1126004 |
04/10/2024 |
Order Conditions |
The concrete lined drainage channel that discharges runoff from the Receiving/ Processing Pad to the North Pad has been intentionally blocked to facilitate construction atop the North Pad. The blockage of this drainage channel could result in a direct discharge of compost leachate to surface water. |
Violation |
None |
Inspection |
Western Placer Waste Management Authority Materials Recovery Facility |
408196 |
2015-0121-DWQ |
Y |
1126003 |
04/10/2024 |
Order Conditions |
Compost and compost leachate appears to have been pushed or flowed off the Facility?s containment pads at two locations: 1) along the northern side of the Receiving /Processing Pad and 2) along the norther side of the South Pad. |
Violation |
None |
Inspection |
Western Placer Waste Management Authority Materials Recovery Facility |
408196 |
2015-0121-DWQ |
Y |
1125998 |
04/10/2024 |
Order Conditions |
The legal requirements outlined below are specific to the violation noted above. 1. Section 21750(f) of Title 27 states in part: ?A stability analysis, including a determination of the expected peak ground acceleration at the Unit associated with the maximum credible earthquake (for Class II waste management units) or the maximum probable earthquake (for Class III landfills). This stability analysis shall be included as part of the ROWD (or JTD) for the proposed Unit, and an updated stability analysis (if the original analysis no longer reflects the conditions at the Unit) shall be included as part of the final closure and post-closure maintenance plan? The addition of soil material onto these previously closed Modules has invalidated any previously approved slope stability analysis. The original analysis no longer reflects the conditions of the Unit. The absence of an approved stability analysis is a violation of Title 27. 2. Finding 40 of the WDRs states in part: ?The Discharger has been implementing measures proposed in the 23 September 1997 Corrective Action Program and subsequent addendum. The CAP specifies the following actions: installation of 8 infill gas wells; closure of Modules 1, 2, 10, 11 and 12? While it is practice to allow a Discharger to manipulate the system to optimize the extraction of landfill gas, the removal of 17 of the systems 22 wells would be an unapproved system modification. This significant reduction of the landfill gas system Further, Section 20430(f) of Title 27 address the termination of corrective action measures and states: ??corrective action measures taken pursuant to ¶(c)(e.g., pumping and treatment of ground water) may be terminated when the discharger demonstrates to the satisfaction of the RWQCB that the concentrations of all COCs are reduced to levels below their respective concentration limits throughout the entire zone affected by the release.? No demonstration of compliance was provided. These WMU Modules are still in corrective action. For these reasons, the removal of landfill gas wells from a unit in corrective action, without Regional Board approval is a violation of Title 27. 3. Finding 70 of the WDRs states in part: ?The RWD/JTD submitted by the Discharger contains a preliminary closure and post-closure maintenance plan (PCPCMP) for the landfill. The PCPCMP includes information required by Title 27 CCR Section 21769(b), and includes a lump sum estimate of the cost of carrying out all actions necessary to close each Unit, to prepare detailed design specifications, to develop the final closure and post-closure maintenance plan, and to carry out the first thirty years of post-closure maintenance. The total amount of the closure cost estimate is $16,846,912, and the amount of the post-closure maintenance cost estimate is $7,374,807. The Regional Board hereby approves these cost estimates.? Like the now invalid seismic analysis, the new morphology of Modules 1, 2, 10 and 11, creates a conflict with the WDRs. Therefore, the financial assurance estimates are no longer applicable and must be recalculated. |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1124321 |
11/02/2023 |
Order Conditions |
Construction of Module 6 of the Class II Waste Management Unit (WMU) has begun without Central Valley Water Board staff approval. WDRs/General Construction Specifications D.1 1. The Discharger shall submit for review and approval prior to construction, design plans and specifications for new Units and modules of existing Units, that include the following: a. A Construction Quality Assurance Plan meeting the requirements of §20324 of Title 27; and b. A geotechnical evaluation of the area soils, evaluating their use as the base layer; and c. An unsaturated zone monitoring system, which is demonstrated to remain effective throughout the active life, closure, and post-closure maintenance periods of the Unit, which shall be installed beneath the composite liner system in accordance with §20415(d) of Title 27. |
Violation |
None |
Report |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120457 |
06/07/2023 |
Order Conditions |
Violation 13 ? A seep and exposed section of damaged final cover was observed atop Module 16 (Figures 43, 44, and 45). The Discharger was working to address the seep and repair the damage section of cover located near the seep. |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120456 |
06/07/2023 |
Order Conditions |
Violation 12 ? A larger section of damaged liner remains exposed atop Module 11 (Figure 25 and Figures 27 through 31). |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120455 |
06/07/2023 |
Order Conditions |
Violation 11 ? Deep-rooted Milk-Thistle was observed atop the cover (Figures 57). |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120454 |
06/07/2023 |
Order Conditions |
Violation 10 ? Multiple Facility monitoring locations are no longer properly labeled. The original labels have faded to the point that they are no longer readable. (Figures 41, 48, 53, 54, and 60). All Facility monitoring and LFG extraction points must be labeled so that they can be easily identified in the field. |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120453 |
06/07/2023 |
Order Conditions |
Violation 9 ? Recently re-graded sections of the outer southern slope of Module 16 appear to be steeper than 3.5 to one, as allowed by the WDRs (Figures 34 and 35). |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120452 |
06/07/2023 |
Order Conditions |
Violation 8 ? Minor soil excavations, which could result in pounding, were observed atop the soil stockpiles located atop Modules 1, 2, 10, and 11 (Figure 58). |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120451 |
06/07/2023 |
Order Conditions |
Violation 7 ? Areas of notable sedimentation and ponding were observed along the storm water V ditch the runs along Module 16 (Figure 47). |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120450 |
06/07/2023 |
Order Conditions |
Violation 6 ? Erosional damage has occurred atop the Module 2 cover, beyond the limit of the soil stockpile placed atop the original Module 2 cover (Figures 14 and 15). Similar erosional damage was seen in other Modules as well, between the transition between soil stockpile and original cover. |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120449 |
06/07/2023 |
Order Conditions |
The erosion noted in Violation 4 above has caused significant sedimentation to occur in the storm water V ditch that run along the western side of Module 1, 2, and 10, as well as within the northern storm water sedimentation basin. The degree of sedimentation observed will prevent these storm water control features from operating as designed during future rain events. |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120448 |
06/07/2023 |
Order Conditions |
Significant and widespread erosion has occurred across the soil stockpiles placed atop Modules 1, 2, 10, and 11 resulting in significant cover damage. |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120447 |
06/07/2023 |
Order Conditions |
Violation 3 ? Scattered waste was observed in Module 16 outside the limit of the active face |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120446 |
06/07/2023 |
Order Conditions |
EViolation 2 ? The Discharger stated that they, at the request of the Placer County sewer district and without notifying Central Valley Water Board staff, intentionally shut off and/or limited leachate extraction from the Facility?s LCRS sumps, during daytime operation, which resulted in the leachate level violations noted above. |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120445 |
06/07/2023 |
Order Conditions |
Elevated leachate levels were observed in multiple LCRS sumps |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1119949 |
06/07/2023 |
Order Conditions |
Violation 3. Central Valley Water Board files do not contain a Final Post-Construction Quality Assurance (CQA) Report documenting the installation of the North Compost Leachate Pond in accordance with the Compost General Order. |
Violation |
N |
Inspection |
Western Placer Waste Management Authority Materials Recovery Facility |
408196 |
2015-0121-DWQ |
Y |
1119948 |
06/07/2023 |
Order Conditions |
Violation 2. Central Valley Water Board files do not contain any documentation that the proposed expansion and lining of the North Compost Pond was ever approved by Water Board staff. could not document |
Violation |
None |
Inspection |
Western Placer Waste Management Authority Materials Recovery Facility |
408196 |
2015-0121-DWQ |
Y |
1119947 |
06/07/2023 |
Order Conditions |
Violation 1. The concrete lined drainage channel that discharges runoff from the Receiving/Processing Area to the North Pad has been intentionally blocked to facilitate construction atop the North Pad, as documented in the attached 7 June 2023 Inspection Report. |
Violation |
None |
Inspection |
Western Placer Waste Management Authority Materials Recovery Facility |
408196 |
2015-0121-DWQ |
Y |
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
|