| Violation ID |
Occurrence Date |
Violation Type |
Violation Description(-) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
| 1150721 |
10/09/2025 |
Deficient Reporting |
Water quality samples were collected in early October and submitted to DWR's contract analytical laboratory. However, an unresolvable contract issue developed between DWR and the laboratory. As a result, the October samples were not analyzed. No samples were collected in November 2025 and December 2025 due to the plant being offline for plant maintenance. Water quality samples were collected on 1/26/2026 and were submitted to DWR's new analytical laboratory. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
| 1150720 |
10/09/2025 |
Deficient Reporting |
Water quality samples were collected in early October and submitted to DWR's contract analytical laboratory. However, an unresolvable contract issue developed between DWR and the laboratory. As a result, the October samples were not analyzed. No samples were collected in November 2025 and December 2025 due to the plant being offline for plant maintenance. Water quality samples were collected on 1/26/2026 and were submitted to DWR's new analytical laboratory. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
| 1150719 |
10/09/2025 |
Deficient Reporting |
Water quality samples were collected in early October and submitted to DWR's contract analytical laboratory. However, an unresolvable contract issue developed between DWR and the laboratory. As a result, the October samples were not analyzed. No samples were collected in November 2025 and December 2025 due to the plant being offline for plant maintenance. Water quality samples were collected on 1/26/2026 and were submitted to DWR's new analytical laboratory. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
| 1150718 |
10/09/2025 |
Deficient Reporting |
Water quality samples were collected in early October and submitted to DWR's contract analytical laboratory. However, an unresolvable contract issue developed between DWR and the laboratory. As a result, the October samples were not analyzed. No samples were collected in November 2025 and December 2025 due to the plant being offline for plant maintenance. Water quality samples were collected on 1/26/2026 and were submitted to DWR's new analytical laboratory. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
| 1150375 |
08/31/2025 |
CAT2 |
Copper, Total Recoverable Monthly Average limit is 29 ug/L and reported value was 200 ug/L at EFF-002. |
Violation |
N |
Report |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1150374 |
08/31/2025 |
CAT1 |
Settleable Solids Monthly Average limit is 0.1 ml/L and reported value was 0.9 ml/L at EFF-002. |
Violation |
N |
Report |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1150373 |
08/31/2025 |
CAT1 |
Total Suspended Solids (TSS) Monthly Average limit is 50 mg/L and reported value was 140 mg/L at EFF-002. |
Violation |
N |
Report |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1148938 |
08/31/2025 |
CAT2 |
Copper, Total Recoverable Monthly Average (Mean) limit is 0.005 lb/day and reported value was 0.00961 lb/day at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1148937 |
08/31/2025 |
CAT2 |
Lead, Total Monthly Average (Mean) limit is 8 ug/L and reported value was 10 ug/L at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1148936 |
08/21/2025 |
CAT1 |
Settleable Solids Daily Maximum limit is 0.3 ml/L and reported value was 0.9 ml/L at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1148935 |
08/21/2025 |
CAT2 |
Copper, Total Recoverable Daily Maximum limit is 77 ug/L and reported value was 200 ug/L at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1148934 |
08/21/2025 |
CAT1 |
Total Suspended Solids (TSS) Daily Maximum limit is 75 mg/L and reported value was 140 mg/L at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1148933 |
08/21/2025 |
OEV |
Turbidity Daily Maximum limit is 25 NTU and reported value was 40 NTU at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1148932 |
08/31/2025 |
OEV |
Turbidity Monthly Average limit is 5 NTU and reported value was 40 NTU at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1148931 |
09/30/2025 |
Deficient Monitoring |
No samples were collected in September 2025 due to the plant being offline for plant maintenance. Water quality samples were collected in early October, but a contract issue came up between DWR and its analytical lab. As a result, the October samples will not be analyzed. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
| 1148930 |
09/30/2025 |
Deficient Monitoring |
No samples were collected in September 2025 due to the plant being offline for plant maintenance. Water quality samples were collected in early October, but a contract issue came up between DWR and its analytical lab. As a result, the October samples will not be analyzed. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
| 1148929 |
09/30/2025 |
Deficient Monitoring |
No samples were collected in September 2025 due to the plant being offline for plant maintenance. Water quality samples were collected in early October, but a contract issue came up between DWR and its analytical lab. As a result, the October samples will not be analyzed. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
| 1148928 |
09/30/2025 |
Deficient Monitoring |
No samples were collected in September 2025 due to the plant being offline for plant maintenance. Water quality samples were collected in early October, but a contract issue came up between DWR and its analytical lab. As a result, the October samples will not be analyzed. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
N |
| 1145196 |
04/30/2025 |
OEV |
Turbidity Monthly Average limit is 5.0 NTU and reported value was 6.45 NTU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1145195 |
05/15/2025 |
OEV |
pH Instantaneous Maximum limit is 8.6 SU and reported value was 8.7 SU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1142416 |
02/28/2025 |
CAT1 |
Chloride 90-Day Mean limit is 100 mg/L and reported value was 111 mg/L at EFF-002. |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1142415 |
03/13/2025 |
OEV |
Turbidity Daily Maximum limit is 25 NTU and reported value was 330 NTU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
| 1142414 |
03/31/2025 |
OEV |
Turbidity Monthly Average limit is 5 NTU and reported value was 84.9 NTU at EFF-001 (A & B). |
Violation |
N |
eSMR |
William E Warne Power Plant |
446992 |
R4-2022-0237 |
Y |
|