Violation ID |
Occurrence Date |
Violation Type |
Violation Description(+) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
1131210 |
06/30/2024 |
Deficient Reporting |
Failure to sample monthly June and quarterly requirements at CCS |
Violation |
None |
Report |
Westside Subway Purple Line Ext Sect 2, Constellation Stn |
429939 |
R4-2018-0125 |
N |
1127610 |
05/02/2024 |
Late Report |
Quarterly SMR ( MONNPDES ) report for Q1 2024 (2716230) was due on 01-MAY-24 |
Violation |
None |
Report |
Metropolitan Stevedore Company Bulk Marine Terminal |
436049 |
R4-2023-0035 |
N |
1139035 |
01/02/2025 |
Late Report |
Once Only OneTime ( TECHRPT ) (1/permit cycle report) report for 2020/04/01 (232 |
Violation |
None |
Report |
Olympic Tank Farm |
433032 |
R4-2020-0025 |
N |
1130716 |
04/24/2024 |
CAT2 |
Zinc, Total Recoverable Maximum Daily (MDEL) limit is 55 ug/L and reported value |
Violation |
N |
eSMR |
Dominguez Hills Tank Farm |
441555 |
R4-2023-0374 |
Y |
1127630 |
02/29/2024 |
CAT2 |
Copper, Total Recoverable Monthly Average limit is 7 ug/L and reported value was |
Violation |
N |
Report |
Westside Subway Purple Line Ext Sect 2, Constellation Stn |
429939 |
R4-2018-0125 |
Y |
1136938 |
07/31/2024 |
CAT1 |
Oil and Grease Monthly Average limit is 10 mg/L and reported value was 15 mg/L. |
Violation |
N |
Report |
960 Doheny Condominium |
193578 |
R4-2013-0095 |
Y |
1127390 |
03/06/2024 |
OEV |
pH Instantaneous Minimum limit is 6.5 SU and reported value was 6.2 SU at EFF-00 |
Violation |
N |
eSMR |
Dominguez Hills Tank Farm |
441555 |
R4-2023-0374 |
Y |
1127389 |
03/13/2024 |
OEV |
pH Instantaneous Minimum limit is 6.5 SU and reported value was 4.1 SU at EFF-00 |
Violation |
N |
eSMR |
Dominguez Hills Tank Farm |
441555 |
R4-2023-0374 |
Y |
1133014 |
03/31/2024 |
Deficient Reporting |
E. Coli Density was not sampled for in order to meet the required quarterly freq |
Violation |
N |
Report |
Wilshire Rodeo Plaza |
193383 |
R4-2018-0125 |
N |
1130537 |
05/01/2024 |
Deficient Monitoring |
Per Section 4.1 of the MRP, effluent samples shall be analyzed weekly for total |
Violation |
N |
eSMR |
Whittier Narrows Water Reclamation Plant |
443746 |
R4-2021-0096 |
N |
1138933 |
10/20/2024 |
OEV |
Total Coliform Single Sample Maximum limit is 240 MPN/100 mL and reported value |
Violation |
N |
eSMR |
Los Coyotes WRP |
445113 |
R4-2021-0142 |
N |
1130367 |
03/23/2024 |
Deficient Reporting |
All weekly requirements not reported weekly (3/17-3/23) due to sampling on a day |
Violation |
N |
Report |
Camarillo WRP |
428243 |
R4-2019-0136 |
N |
1131050 |
07/25/2024 |
OEV |
Enterococci Daily Maximum limit is 104 MPN/100 mL and reported value was 490 MPN |
Violation |
N |
eSMR |
Seaside Lagoon |
400243 |
R4-2017-0178 |
N |
1132373 |
05/06/2024 |
CAT2 |
Vinyl Chloride Daily Maximum limit is 0.5 ug/L and reported value was 1.7 ug/L. |
Violation |
N |
Report |
Route 105 Dewatering System - Garfield & Downey Pump Stations |
194088 |
R4-2018-0087 |
N |
1130091 |
05/09/2024 |
Deficient Monitoring |
Per Section 4.1 of the MRP, total coliform and enterococcus shall be analyzed da |
Violation |
N |
eSMR |
A.K. Warren Water Resource Facility |
452398 |
R4-2023-0181 |
N |
1132882 |
07/10/2024 |
OEV |
Total Coliform Other limit is 23 MPN/100 mL and reported value was 46.6 MPN/100 |
Violation |
N |
eSMR |
Camarillo WRP |
428243 |
R4-2019-0136 |
N |
1127632 |
03/31/2024 |
Deficient Reporting |
pH, temp, turbidity, TSS, BOB, O&G, SS, Sulfides, Res Chlorine, MBAS not sampled |
Violation |
N |
Report |
Westside Subway Purple Line Ext Sect 2, Constellation Stn |
429939 |
R4-2018-0125 |
N |
1134926 |
07/30/2024 |
CAT2 |
Copper, Total Recoverable Monthly Average limit is 29.1 mg/L and reported value |
Violation |
N |
eSMR |
TFX Aviation, Inc. (Former Telair Site, Newbury Park) |
436207 |
R4-2021-0098 |
N |
1135989 |
08/20/2024 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median Pass/Fail (Pass = 0, Fail |
Violation |
N |
eSMR |
Long Beach WRP |
447474 |
R4-2022-0032 |
N |
1139996 |
11/30/2024 |
CAT2 |
Chlorine, Total Residual Maximum Daily (MDEL) limit is 0.10 mg/L and reported va |
Violation |
N |
eSMR |
San Jose Creek Water Reclamation Plant |
443109 |
R4-2021-0131 |
N |
1133008 |
04/30/2024 |
Deficient Monitoring |
The following constituents were sampled from the sump and not the sampling port: |
Violation |
N |
Report |
Wilshire Rodeo Plaza |
193383 |
R4-2018-0125 |
N |
1135979 |
08/18/2024 |
Deficient Monitoring |
Per Section 4.1 of the MRP, Oil and Grease shall be analyzed weekly in the efflu |
Violation |
N |
eSMR |
A.K. Warren Water Resource Facility |
452398 |
R4-2023-0181 |
N |
1131209 |
05/31/2024 |
Deficient Reporting |
Failure to sample monthly May requirements at CCS |
Violation |
N |
Report |
Westside Subway Purple Line Ext Sect 2, Constellation Stn |
429939 |
R4-2018-0125 |
N |
1133013 |
03/31/2024 |
Deficient Monitoring |
The following constituent was sampled from the sump and not the sampling port: L |
Violation |
N |
Report |
Wilshire Rodeo Plaza |
193383 |
R4-2018-0125 |
N |
1129932 |
06/24/2024 |
OEV |
Fecal Coliform Daily Maximum limit is 400 MPN/100 mL and reported value was 500 |
Violation |
N |
eSMR |
Seaside Lagoon |
400243 |
R4-2017-0178 |
N |
1130445 |
05/02/2024 |
Surface Water |
Per Section 5.1.3 of the WDR, the dissolved oxygen (DO) in the receiving water s |
Violation |
N |
eSMR |
Long Beach WRP |
447474 |
R4-2022-0032 |
N |
1137639 |
09/03/2024 |
CAT2 |
Aldrin Monthly Average limit is 0.0037 ug/L and reported value was 0.01 ug/L at |
Violation |
N |
eSMR |
A.K. Warren Water Resource Facility |
452398 |
R4-2023-0181 |
N |
1131760 |
06/13/2024 |
CAT1 |
Settleable Solids Daily Maximum limit is 0.3 ml/L and reported value was 2.5 ml/ |
Violation |
N |
Report |
Route I-10 Pavement Rehab. Project |
193489 |
R4-2013-0095 |
N |
1129930 |
05/30/2024 |
OEV |
Enterococci Daily Maximum limit is 104 MPN/100 mL and reported value was 160 MPN |
Violation |
N |
eSMR |
Seaside Lagoon |
400243 |
R4-2017-0178 |
N |
1134442 |
07/31/2024 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 0 Pass/Fail (Pass |
Violation |
N |
eSMR |
Long Beach WRP |
447474 |
R4-2022-0032 |
N |
1132367 |
09/19/2024 |
Deficient Reporting |
settleable solids, TDS, TSS not sampled monthly |
Violation |
N |
Report |
Route 105 Dewatering System - Garfield & Downey Pump Stations |
194088 |
R4-2018-0087 |
N |
1133009 |
05/31/2024 |
Deficient Monitoring |
The following constituents were sampled from the sump and not the sampling port: |
Violation |
N |
Report |
Wilshire Rodeo Plaza |
193383 |
R4-2018-0125 |
N |
1133012 |
03/31/2024 |
Deficient Monitoring |
The following constituents were sampled from the sump and not the sampling port: |
Violation |
N |
Report |
Wilshire Rodeo Plaza |
193383 |
R4-2018-0125 |
N |
1131939 |
02/29/2024 |
Deficient Reporting |
Vault 6 not sampled January and February 2024 |
Violation |
N |
Report |
Route I-10 Pavement Rehab. Project |
193489 |
R4-2013-0095 |
N |
1137438 |
09/30/2024 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 0 Pass/Fail (Pass |
Violation |
N |
eSMR |
Saugus Water Reclamation Plant |
442544 |
R4-2022-0175 |
N |
1131761 |
06/30/2024 |
CAT1 |
Settleable Solids Monthly Average limit is 0.1 ml/L and reported value was 2.5 m |
Violation |
N |
Report |
Route I-10 Pavement Rehab. Project |
193489 |
R4-2013-0095 |
N |
1129461 |
04/30/2024 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 0 Pass/Fail (Pass |
Violation |
N |
eSMR |
Long Beach WRP |
447474 |
R4-2022-0032 |
N |
1128592 |
03/31/2024 |
Deficient Monitoring |
Per Section 4 of the MRP, effluent samples shall be analyzed quarterly for oil a |
Violation |
N |
eSMR |
Pomona Water Reclamation Plant |
432902 |
R4-2021-0097 |
N |
1137638 |
09/30/2024 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 0 Pass/Fail (Pass |
Violation |
N |
eSMR |
San Jose Creek Water Reclamation Plant |
443109 |
R4-2021-0131 |
N |
1135993 |
08/31/2024 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 0 Pass/Fail (Pass |
Violation |
N |
eSMR |
San Jose Creek Water Reclamation Plant |
443109 |
R4-2021-0131 |
N |
1130365 |
03/31/2024 |
Deficient Reporting |
All monthly (except CTox) requirements not reported monthly due to sampling on a |
Violation |
N |
Report |
Camarillo WRP |
428243 |
R4-2019-0136 |
N |
1128561 |
03/31/2024 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 1 Pass/Fail (Pass |
Violation |
N |
eSMR |
San Jose Creek Water Reclamation Plant |
443109 |
R4-2021-0131 |
N |
1134925 |
07/30/2024 |
CAT1 |
Total Dissolved Solids (TDS) Daily Maximum limit is 850 mg/L and reported value |
Violation |
N |
eSMR |
TFX Aviation, Inc. (Former Telair Site, Newbury Park) |
436207 |
R4-2021-0098 |
N |
1132725 |
05/31/2024 |
Deficient Reporting |
flow not reported monthly in May |
Violation |
N |
Report |
960 Doheny Condominium |
193578 |
R4-2013-0095 |
N |
1135994 |
08/31/2024 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 0 Pass/Fail (Pass |
Violation |
N |
eSMR |
San Jose Creek Water Reclamation Plant |
443109 |
R4-2021-0131 |
N |
1133010 |
06/30/2024 |
Deficient Monitoring |
The following constituents were sampled from the sump and not the sampling port: |
Violation |
N |
Report |
Wilshire Rodeo Plaza |
193383 |
R4-2018-0125 |
N |
1130444 |
05/31/2024 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 0 Pass/Fail (Pass |
Violation |
N |
eSMR |
Long Beach WRP |
447474 |
R4-2022-0032 |
N |
1132602 |
06/11/2024 |
Late Report |
report due 2/14/24, rec'd 6/11/24, 118 days late |
Violation |
N |
Report |
Beverly Atrium |
315842 |
R4-2013-0095 |
N |
1131052 |
07/10/2024 |
OEV |
Enterococci Daily Maximum limit is 104 MPN/100 mL and reported value was 830 MPN |
Violation |
N |
eSMR |
Seaside Lagoon |
400243 |
R4-2017-0178 |
N |
1139999 |
11/28/2024 |
Deficient Monitoring |
Per Section 4.1 of the MRP, effluent samples shall be analyzed monthly for aldri |
Violation |
N |
eSMR |
A.K. Warren Water Resource Facility |
452398 |
R4-2023-0181 |
N |
1129931 |
06/03/2024 |
OEV |
Enterococci Daily Maximum limit is 104.0 MPN/100 mL and reported value was 370.0 |
Violation |
N |
eSMR |
Seaside Lagoon |
400243 |
R4-2017-0178 |
N |
1137637 |
09/30/2024 |
CTOX |
Chronic Toxicity Monthly Median limit is 0 Pass/Fail (Pass = 0, Fail = 1) and re |
Violation |
N |
eSMR |
Long Beach WRP |
447474 |
R4-2022-0032 |
N |
1135995 |
08/31/2024 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 0 Pass/Fail (Pass |
Violation |
N |
eSMR |
Pomona Water Reclamation Plant |
432902 |
R4-2021-0097 |
N |
1130583 |
05/31/2024 |
OEV |
Turbidity Daily Average (Mean) limit is 2 NTU and reported value was 3 NTU at EF |
Violation |
N |
eSMR |
Saugus Water Reclamation Plant |
442544 |
R4-2022-0175 |
N |
1130366 |
03/09/2024 |
Deficient Reporting |
All weekly requirements not reported weekly (3/3-3/9) due to sampling on a day w |
Violation |
N |
Report |
Camarillo WRP |
428243 |
R4-2019-0136 |
N |
1129298 |
04/03/2024 |
CAT2 |
Cyanide, Total (as CN) Daily Maximum limit is 8.5 ug/L and reported value was 10 |
Violation |
N |
eSMR |
Camarillo WRP |
428243 |
R4-2019-0136 |
N |
1129299 |
04/03/2024 |
CAT2 |
Cyanide, Total (as CN) Monthly Average limit is 4.2 ug/L and reported value was |
Violation |
N |
eSMR |
Camarillo WRP |
428243 |
R4-2019-0136 |
N |
1135595 |
08/07/2024 |
Deficient Monitoring |
Subcontract lab(WECK) received empty effluent bottle(s) for analytes: bentazon, |
Violation |
N |
eSMR |
Camarillo WRP |
428243 |
R4-2019-0136 |
N |
1131051 |
07/25/2024 |
OEV |
Fecal Coliform Daily Maximum limit is 400 MPN/100 mL and reported value was 780 |
Violation |
N |
eSMR |
Seaside Lagoon |
400243 |
R4-2017-0178 |
N |
1131762 |
06/30/2024 |
CAT1 |
Total Suspended Solids (TSS) Monthly Average limit is 50 mg/L and reported value |
Violation |
N |
Report |
Route I-10 Pavement Rehab. Project |
193489 |
R4-2013-0095 |
N |
1135990 |
08/31/2024 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 0 % effect and rep |
Violation |
N |
eSMR |
Saugus Water Reclamation Plant |
442544 |
R4-2022-0175 |
N |
1129933 |
06/03/2024 |
CAT2 |
Chlorine, Total Residual Daily Maximum limit is 8 ug/L and reported value was 10 |
Violation |
N |
eSMR |
Seaside Lagoon |
400243 |
R4-2017-0178 |
N |
1130714 |
04/03/2024 |
Deficient Monitoring |
Total Recoverable Mercury is required to be analyzed once per discharge event pu |
Violation |
N |
eSMR |
Dominguez Hills Tank Farm |
441555 |
R4-2023-0374 |
N |
1129297 |
04/03/2024 |
CAT2 |
Chlorine, Total Residual 30-Day Average limit is 150 mg/L and reported value was |
Violation |
N |
eSMR |
Camarillo WRP |
428243 |
R4-2019-0136 |
N |
1130587 |
05/31/2024 |
CTOX |
Chronic Toxicity-C.dubia-Reproduction Monthly Median limit is 1 Pass/Fail (Pass |
Violation |
N |
eSMR |
San Jose Creek Water Reclamation Plant |
443109 |
R4-2021-0131 |
N |
1133007 |
06/27/2024 |
Deficient Monitoring |
Residual Chlorine sample exceeded the 15-minute holding. |
Violation |
N |
Report |
Wilshire Rodeo Plaza |
193383 |
R4-2018-0125 |
N |
1131049 |
07/10/2024 |
OEV |
Fecal Coliform Daily Maximum limit is 400 MPN/100 mL and reported value was 2400 |
Violation |
N |
eSMR |
Seaside Lagoon |
400243 |
R4-2017-0178 |
N |
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
|