Violation ID |
Occurrence Date |
Violation Type |
Violation Description(-) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
1142514 |
07/30/2024 |
Late Report |
According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 7/30/2024 but not submitted until 8/2/2024. |
Violation |
None |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1142513 |
04/30/2024 |
Late Report |
According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 4/30/2024 but not submitted until 8/3/2024. |
Violation |
None |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1142512 |
01/30/2024 |
Late Report |
According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 1/30/2024 but not submitted until 8/3/2024. |
Violation |
None |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1142511 |
10/30/2023 |
Late Report |
According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 10/30/2023 but not submitted until 8/3/2024. |
Violation |
None |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1142509 |
07/30/2023 |
Late Report |
According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 7/30/2023 but not submitted until 8/3/2024. |
Violation |
None |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1142508 |
04/30/2023 |
Late Report |
According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 4/30/2023 but not submitted until 8/3/2024. |
Violation |
None |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1142507 |
01/30/2023 |
Late Report |
According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 1/30/2023 but not submitted until 2/3/2023. |
Violation |
None |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1142506 |
10/30/2022 |
Late Report |
According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 10/30/2022 but not submitted until 2/3/2023. |
Violation |
None |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1142505 |
07/30/2022 |
Late Report |
According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 7/30/2022 but not submitted until 8/26/2022. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1142504 |
04/30/2022 |
Late Report |
According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 4/30/2022 but not submitted until 8/26/2022. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139211 |
04/30/2024 |
Order Conditions |
Freeboard Instantaneous Minimum limit is 24 inches and reported value was 20 inches. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139210 |
06/30/2024 |
Deficient Reporting |
The total volume of wastewater flow to the facility for each day and maximum instantaneous flow rate occurring each day were not reported. Total monthly flow and average daily flow were also not reported in April 2024; No samples were analyzed in April 2024; Semi-annual constituents were not analyzed. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139209 |
03/30/2024 |
Deficient Reporting |
The total volume of wastewater flow to the facility for each day, total volume of wastewater flow to the facility for each month, maximum instantaneous flow rate occurring each day, and the average flow rate of wastewater flow to the facility for each month were not reported; No samples were analyzed in January 2024, February 2024, and March 2024; Semi-annual constituents were not analyzed. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139208 |
12/30/2023 |
Deficient Reporting |
The total volume of wastewater flow to the facility for each day, total volume of wastewater flow to the facility for each month, maximum instantaneous flow rate occurring each day, and the average flow rate of wastewater flow to the facility for each month were not reported; No samples were analyzed in October 2023, November 2023, and December 2023. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139207 |
09/30/2023 |
Deficient Reporting |
The total volume of wastewater flow to the facility for each day, total volume of wastewater flow to the facility for each month, maximum instantaneous flow rate occurring each day, the average flow rate of wastewater flow to the facility for each month, and pond freeboard were not reported; No samples were analyzed in July 2023, August 2023, and September 2023; Semi-annual and summer annual constituents were not analyzed. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139085 |
06/30/2023 |
Deficient Reporting |
The total volume of wastewater flow to the facility for each day, total volume of wastewater flow to the facility for each month, maximum instantaneous flow rate occurring each day, and the average flow rate of wastewater flow to the facility for each month were not reported. Pond freeboard were also not reported in April 2023; No samples were analyzed in April 2023 and May 2023; Dissolved Oxygen was not analyzed. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139084 |
03/30/2023 |
Deficient Reporting |
The total volume of wastewater flow to the facility for each day, total volume of wastewater flow to the facility for each month, maximum instantaneous flow rate occurring each day, and the average flow rate of wastewater flow to the facility for each month were not reported; No samples were analyzed in January 2023, February 2023, and March 2023; Semi-annual constituents were not analyzed. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139083 |
10/25/2022 |
CAT1 |
Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 30-Day Average limit is 30 mg/L and reported value was 61 mg/L. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139082 |
12/30/2022 |
Deficient Reporting |
The total volume of wastewater flow to the facility for each day and maximum instantaneous flow rate occurring each day were not reported; No samples were analyzed in November 2022 and December 2022; pH and Dissolved Oxygen were not analyzed. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139081 |
09/08/2022 |
CAT1 |
Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 30-Day Average limit is 30 mg/L and reported value was 100 mg/L. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139080 |
08/19/2022 |
CAT1 |
Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 30-Day Average limit is 30 mg/L and reported value was 34 mg/L. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139077 |
09/30/2022 |
Deficient Reporting |
The total volume of wastewater flow to the facility for each day and maximum instantaneous flow rate occurring each day were not reported; No samples were analyzed in August 2022; pH and Dissolved Oxygen were not analyzed; Semi-annual and summer annual constituents were not analyzed. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139076 |
06/30/2022 |
Deficient Reporting |
The total volume of wastewater flow to the facility for each day and maximum instantaneous flow rate occurring each day were not reported. Total monthly flow, average daily flow, and pond freeboard were also not reported for the month April; pH and Dissolved Oxygen were not analyzed. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1108671 |
08/26/2022 |
Late Report |
Section II.A states submittal period requirements. These requirements state, ¿Beginning on the 15th of the month following the first quarter after the adoption for this permit, a monitoring report including the preceding information shall be submitted to the Board. Subsequent monitoring reports shall be submitted to the Board by the 15th day month following each quarter.¿ This report was due on 4/15/2022 and has yet to be submitted. Quarterly monitoring report was submitted 133 days late from the due date to the submission date. |
Violation |
N |
Report |
Rock Creek Area WTP |
146146 |
92-107 |
Y |
1108670 |
08/26/2022 |
Late Report |
Section II.A states submittal period requirements. These requirements state, ¿Beginning on the 15th of the month following the first quarter after the adoption for this permit, a monitoring report including the preceding information shall be submitted to the Board. Subsequent monitoring reports shall be submitted to the Board by the 15th day month following each quarter.¿ This report was due on 7/15/2022 and was not submitted until 8/26/2022. Quarterly monitoring report was submitted 42 days late from the due date to the submission date. |
Violation |
N |
Report |
Rock Creek Area WTP |
146146 |
92-107 |
Y |
1106861 |
03/11/2022 |
Late Report |
Section II.A states submittal period requirements. These requirements state, ¿Beginning on the 15th of the month following the first quarter after the adoption for this permit, a monitoring report including the preceding information shall be submitted to the Board. Subsequent monitoring reports shall be submitted to the Board by the 15th day month following each quarter.¿ This report was due on 1/15/2022 but not submitted until 3/11/2022. Quarterly monitoring report was submitted 55 days late from the due date to the submission date. |
Violation |
N |
Report |
Rock Creek Area WTP |
146146 |
92-107 |
N |
1106860 |
03/11/2022 |
Late Report |
Section II.A states submittal period requirements. These requirements state, ¿Beginning on the 15th of the month following the first quarter after the adoption for this permit, a monitoring report including the preceding information shall be submitted to the Board. Subsequent monitoring reports shall be submitted to the Board by the 15th day month following each quarter.¿ This report was due on 10/15/2021 but not submitted until 3/11/2022. Quarterly monitoring report was submitted 147 days late from the due date to the submission date. |
Violation |
N |
Report |
Rock Creek Area WTP |
146146 |
92-107 |
N |
1106859 |
07/27/2021 |
Late Report |
Section II.A states submittal period requirements. These requirements state, ¿Beginning on the 15th of the month following the first quarter after the adoption for this permit, a monitoring report including the preceding information shall be submitted to the Board. Subsequent monitoring reports shall be submitted to the Board by the 15th day month following each quarter.¿ This report was due on 7/15/2021 but not submitted until 7/27/2021. Quarterly monitoring report was submitted 12 days late from the due date to the submission date. |
Violation |
N |
Report |
Rock Creek Area WTP |
146146 |
92-107 |
N |
1106858 |
07/27/2021 |
Late Report |
Section II.A states submittal period requirements. These requirements state, ¿Beginning on the 15th of the month following the first quarter after the adoption for this permit, a monitoring report including the preceding information shall be submitted to the Board. Subsequent monitoring reports shall be submitted to the Board by the 15th day month following each quarter.¿ This report was due on 4/15/2021 but not submitted until 7/27/2021. Quarterly monitoring report was submitted 103 days late from the due date to the submission date. |
Violation |
N |
Report |
Rock Creek Area WTP |
146146 |
92-107 |
N |
1105734 |
11/02/2021 |
Late Report |
According to the WDR, Pg. 17 Section II.B. states submittal period requirements. These requirements state, ¿Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter.¿ This report was due on 10/30/2021 but not submitted until 3/11/2022. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1105720 |
11/02/2021 |
Deficient Reporting |
According to the WDRs, Pg. 4 Section I.A.1-4 & Pg. 15 Section I.B. states effluent reporting requirements. These requirements state, ¿Grab samples of the effluent discharged to the first pond from which percolation can occur, shall be collected and analyzed to determine the magnitude of the following parameters.¿ Monitoring samples were not given in the report as required by WDRs. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1105717 |
02/01/2022 |
Deficient Reporting |
According to the WDRs, Pg. 4 Section I.A.1-4 & Pg. 15 Section I.B. states effluent reporting requirements. These requirements state, "Grab samples of the effluent discharged to the first pond from which percolation can occur, shall be collected and analyzed to determine the magnitude of the following parameters." Monitoring samples were not given in the report as required by WDRs. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1105716 |
03/11/2022 |
Late Report |
According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 1/30/2022 but not submitted until 3/11/2022. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1105715 |
11/02/2021 |
Deficient Reporting |
According to the WDRs, Pg. 4 Section I.A.1-4 & Pg. 15 Section I.B. states effluent reporting requirements. These requirements state, ¿Grab samples of the effluent discharged to the first pond from which percolation can occur, shall be collected and analyzed to determine the magnitude of the following parameters.¿ Monitoring samples were not given in the report as required by WDRs. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1105714 |
11/02/2021 |
Late Report |
According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 10/30/2021 but not submitted until 3/11/2022. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1105712 |
06/30/2021 |
Deficient Reporting |
According to the WDRs, Pg. 4 Section I.A.1-4 & Pg. 15 Section I.B. states effluent reporting requirements. These requirements state, "Grab samples of the effluent discharged to the first pond from which percolation can occur, shall be collected and analyzed to determine the magnitude of the following parameters." Monitoring samples were not given in the report as required by WDR |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1105711 |
03/31/2021 |
Deficient Reporting |
According to the WDRs, Pg. 4 Section I.A.1-4 & Pg. 15 Section I.B. states effluent reporting requirements. These requirements state, "Grab samples of the effluent discharged to the first pond from which percolation can occur, shall be collected and analyzed to determine the magnitude of the following parameters." Monitoring samples were not given in the report and as required by WDR. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1093977 |
04/30/2021 |
Late Report |
Reports submitted 91 days late. Violating Board Order R6V-2000-0016 MRP section II. B |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1081040 |
10/30/2020 |
Other Codes |
Quarterly monitoring reports shall be submitted to the Regional Board by the 30th day following the end of each quarter via GeoTracker. Violates Board Order 6-00-16 MRP II.B and Amendment to MRP. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1081034 |
07/30/2020 |
Late Report |
Quarterly monitoring reports shall be submitted to the Regional Board by the 30th day following the end of each quarter. The 2020 2nd Quarter Monitoring Report was not turned in. Violates Board Order No. 6V-00-16 MRP II.B. |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
|