Violation ID |
Occurrence Date |
Violation Type |
Violation Description(-) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
1143630 |
02/28/2025 |
Order Conditions |
The power plant pond had a pH greater than 9.0 standard units following the 11 February 2025 and the 16/17 February 2025 unauthorized discharge events. The storm water retention pond had a pH greater than 9.0 standard units following the 11 February 2025 discharge event. |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1143619 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.H. (2/11/2025) (2/17/2025) |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1143618 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.I. (2/11/2025) (2/17/2025) |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1143612 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.F. (2/11/2025) (2/17/2025) |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1143611 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.E. (2/5/2025) (2/11/2025) (2/17/2025) |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1143609 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.D. (2/11/2025) (2/17/2025) |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1143608 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.B. (2/5/2025) (2/11/2025) (2/17/2025) |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1143607 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.A. (2/5/2025) (2/11/2025) (2/17/2025) |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1143606 |
02/28/2025 |
Other Codes |
Failure to provide a report of waste discharge 180 days in advance of the discharge of waste is a violation of CWC Section 13376. (2/5/25) (2/11/2025) (2/17/2025) |
Violation |
None |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1143574 |
04/01/2025 |
Order Conditions |
Log Deck Pond exceeded its 2-foot freeboard requirement until April 6, 2025. The 2-foot freeboard requirement has been achieved from April 6, 2025, through the entire month of April. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
453615 |
R5-2025-0012 |
N |
1142156 |
03/28/2025 |
Order Conditions |
The measured value for total Iron from the samples collected at discharge point SW-001 on 3/28/2025, was 1940 ug/L which exceeded the Storm Water Action Level of 1000 ug/L. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1142155 |
03/05/2025 |
Order Conditions |
The measured value for total Iron from the samples collected at discharge point SW-001 on 3/5/2025, was 2090 ug/L which exceeded the Storm Water Action Level of 1000 ug/L. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1142154 |
03/28/2025 |
Order Conditions |
The measured value for total Aluminum from the samples collected at discharge point SW-001 on 3/28/2025, was 1550 ug/L which exceeded the Storm Water Action Level of 750 ug/L. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1142153 |
03/05/2025 |
Order Conditions |
The measured value for total Aluminum from the samples collected at discharge point SW-001 on 3/5/2025, was 1430 ug/L which exceeded the Storm Water Action Level of 750 ug/L. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1142152 |
02/28/2025 |
Order Conditions |
The Discharger failed to maintain a freeboard of 2 feet or greater in the power plant pond and the log deck pond and the inability to maintain adequate freeboard was not due to direct precipitation or storm water runoff occurring as a result of annual precipitation with a greater than 100-year recurrence interval, or a storm event with an intensity greater than a 25-year, 24-hour storm event. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1142151 |
12/28/2024 |
Order Conditions |
Log Deck pond in freeboard violation from December 28, 2024, thru March 31, 2025. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1141488 |
02/13/2025 |
Order Conditions |
The measured value for total Aluminum from the samples collected at discharge point SW-001 on 2/13/2025 was 2810 ug/L, which exceeded the Storm Water Action Level of 750 ug/L. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1141487 |
02/28/2025 |
Order Conditions |
The measured value for total Aluminum from the samples collected at discharge point SW-001 on 2/28/2025 was 2050 ug/L, which exceeded the Storm Water Action Level of 750 ug/L. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1141486 |
02/13/2025 |
Order Conditions |
The measured value for total Iron from the samples collected at discharge point SW-001 on 2/13/2025 was 2690 ug/L, which exceeded the Storm Water Action Level of 1000 ug/L. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1141485 |
02/28/2025 |
Order Conditions |
The measured value for total Iron from the samples collected at discharge point SW-001 on 2/28/2025 was 2390 ug/L, which exceeded the Storm Water Action Legel of 1000 ug/L. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1140563 |
12/28/2024 |
Order Conditions |
Power plant pond in freeboard violation from December 28, 2024 through January 12, 2025. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1140562 |
12/28/2024 |
Order Conditions |
Log deck pond in continuous freeboard violation from December 28, 2024 through entire month of January 2025. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1140561 |
01/10/2025 |
Order Conditions |
The measured value for total Aluminum from the samples collected at discharge point EFF-001 on 1/10/2025 was 1390 ug/L, which exceeded the Storm Water Action Level of 750 ug/L. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1140560 |
01/03/2025 |
Deficient Monitoring |
The measured value for total Aluminum from the samples collected at discharge point EFF-001 on 1/3/2025 was 6280 ug/L, which exceeded the Storm Water Action Level of 750 ug/L. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1140559 |
01/03/2025 |
Order Conditions |
The measured value for total Iron from the samples collected at discharge point EFF-001 on 1/3/2025 was 4670 ug/L, which exceeded the Storm Water Action Level of 1000 ug/L. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1140558 |
01/10/2025 |
Order Conditions |
The measured value for total Iron from the samples collected at discharge point EFF-001 on 1/10/2025 was 1160 ug/L, which exceeded the Storm Water Action Level of 1000 ug/L. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1139093 |
12/28/2024 |
Order Conditions |
Log Deck pond exceeded its freeboard requirement on December 28, 2024 thru December 31, 2024. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1139089 |
12/28/2024 |
Order Conditions |
Power Plant pond exceeded its freeboard requirement on December 28, 2024 thru December 31, 2024. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1138310 |
11/24/2024 |
Order Conditions |
Log Deck Pond exceeded the 2ft Freeboard requirement from 11/24/2024 to 12/14/2024. The power plant was unable to process water the entire month of November. In addition, there was an atmospheric river event week of November 21 which dropped 1.5 ft of snow followed with five (5) inches of rain. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1138309 |
11/22/2024 |
Order Conditions |
Power Plant Pond exceeded the 2ft Freeboard requirement from 11/22/2024 to 12/10/2024. The power plant was unable to process water the entire month of November. In addition, there was an atmospheric river event week of November 21 which dropped 1.5 ft of snow followed with five (5) inches of rain. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1125103 |
02/14/2024 |
Order Conditions |
The allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 samples result of 2.82 NTU is +1 NTU. The RSW-002 sample result of 4.31 NTUs is an increase of 1.49 NTUs. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1125100 |
02/01/2024 |
Order Conditions |
The allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 samples result of 3.48 NTUs is + 1 NTU. The RSW-002 sample result was 5.76 NTUs, which was an increase of 2.26 NTUs. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1124331 |
01/03/2024 |
Order Conditions |
The allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 sample result of 5.23 ntu was a 20% increase. The RSW-002 sample result was 8.1 ntu which was an increase of 54%. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1112512 |
12/31/2022 |
Order Conditions |
The Discharger violated the pond freeboard requirements, specified in section VI.C.4.a.iv. of their permit, at LND-003 on 12/7/22, 12/14/22, 12/21/22, and 12/28/22. |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1112239 |
01/02/2023 |
Late Report |
Monthly SMR ( MONNPDES ) report for November 2022 (2418694) was due on 01-JAN-23 |
Violation |
None |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1105939 |
01/03/2022 |
Other Codes |
Violation of CWC section 13376. Failure to provide a report of discharge 180 days in advance of the discharging from the log deck recycling pond to Canyon Creek, a water of the U.S. |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1105938 |
01/03/2022 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibition III.F. |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1105937 |
01/03/2022 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibition III.D. |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1105936 |
01/03/2022 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibition III.B. |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1105935 |
01/03/2022 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibition III.A. |
Violation |
N |
Report |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1101297 |
01/03/2022 |
Unauthorized Discharge |
Unauthorized discharge occurred at log deck pond due to freezing temperatures causing drain valve to fail, which allowed log deck pond water to be discharged from the site. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
1099690 |
12/14/2021 |
Order Conditions |
Based on results reported for the storm water discharge samples collected on December 14, 2021 at monitoring locations RSW-001 and RSW-002, the allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 sample result was 20% and the total increase was 83%. This was the result of the large rain event directly preceding this sampling event. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1098318 |
11/09/2021 |
Order Conditions |
Based on results reported for the storm water discharge samples collected on November 9, 2021 at monitoring locations RSW-001 and RSW-002, the allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 sample result was 20% and the total increase was 25%. This may have been the result of the large rain event directly preceding this sampling event. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
N |
1084928 |
12/17/2020 |
ATOX |
Acute Toxicity-Rainbow Trout-survival Instantaneous Minimum limit is 70 % survival and reported value was 60 % survival at EFF-001. |
Violation |
N |
eSMR |
Burney Cogeneration/Sawmill |
433220 |
R5-2019-0048 |
Y |
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
|