General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
548670 Golden Queen Mining Co LLC Privately-Owned Business 2818 Silver Queen Road Mojave, CA 93502 661-886-6935 None
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
257676 Soledad Mountain Project Kern 6B Metal Mining Owner 10/03/2014 None
Total Related Places: 1
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
Total Related Parties: 0
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
443566 WDR 6V 6B159708001 Active LNDISPOTH R6V-2021-0020 05/13/2021 None Discharger 06/09/2021 None N
375240 WDR 6V 6B159708001 Historical LNDISPOTH R6V-2010-0031 07/14/2010 05/12/2021 Discharger 10/03/2014 None N
Total Regulatory Measures: 2
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
1105292 05/25/2022 Unauthorized Discharge Unauthorized release from DE sump overflow. Barren solution. 25 gallons to ground. Violation of Board Order R6V-2021-0020, Section II., A.,3. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1117768 03/31/2023 Deficient Monitoring (1) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2023 Quarter 1 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A: (2) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2023 Quarter 1 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1125169 08/20/2023 Groundwater Exceeded the concentration limits of pH during the 2023 3rd Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125205 11/14/2023 Groundwater Exceeded the concentration limits of Arsenic, Total Cyanide, and Total Dissolved Solids during the 2023 4th Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1117751 11/19/2021 Groundwater Exceeded the concentration limits of Arsenic during the 2022 1st Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117756 06/14/2022 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117758 07/30/2022 Deficient Reporting The EDF laboratory data of the April 1, 2022 ¿ June 30, 2022 sampling and reporting period was due on July 30, 2022 but it has not been turned in as of May 8, 2023. 282 Days Late. Violates Board Order R6V-2021-0020 MRP IV.A. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117767 03/16/2023 Groundwater Exceeded the concentration limits of Arsenic and Iron during the 2023 1st Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1125217 01/30/2024 Deficient Monitoring (1) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2023 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. ¿ Attachment A (2) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2023 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. ¿ Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1117736 12/31/2021 Deficient Monitoring (1) Surface Impoundment grab sample not sampled for field parameters Dissolved Oxygen and Turbidity during 2021 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.B.3. Attachment A (2) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2021 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A (3) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2021 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117749 10/10/2021 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117754 01/09/2022 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117766 02/11/2023 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117734 09/30/2021 Deficient Monitoring (1) Surface Impoundment grab sample not sampled for field parameters Dissolved Oxygen and Turbidity during 2021 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.B.3. Attachment A (2) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2021 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A (3) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2021 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117759 08/03/2022 Groundwater Exceeded the concentration limits of Arsenic and Iron during the 2022 3rd Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117760 09/30/2022 Deficient Monitoring (1) Surface Impoundment grab sample not sampled during 2022 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.B.2-3 Attachment A; (2) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2022 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A; (3) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2022 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1125167 03/31/2023 Deficient Monitoring (1) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2023 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. ¿ Attachment A (2) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2023 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. ¿ Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1093069 07/12/2021 Late Report The Monitoring Well Installation Work Plan, due on July 12, 2021, 60 Days after the adoption of the R6V-2021-0020 Board Order, has not been submitted to date. 30 Days late as of August 11, 2021. Violates Board Order R6V-2021-0020 WDR V.G. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117762 11/10/2022 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117764 12/31/2022 Deficient Monitoring (1) Surface Impoundment grab sample not sampled for field parameters Dissolved Oxygen and Turbidity during 2022 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.B.3. ¿ Attachment A; (2) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2022 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. ¿ Attachment A; (3) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2022 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. ¿ Attachment A; (4) Annual calibration documentation of instrument calibration and performance checks was not turned in. Violates Board Order R6V-2021-0020 MRP II.C.4 (LCRS), MRP II.D.4. (Unsaturated Zone), MRP II.E.7 (Groundwater) Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117765 01/30/2023 Deficient Reporting The EDF laboratory data of the October 1, 2022 ¿ December 31, 2022, sampling and reporting period was due on January 30, 2023, but it has not been turned in as of May 8, 2023. 98 Days Late. Violates Board Order R6V-2021-0020 MRP IV.A. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1125164 07/08/2023 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125165 04/01/2023 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125216 10/03/2023 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125218 01/30/2024 Deficient Reporting (1) The EDF laboratory data of groundwater for the October 1, 2023 ¿ December 31, 2023, sampling and reporting period was due on January 30, 2024, but it has not been turned in as of March 8, 2024. 38 Days Late. Violates Board Order R6V-2021-0020 MRP IV.A. (2) Annual calibration documentation of instrument calibration and performance checks were not turned in. Violates Board Order R6V-2021-0020 MRP 11.C.4 (LCRS), MRP 11.D.4. (Unsaturated Zone), MRP 11.E.7 (Groundwater) Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125163 06/15/2023 Groundwater (1) Exceeded the concentration limits of Arsenic, Total Dissolved Solids, and WAD Cyanide during the 2023 2nd Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. (2) Exceeded PQL of Chloroform during the 2023 2nd Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C.1.b. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125168 04/01/2023 Deficient Monitoring (1) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2023 Quarter 2 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A (2) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2023 Quarter 2 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1117278 03/30/2022 Deficient Monitoring (1) Surface Impoundment grab sample not sampled for field parameters Dissolved Oxygen and Turbidity during 2022 Quarter 1 monitoring period. Violates Board Order R6V-2021-0020 MRP II.B.3. ¿ Attachment A (2) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2022 Quarter 1 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. ¿ Attachment A (3) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2022 Quarter 1 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. ¿ Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117769 04/30/2023 Deficient Reporting The EDF laboratory data of the January 1, 2023 - March 31, 2023, sampling and reporting period was due on April 30, 2023, but it has not been turned in as of May 8, 2023. 8 Days Late. Violates Board Order R6V-2021-0020 MRP IV.A. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1117735 02/16/2022 Groundwater Exceeded the concentration limits of Arsenic, Iron, and Total Dissolved Solids during the 2022 1st Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117752 07/15/2021 Groundwater Exceeded the concentration limits of Arsenic during the 2021 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117757 06/30/2022 Deficient Monitoring (1) Surface Impoundment grab sample not sampled for field parameters Dissolved Oxygen and Turbidity during 2022 Quarter 2 monitoring period. Violates Board Order R6V-2021-0020 MRP II.B.3. Attachment A; (2) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2022 Quarter 2 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A; (3) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2022 Quarter 2 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A; (4)Groundwater was not sampled during the 2nd Quarter 2022 monitoring period. Violates Board Order R6V-2021-0020 MRP II.E. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117761 10/30/2022 Deficient Reporting The EDF laboratory data of the July 1, 2022 - September 30, 2022, sampling and reporting period was due on October 30, 2022, but it has not been turned in as of May 8, 2023. 190 Days Late. Violates Board Order R6V-2021-0020 MRP IV.A. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117763 11/15/2022 Groundwater Exceeded the concentration limits of Arsenic, Iron, Lead, Mercury, and Total Dissolved Solids during the 2022 4th Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1125170 05/02/2023 Deficient Monitoring MW-6 was not sampled during 2023 Q1, 2023 Q2, 2023 Q3, 2023 Q4. Violates Board Order R6V-2021-0020 MRP II.E.1. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 35
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
456320 Oral Communication None Email 03/13/2024 Soledad Mountain Project (Golden Queen) 2023 Violation Notification LNDISPOTH 03/13/2024 Historical
453710 Oral Communication None Oral Com 05/30/2023 for Golden Queen Mining Co LLC LNDISPOTH 05/30/2023 Historical
448088 Oral Communication None Oral Com 05/25/2022 for Golden Queen Mining Co LLC LNDISPOTH 05/25/2022 Historical
Total Enforcement Actions: 3
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 05/17/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.