7 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1084511 |
11/23/2020 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.6 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1084510 |
12/17/2020 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.6 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1084509 |
12/17/2020 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.6 SU at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1080554 |
07/30/2020 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 9.5 SU at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1080556 |
08/20/2020 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.7 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1077662 |
06/03/2020 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.8 SU at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1103169 |
11/02/2021 |
Late Report |
Report was submitted 1 day late. |
Violation |
N |
Report |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1084508 |
10/07/2020 |
Deficient Monitoring |
Unit one was down for maintenance during the entire month of October. Samples were not collected in October due to maintenance work conducted at power plant. Discharge numbers have been reduced since the start of maintenance work. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1126973 |
03/31/2024 |
Deficient Monitoring |
The following parameters were not analyzed, despite discharge being reported, for the month of March 2024: BOD, Chloride, Copper, Boron, Mercury, Bis(2-ethylhexyl) Phthalate, and TCDD. |
Violation |
N |
Report |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
1103130 |
06/30/2021 |
Deficient Monitoring |
The facility experienced a power outage due to State Water Project Operations Control management which provides daily water and power operation schedules. Therefore, certain parameters were not sampled for June 2021. |
Violation |
N |
Report |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1103129 |
06/30/2021 |
Deficient Monitoring |
The facility experienced a power outage due to State Water Project Operations Control management which provides daily water and power operation schedules. Therefore, monthly parameters were not sampled for June 2021. |
Violation |
N |
Report |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1084505 |
10/07/2020 |
Deficient Monitoring |
Unit one was down for maintenance during the entire month of October. Samples were not collected in October due to maintenance work conducted at power plant. Discharge numbers have been reduced since the start of maintenance work. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1084507 |
10/07/2020 |
Deficient Monitoring |
Unit one was down for maintenance during the entire month of October. Samples were not collected in October due to maintenance work conducted at power plant. Discharge numbers have been reduced since the start of maintenance work. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1103128 |
06/30/2021 |
Deficient Monitoring |
The facility experienced a power outage due to State Water Project Operations Control management which provides daily water and power operation schedules. Therefore, monthly parameters were not sampled for June 2021. |
Violation |
N |
Report |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1103131 |
06/30/2021 |
Deficient Monitoring |
The facility experienced a power outage due to State Water Project Operations Control management which provides daily water and power operation schedules. Therefore, certain parameters were not sampled for June 2021. |
Violation |
N |
Report |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1084506 |
10/07/2020 |
Deficient Monitoring |
Unit one was down for maintenance during the entire month of October. Samples were not collected in October due to maintenance work conducted at power plant. Discharge numbers have been reduced since the start of maintenance work. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1126974 |
03/31/2024 |
Deficient Monitoring |
The following parameters were not analyzed, despite discharge being reported, for the month of March 2024: BOD, Chloride, Total Residual Chlorine, Nitrate + Nitrite, Copper, Boron, Lead, Mercury, Zinc, Dibromochloromethane, Dichlorobromomethane, Tetrachloroethylene, Bis(2-ethylhexyl) Phthalate, Chloroform, Total Trihalomethanes, and TCDD. |
Violation |
N |
Report |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
1096143 |
09/27/2021 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 0.0 Pass/Fail (Pass = 0, Fail = 1) and reported value was 1.0 Pass/Fail (Pass = 0, Fail = 1) at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1103167 |
08/30/2021 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Maximum Daily (MDEL) limit is 0.0 Pass/Fail (Pass = 0, Fail = 1) and reported value was 0.0 Pass/Fail (Pass = 0, Fail = 1) at EFF-001 (A & B). |
Violation |
N |
Report |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1096140 |
08/30/2021 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 0.0 Pass/Fail (Pass = 0, Fail = 1) and reported value was 1.0 Pass/Fail (Pass = 0, Fail = 1) at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1099914 |
11/30/2021 |
CAT2 |
Copper, Total Recoverable Monthly Average limit is 24 ug/L and reported value was 38 ug/L at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1118971 |
06/30/2023 |
CAT2 |
Copper, Total Recoverable Monthly Average limit is 29 ug/L and reported value was 35 ug/L at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
1109473 |
07/28/2022 |
CAT2 |
Copper, Total Recoverable Daily Maximum limit is 79 ug/L and reported value was 80 ug/L at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |
1073513 |
03/31/2020 |
CAT2 |
Copper, Total Recoverable Monthly Average (Mean) limit is 24 ug/L and reported value was 56 ug/L at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1080555 |
09/17/2020 |
CAT2 |
Copper, Total Monthly Average (Mean) limit is 24 ug/L and reported value was 38 ug/L at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
Y |
1118972 |
05/31/2023 |
CAT2 |
Copper, Total Recoverable Monthly Average limit is 29 ug/L and reported value was 48 ug/L at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
1127271 |
07/31/2022 |
CAT2 |
Copper, Total Recoverable Monthly Average (Mean) limit is 24 ug/L and reported value was 80 ug/L at EFF-002. |
Violation |
N |
Report |
William E Warne Power Plant |
399606 |
R4-2016-0224 |
N |