Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
530167 Barbara Guia 320 West 4th Street 200 Los Angeles, CA 90013 213-620-6361 barbara.guia@waterboards.ca.gov
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
Total Related Places: 0
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
137760 Los Angeles Regional Water Quality Control Board Organization Employee 11/01/2011 None Waterboard
Total Related Parties: 1
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
Total Regulatory Measures: 0
  
  
  
  
Expand/Contract Violations
Violations within the past year
Violation ID Occurrence Date Violation Type Violation Description(+) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
1127113 05/31/2023 Deficient Reporting Acute toxicity not analyzed annually Violation None Report Primo Lofts 444577 R4-2018-0125 N
1127112 12/31/2023 Deficient Reporting The monthly total flow and reported the calculated daily average flow and monthl Violation None Report Primo Lofts 444577 R4-2018-0125 N
1127111 09/30/2023 Deficient Reporting The monthly total flow and reported the calculated daily average flow and monthl Violation None Report Primo Lofts 444577 R4-2018-0125 N
1127110 06/30/2023 Deficient Reporting The monthly total flow and reported the calculated daily average flow and monthl Violation None Report Primo Lofts 444577 R4-2018-0125 N
1127102 12/31/2023 Deficient Monitoring Acute toxicity not sampled for 2023, required annually. Violation N Report 640 S. St. Andrews Place 439224 R4-2018-0125 N
1127001 12/11/2023 CAT2 Arsenic, Total Daily Maximum limit is 10 ug/L and reported value was 20 ug/L. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1127000 12/11/2023 CAT2 Arsenic, Total Daily Maximum limit is 10 ug/L and reported value was 23 ug/L. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126999 12/04/2023 CAT2 Arsenic, Total Daily Maximum limit is 10 ug/L and reported value was 22 ug/L. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126998 10/31/2023 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 50 mg/L and reported value Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126997 10/12/2023 CAT1 Total Suspended Solids (TSS) Daily Maximum limit is 75 mg/L and reported value w Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126995 10/31/2023 CAT2 Selenium, Total Monthly Average limit is 4.0 ug/L and reported value was 4.7 ug/ Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126913 09/05/2023 CAT2 Tetrachloroethene Daily Maximum limit is 5 ug/L and reported value was 5.43 ug/L Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126912 09/30/2023 CAT2 Selenium, Total Monthly Average limit is 4 ug/L and reported value was 6.2 ug/L. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126902 08/31/2023 CAT2 Selenium, Total Monthly Average limit is 4 ug/L and reported value was 7 ug/L. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126900 08/31/2023 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 50 mg/L and reported value Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126899 08/01/2023 CAT1 Total Suspended Solids (TSS) Daily Maximum limit is 75 mg/L and reported value w Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126898 08/01/2023 OEV pH Daily Minimum limit is 6.5 SU and reported value was 6.01 SU. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126897 08/31/2023 CAT2 Selenium, Total Monthly Average limit is 4 ug/L and reported value was 4.2 ug/L. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126896 07/31/2023 CAT2 Selenium, Total Monthly Average limit is 4 ug/L and reported value was 6.8 ug/L. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126895 07/31/2023 CAT2 Selenium, Total Monthly Average limit is 4 ug/L and reported value was 4.1 ug/L. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126894 07/05/2023 CAT1 Total Suspended Solids (TSS) Daily Maximum limit is 75 mg/L and reported value w Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126893 11/17/2023 Late Report 3Q23 report due 11/14/23, submitted 11/17/23, 3 days late Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126892 05/31/2023 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 50 mg/L and reported value Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126891 05/31/2023 OEV Turbidity Monthly Average (Mean) limit is 50 NTU and reported value was 330 NTU. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126883 02/15/2024 Late Report 4Q23 report due 2/14/24, submitted 2/16/24, 2 days late Violation None Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126882 06/30/2023 Deficient Reporting perjury statement and LRP signature not included Violation None Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126841 06/30/2023 CAT2 Selenium, Total Monthly Average limit is 4 ug/L and reported value was 4.5 ug/L. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126840 06/30/2023 OEV Turbidity Monthly Average limit is 50 NTU and reported value was 380.0 NTU. Violation None Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126839 06/12/2023 OEV Turbidity Daily Maximum limit is 150 NTU and reported value was 380 NTU. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126838 06/30/2023 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 50 mg/L and reported value Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126837 06/12/2023 CAT1 Total Suspended Solids (TSS) Daily Maximum limit is 75 mg/L and reported value w Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126836 06/30/2023 CAT2 Selenium, Total Monthly Average limit is 4.0 ug/L and reported value was 6.5 ug/ Violation None Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126835 05/31/2023 CAT2 Selenium, Total Monthly Average limit is 4 ug/L and reported value was 6.2 ug/L. Violation None Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126834 06/30/2023 Deficient Reporting Copper, lead and E. Coli not analyzed in the 2Q2023 for EFF-003, EFF-004, and EF Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126718 02/15/2024 Late Report Fourth Quarter 2023 report was submitted one day late. Violation N Report Puente Valley Operable Unit Intermediate Zone Interim Remedy 431175 R4-2018-0125 N
1126704 05/31/2023 Deficient Monitoring 1,4-Dioxane not analyzed for the month of May, required monthly. Violation N Report Puente Valley Operable Unit Intermediate Zone Interim Remedy 431175 R4-2018-0125 N
1126589 02/28/2024 Late Report Fourth quarter 2023 report was submitted 14 days late. Violation N Report 812 Main LLC 422948 R4-2013-0095 N
1126588 11/15/2023 Late Report Third quarter 2023 report was submitted one day late. Violation N Report 812 Main LLC 422948 R4-2013-0095 N
1126534 06/30/2023 Deficient Reporting perjury statement not included in quarterly report. Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126533 08/15/2023 Late Report 2Q23 report due 8/14/23, submitted 8/16/2023, 2 days late Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126387 11/28/2023 CAT2 Chlorine, Total Residual Daily Maximum limit is 0.1 mg/L and reported value was Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126382 06/26/2023 Late Report 1Q23 report due 5/15/23, rec'd 6/26/23, 42 days late Violation N Report Westside Subway Purple Line Extension Section 2 Crosspassage Dewatering sites 448115 R4-2018-0125 N
1126010 04/16/2024 Late Report 4th Quarter 2023 report was submitted 62 days late. Violation N Report Primo Lofts 444577 R4-2018-0125 N
1126009 04/16/2024 Late Report 2nd Quarter 2023 report was submitted 246 days late. Violation N Report Primo Lofts 444577 R4-2018-0125 N
1126008 12/21/2023 Deficient Reporting E. Coli not analyzed once per discharge for Eff-001, EFF-002, and EFF-006 on 12/ Violation None Report Inglewood Oil Field 416564 R4-2018-0020 N
1126007 12/21/2023 Deficient Reporting Flow was reported as a daily discharge for Eff-001, EFF-002, and EFF-006 on 12/2 Violation None Report Inglewood Oil Field 416564 R4-2018-0020 N
1126006 12/31/2023 Deficient Reporting pH and temperature not analyzed within a 15 min. holding time for Eff-001, EFF-0 Violation None Report Inglewood Oil Field 416564 R4-2018-0020 N
1126001 04/16/2024 Late Report 1st Quarter 2023 report was submitted 337 days late. Violation N Report Primo Lofts 444577 R4-2018-0125 N
1125221 12/31/2023 Deficient Reporting Chloropyrifos, diazinon, toxicity, chlordane, 4,4-DDE, 4,4-DDD, 4,4-DDT, dieldri Violation N Report Arroyo Simi Stabilizer Replacement Downstream of Leta Yancy 447820 R4-2018-0125 N
1125220 06/30/2023 Deficient Reporting Chronic toxicity not sampled quarterly Violation N Report Arroyo Simi Stabilizer Replacement Downstream of Leta Yancy 447820 R4-2018-0125 N
1125215 06/30/2023 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 50.0 mg/L and reported val Violation N Report Arroyo Simi Stabilizer Replacement Downstream of Leta Yancy 447820 R4-2018-0125 Y
1125214 06/12/2023 Deficient Reporting residual chlorine not sampled within 15 minutes holding time Violation N Report Arroyo Simi Stabilizer Replacement Downstream of Leta Yancy 447820 R4-2018-0125 N
1125182 02/14/2024 Late Report Late reporting: due 2/14/2024, 28 days late Violation N Report Arroyo Simi Stabilizer Replacement Downstream of Leta Yancy 447820 R4-2018-0125 N
1125181 08/14/2023 Late Report Late reporting: due 8/14/23, 1 day late Violation N Report Arroyo Simi Stabilizer Replacement Downstream of Leta Yancy 447820 R4-2018-0125 N
1124978 05/15/2023 Late Report Late reporting: due 5/15/23, 58 days late Violation N Report Arlington Well 428154 R4-2024-0145 N
1124973 11/14/2023 Late Report Late reporting: due 11/14/23, 7 days late Violation N Report Arroyo Simi Stabilizer Replacement Downstream of Leta Yancy 447820 R4-2018-0125 N
1124938 02/21/2024 Late Report Late reporting: due 2/15/2024, 6 days late Violation N Report 3303 Sunset 444183 R4-2018-0125 N
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 57
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
Total Enforcement Actions: 0
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
194335 Los Angeles Regional Water Quality Control Board Enrollee VOLMON 01/01/2000 Historical
Total Regulatory Measures linked to Related Parties: 1
  
  
The current report was generated with data as of: 05/10/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page