Turbidity Daily Maximum limit is 25 NTU and reported value was 330 NTU at EFF-00
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1139581
12/12/2024
CAT2
Chlorine, Total Residual Daily Maximum limit is 0.1 mg/L and reported value was
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1148929
09/30/2025
Deficient Monitoring
No samples were collected in September 2025 due to the plant being offline for p
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1142413
01/16/2025
CAT1
Chloride 3-Sample Average (Mean) limit is 100 mg/L and reported value was 101 mg
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1148935
08/21/2025
CAT2
Copper, Total Recoverable Daily Maximum limit is 77 ug/L and reported value was
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1139582
11/14/2024
Deficient Monitoring
Dioxins and Furans samples were missed because the lab did not send the bottles
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1142416
02/13/2025
CAT1
Chloride 3-Sample Average (Mean) limit is 100 mg/L and reported value was 111 mg
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1148928
09/30/2025
Deficient Monitoring
No samples were collected in September 2025 due to the plant being offline for p
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1148932
08/21/2025
OEV
Turbidity Monthly Average limit is 5 NTU and reported value was 20.55 NTU at EFF
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1148936
08/21/2025
CAT1
Settleable Solids Daily Maximum limit is 0.3 ml/L and reported value was 0.9 ml/
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1148938
08/21/2025
CAT2
Copper, Total Recoverable Monthly Average (Mean) limit is 0.005 lb/day and repor
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1142414
03/13/2025
OEV
Turbidity Monthly Average limit is 5 NTU and reported value was 84.9 NTU at EFF-
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1148934
08/21/2025
CAT1
Total Suspended Solids (TSS) Daily Maximum limit is 75 mg/L and reported value w
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1145195
05/15/2025
OEV
pH Instantaneous Maximum limit is 8.6 SU and reported value was 8.7 SU at EFF-00
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1148931
09/30/2025
Deficient Monitoring
No samples were collected in September 2025 due to the plant being offline for p
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1148933
08/21/2025
OEV
Turbidity Daily Maximum limit is 25 NTU and reported value was 40 NTU at EFF-002
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1148937
08/21/2025
CAT2
Lead, Total Monthly Average (Mean) limit is 8 ug/L and reported value was 10 ug/
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1139583
11/14/2024
Deficient Monitoring
Dioxins and Furans samples were missed because the lab did not send the bottles
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1139584
12/12/2024
CAT1
Boron, Total Monthly Average limit is 1.5 mg/L and reported value was 2.6 mg/L a
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1145196
04/17/2025
OEV
Turbidity Monthly Average limit is 5.0 NTU and reported value was 6.45 NTU at EF
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
1148930
09/30/2025
Deficient Monitoring
No samples were collected in September 2025 due to the plant being offline for p
Violation
N
eSMR
William E Warne Power Plant
446992
R4-2022-0237
N
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 21
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
Total Regulatory Measures linked to Related Parties: 4
The current report was generated with data as of: 11/07/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.