Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
S653401 QAP Metal Finishing Inc Privately-Owned Business 342 W 130th Street Los Angeles, CA 90061 310-327-5201 tawnnie@qapmetalfinishing.com
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
S880085 QAP Metal Finishing Inc Los Angeles 4 Facility Discharger 03/02/2020 None
S866243 QAP Metal Finishing Inc Los Angeles 4 Facility Discharger 08/13/2018 None
Total Related Places: 2
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
N/A Tawnnie Lozano Contact Owner Contact N/A N/A N/A
N/A Tawnnie Loznao Contact Owner Contact N/A N/A N/A
Total Related Parties: 2
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
S518419 Industrial 4 4 19NEC006263 Active INDSTW 2014-0057-DWQ 03/06/2020 None Discharger 03/02/2020 None None
Total Regulatory Measures: 1
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
S890607 07/13/2023 SW - Failure to meet NEC criteria When the Facility was inspected on July 13, 2023, and September 28, 2023 exposure conditions were observed. During the inspection items and activities such as materials and equipment such as wooden pallets, boxed packing labels, a propane tank, a ladder, a wrapped pallet with clamps for the green and white racks, frame tubing for the electrical system, construction wood stored, plastic bottles, plastic trash and construction taking place in the southeast side of the Facility. Therefore, the Facility does not qualify for the NEC and an NOI is needed. Violation N Inspection QAP Metal Finishing Inc S518419 2014-0057-DWQ Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 1
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
S455150 Notice of Non-Compliance for Non-Filers None 4 19NEC006263 INDSTW 10/17/2024 Historical
S439829 Notice of Violation None 4 19NEC006263 INDSTW 10/26/2020 Historical
S436110 Notice of Violation None 4 19NEC004463 INDSTW 02/05/2020 Historical
S435958 Notice of Non-Compliance for Non-Filers None 4 19NEC004463 INDSTW 12/31/2019 Historical
S434810 Verbal Communication None 4 19NEC004463 INDSTW 10/06/2019 Active
Total Enforcement Actions: 5
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 11/07/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page