Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
644248 Kevin Gonzalez 73720 Fred Waring Drive 100 Palm Desert, CA 92260 None Kevin.Gonzalez@Waterboards.ca.gov
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
Total Related Places: 0
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
137770 Colorado River Basin Regional Water Quality Control Board Organization Employee 03/14/2024 None Waterboard
Total Related Parties: 1
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
Total Regulatory Measures: 0
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
1145626 06/17/2024 OEV Total Coliform Not to exceed a specific limit more than once within any 30-day period. limit is 240 MPN/100 mL and reported value was 1600 MPN/100 mL. Violation N Report USMC - Mainside WWTF 405195 R7-2016-0032 Y
1145629 12/17/2024 Order Conditions Monitoring reports missing and Septic Tank lids were unable to be opened during an inspection. Violation N Inspection Best Western Gardens 205774 97-500 N
1145627 03/25/2025 Other Codes Staff observed the chlorine analyzer to be broken at the recycled water tank. At the time of the inspection Staff noticed that the effluent sampling point, which is a pipe connected to the recycled water tank, was leaking and dripping onto the surface. The pipe appeared to be completely covered in black tape to prevent leaks, but this did not stop the flow. At the time of the inspection the screw press at the headworks, which is described in finding 8 of the Order R7-2016-0032 as a compactor, was found to be broken and non-operational. Violation N Inspection USMC - Mainside WWTF 405195 R7-2016-0032 Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 3
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
Total Enforcement Actions: 0
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 10/15/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page