Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
139334 Dana Cole 320 West 4th Street 200 Los Angeles, CA 90013 213-576-5733 dana.cole@waterboards.ca.gov
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
Total Related Places: 0
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
137760 Los Angeles Regional Water Quality Control Board Organization Employee 06/17/2005 None Waterboard
Total Related Parties: 1
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
Total Regulatory Measures: 0
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
1094226 07/09/2019 Unauthorized Discharge Groundwater that surfaced from excavation activities was allowed to flow through the active Project area and discharge into the Los Angeles River. Violation N Inspection Los Angeles (Elysian Valley and Cypress Park 412318 None Y
1094235 07/09/2019 Order Conditions Project footprint exceeded the area permitted by the WQC. Violation N Inspection Los Angeles (Elysian Valley and Cypress Park 412318 None Y
1094237 05/07/2021 Late Report The Commencement of Construction Report and Annual Reports for 2019 and 2020 were not submitted. The Commencement of Construction Report was due at least seven days prior to start of initial ground disturbance activities, and the Annual Reports were due each year on the anniversary of the Project effective date, which were March 14, 2019 and March 14, 2020; however, the reports have not been submitted as of May 7, 2021. Violation N Report Los Angeles (Elysian Valley and Cypress Park 412318 None Y
1094242 09/24/2020 Basin Plan Prohibition Monitoring reports show instances where Basin Plan water quality objectives were not met: turbidity levels in the Los Angeles River downstream of the Project were above 20% of the turbidity levels upstream of the Project; pH levels downstream of the Project exceeded past the permitted 8.5 upper range; and dissolved oxygen (DO) levels fell short of the 5 mg/L objective downstream of the Project. Violation N Report Los Angeles (Elysian Valley and Cypress Park 412318 None Y
1094231 07/09/2019 BMP Soil ramps were without steel plates Violation N Inspection Los Angeles (Elysian Valley and Cypress Park 412318 None Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 5
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
Total Enforcement Actions: 0
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
194335 Los Angeles Regional Water Quality Control Board Enrollee VOLMON 01/01/2000 Historical
Total Regulatory Measures linked to Related Parties: 1
  
  
The current report was generated with data as of: 05/20/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page