? The discharger failed to minimize or prevent pollutants in stormwater discharges through the use of controls, structures, and management practices that achieve BAT for toxic and non-conventional pollutants and BCT for conventional pollutants. ? The discharger failed to cover and berm loose stockpiled construction materials that were not actively being used (i.e., soil, spoils, aggregate, fly-ash, stucco, hydrated lime, etc.). ? The discharger failed to ensure the effectiveness of existing BMPs to reduce or prevent pollutants in stormwater discharges. ? The discharger failed to provide effective soil cover for inactive areas and all finished slopes ? The discharger failed to establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site. ? The discharger failed to effectively manage all run-on, all runoff within the site, and all runoff that discharges off the site. Run-on from off-site shall be directed away from all disturbed areas or shall collectively be in compliance with the effluent limitations in this General Permit. ? The discharger failed to implement good site management ?housekeeping?.
Violation
N
Inspection
4415 Alamo Street
S539668
2009-0009-DWQ
Y
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 1
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
Total Regulatory Measures linked to Related Parties: 0
The current report was generated with data as of: 06/07/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.