The following parameters were not analyzed, despite discharge being reported, for the month of March 2024: BOD, Chloride, Copper, Boron, Mercury, Bis(2-ethylhexyl) Phthalate, and TCDD.
Violation
N
Report
William E Warne Power Plant
446992
R4-2022-0237
N
1118971
06/30/2023
CAT2
Copper, Total Recoverable Monthly Average limit is 29 ug/L and reported value was 35 ug/L at EFF-002.
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
Y
1121322
08/24/2023
OEV
Temperature Daily Maximum limit is 80 Degrees F and reported value was 81.86 Degrees F at EFF-001 (A & B).
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
Y
1121323
09/21/2023
OEV
pH Daily Maximum limit is 8.8 SU and reported value was 8.9 SU at EFF-001 (A & B).
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
Y
1126974
03/31/2024
Deficient Monitoring
The following parameters were not analyzed, despite discharge being reported, for the month of March 2024: BOD, Chloride, Total Residual Chlorine, Nitrate + Nitrite, Copper, Boron, Lead, Mercury, Zinc, Dibromochloromethane, Dichlorobromomethane, Tetrachloroethylene, Bis(2-ethylhexyl) Phthalate, Chloroform, Total Trihalomethanes, and TCDD.
Violation
N
Report
William E Warne Power Plant
446992
R4-2022-0237
N
1121321
07/20/2023
OEV
Temperature Daily Maximum limit is 80 Degrees F and reported value was 81.5 Degrees F at EFF-001 (A & B).
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
Y
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 6
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
Total Regulatory Measures linked to Related Parties: 4
The current report was generated with data as of: 05/31/2024