1144010 |
06/13/2025 |
Order Conditions |
Failure to install an adequate monitoring network downgradient of Phase 1, Stage 1 of the HLP, and the Overflow Ponds and is a violation of Board Order No. R6V-2021-0020, Waste Discharge Requirements, Section V.G. |
Violation |
N |
Report |
Soledad Mountain Project |
443566 |
R6V-2021-0020 |
Y |
1143718 |
09/05/2024 |
Groundwater |
Exceeded WQPS of Dichlorodifluoromethane, Nitrogen, Nitrate (as N), Sulfate, and Tetrachloroethene (PCE) during the 2024 2nd half monitoring period. Violates Board Order R6V-2007-0035 WDR II.A.7 and MRP III.B.1. |
Violation |
N |
Report |
Mojave/Rosamond Landfill |
360948 |
R6V-2007-0035 |
Y |
1143716 |
08/17/2023 |
Groundwater |
Exceeded WQPS of Dichlorodifluoromethane, Nitrogen, Nitrate (as N), Sulfate, and Tetrachloroethene (PCE) during the 2023 2nd half monitoring period. Violates Board Order R6V-2007-0035 WDR II.A.7 and MRP III.B.1. |
Violation |
N |
Report |
Mojave/Rosamond Landfill |
360948 |
R6V-2007-0035 |
Y |
1143715 |
03/14/2023 |
Groundwater |
Exceeded WQPS of Dichlorodifluoromethane, Nitrogen, Nitrate (as N), Sulfate, Tetrachloroethene (PCE) during the 2023 1st half monitoring period. Violates Board Order R6V-2007-0035 WDR II.A.7 and MRP III.B.1. |
Violation |
N |
Report |
Mojave/Rosamond Landfill |
360948 |
R6V-2007-0035 |
Y |
1143708 |
08/23/2022 |
Groundwater |
Exceeded WQPS of Dichlorodifluoromethane, Nitrogen, Nitrate (as N), Sulfate, and Tetrachloroethene (PCE)) during the 2022 2nd half monitoring period. Violates Board Order R6V-2007-0035 WDR II.A.7 and MRP III.B.1. |
Violation |
N |
Report |
Mojave/Rosamond Landfill |
360948 |
R6V-2007-0035 |
Y |
1143707 |
02/08/2022 |
Groundwater |
Exceeded WQPS of Chloride, Nitrate (Nitrogen as N), Sulfate, Tetrachloroethene (PCE), and Trichloroethene (TCE) during the 2022 1st half monitoring period. Violates Board Order R6V-2007-0035 WDR II.A.7 and MRP III.B.1. |
Violation |
N |
Report |
Mojave/Rosamond Landfill |
360948 |
R6V-2007-0035 |
Y |
1141786 |
02/25/2025 |
Order Conditions |
Lysimeter RD1-01 vacuum pressure was under 70-80 centibars, both under the new proposed sampling method and prior to the implementation of the new method. Violates Board Order R6V-2016-0051, Waste Discharge Requirements, Section II.A.19. |
Violation |
None |
Inspection |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1140766 |
02/25/2025 |
Unauthorized Discharge |
Windblown litter outside of the fence along the east side of the property. Violates Board Order No. R6V-2016-0051, Waste Discharge Requirements, Section II. A. 5. |
Violation |
None |
Inspection |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1139771 |
01/21/2025 |
Deficient Monitoring |
Lysimeter B01-01 failed to hold vacuum during sampling, both under the new proposed sampling method and prior to the implementation of the new method. Violates Board Order R6V-2016-0004, Waste Discharge Requirements, Section II.A.15. |
Violation |
None |
Inspection |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1139767 |
01/21/2025 |
Unauthorized Discharge |
Discharge of windblown litter around perimeter fencing. Violates Board Order R6V-2016-0004, Waste Discharge Requirements, Section II.A.4. |
Violation |
None |
Inspection |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1131200 |
08/28/2023 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0051 MRP II.A.2.c. |
Violation |
N |
Report |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1131199 |
08/30/2023 |
Groundwater |
Exceeded WQPS Calcium, Dichlorodifluoromethane, Hardness as CaCO3, Magnesium, Nitrogen, Nitrate (as N), Tetrachloroethene (PCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0051 MRP I.C.1.a. |
Violation |
N |
Report |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1131198 |
03/13/2023 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0051 MRP II.A.2.c. |
Violation |
N |
Report |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1131196 |
03/20/2023 |
Groundwater |
Exceeded WQPS Alkalinity as CaCO3, Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0051 MRP I.C.1.a. |
Violation |
N |
Report |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1131194 |
09/15/2022 |
Groundwater |
Exceeded WQPS Dichlorodifluoromethane, Nitrogen, Nitrate (as N), Tetrachloroethene (PCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0051 MRP I.C.1.a. |
Violation |
N |
Report |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1131193 |
02/15/2022 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0051 MRP II.A.2.c. |
Violation |
N |
Report |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1131192 |
03/03/2022 |
Groundwater |
Exceeded WQPS Arsenic, Beryllium, Copper, Dichlorodifluoromethane, Mercury, Nickel, Nitrogen, Nitrate (as N), Tetrachloroethene (PCE), Tin, and Trichlorofluoromethane. Violates Board Order R6V-2016-0051 MRP I.C.1.a. |
Violation |
N |
Report |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1131191 |
08/25/2021 |
Deficient Monitoring |
Lysimeter field sheet not included for the 2021 H2 monitoring period. Violates Board Order R6V-2016-0051 MRP II.A.2.c. |
Violation |
N |
Report |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1131190 |
08/25/2021 |
Groundwater |
Exceeded WQPS Magnesium, Nitrogen, Nitrate (as N), Tetrachloroethene (PCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0051 MRP I.C.1.a. |
Violation |
N |
Report |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1131189 |
02/11/2021 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0051 MRP II.A.2.c. |
Violation |
N |
Report |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1131188 |
02/11/2021 |
Groundwater |
Exceeded WQPS Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0051 MRP I.C.1.a. |
Violation |
N |
Report |
Ridgecrest/Inyokern Landfill |
409535 |
R6V-2016-0051 |
Y |
1130098 |
11/03/2023 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0032 MRP II.A.2.c. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1130097 |
11/07/2023 |
Groundwater |
Exceeded WQPS of 1,1-Dichloroethane, 1,2-Dichloropropane, 1,4-Dichlorobenzene, Bicarbonate as HCO3, Calcium, Chloride, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Magnesium, Methylene chloride, Sodium, Tetrachloroethene (PCE), Trichloroethene (TCE), Trichlorofluoromethane. Violates Board Order R6V-2016-0032 MRP I.C. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1130096 |
05/24/2023 |
Deficient Monitoring |
Lysimeter field sheet not completed for the 2023 H1 monitoring period. Violates Board Order R6V-2016-0051 MRP II.A.2.c. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1130095 |
05/24/2023 |
Groundwater |
Exceeded WQPS of 1,1-Dichloroethane, 1,4-Dichlorobenzene, Bicarbonate as HCO3, Calcium, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Magnesium, Methylene chloride, Sodium, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0032 MRP I.C. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1130089 |
11/07/2022 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0032 MRP II.A.2.c. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1130088 |
11/09/2022 |
Groundwater |
Exceeded WQPS of 1,1-Dichloroethane, 1,4-Dichlorobenzene, Bicarbonate as HCO3, Calcium, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Magnesium, Methylene chloride, Sodium, and Tetrachloroethene (PCE). Violates Board Order R6V-2016-0032 MRP I.C. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1130087 |
05/03/2022 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0032 MRP II.A.2.c. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1130086 |
05/03/2022 |
Groundwater |
Exceeded WQPS of 1,1-Dichloroethane, 1,1-Dichloroethene, 1,4-Dichlorobenzene, 3-Methylphenol/4-Methylphenol Coelution, Arsenic, Barium, Bicarbonate as HCO3, Calcium, Chloroform, Chromium, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Magnesium, Mercury, Methylene chloride, Selenium, Sodium, Sulfate, Tetrachloroethene (PCE), Tin, Trichloroethene (TCE), Trichlorofluoromethane, and Vanadium. Violates Board Order R6V-2016-0032 MRP I.C. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1130069 |
11/04/2021 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0032 MRP II.A.2.c. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1129936 |
11/08/2021 |
Groundwater |
Exceeded 1,1-Dichloroethane, 1,1-Dichloroethene, 1,4-Dichlorobenzene, Bicarbonate as HCO3, Calcium, Chloroform, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Magnesium, Methylene chloride, Sodium, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0032 MRP I.C. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1129935 |
05/06/2021 |
Deficient Monitoring |
Lysimeter Field Data not included. Violates Board Order R6V-2016-0032 MRP II.A.2.c. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1129934 |
05/06/2021 |
Groundwater |
Exceeded WQPS of 1,1-Dichloroethane, 1,1-Dichloroethene, 1,2-Dichlorobenzene, 1,2-Dichloropropane, 1,4-Dichlorobenzene, Chloroform, Chromium, Hexavalent, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methylene chloride, Sulfate, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0032 MRP I.C. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1129929 |
12/14/2020 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0032 MRP II.A.2.c. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1129928 |
12/16/2020 |
Groundwater |
Violation Description: Exceeded WQPS of 1,1-Dichloroethane, 1,2-Dichloropropane, 1,4-Dichlorobenzene, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0032 MRP I.C. |
Violation |
N |
Report |
Tehachapi Class III Landfill |
406828 |
R6V-2016-0032 |
Y |
1128884 |
08/14/2023 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. |
Violation |
N |
Report |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1128883 |
06/15/2023 |
Groundwater |
Exceeded WQPS of Calcium, Hardness as CaCO3, Sodium during the 2022 2nd half Semiannual monitoring period. Violates Board Order R6V-2016-0004 WDR III.D.2 |
Violation |
N |
Report |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1128882 |
03/30/2023 |
Groundwater |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. |
Violation |
N |
Report |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1128841 |
09/07/2022 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. |
Violation |
N |
Report |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1128683 |
09/07/2022 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. |
Violation |
N |
Report |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1128682 |
02/28/2022 |
Groundwater |
Exceeded WQPS of Arsenic and Chromium during the 2022 H1 Semiannual monitoring period. Violates Board Order R6V-2016-0004 WDR III.D.2 |
Violation |
N |
Report |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1128680 |
09/01/2021 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. |
Violation |
N |
Report |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1128679 |
03/23/2021 |
Deficient Monitoring |
Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. |
Violation |
N |
Report |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1128678 |
06/15/2021 |
Groundwater |
Exceeded WQPS of Chloride during the 2021 1st Half Semiannual monitoring period. Violates Board Order R6V-2016-0004 MRP I.C. |
Violation |
N |
Report |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1125218 |
01/30/2024 |
Deficient Reporting |
(1) The EDF laboratory data of groundwater for the October 1, 2023 ¿ December 31, 2023, sampling and reporting period was due on January 30, 2024, but it has not been turned in as of March 8, 2024. 38 Days Late. Violates Board Order R6V-2021-0020 MRP IV.A. (2) Annual calibration documentation of instrument calibration and performance checks were not turned in. Violates Board Order R6V-2021-0020 MRP 11.C.4 (LCRS), MRP 11.D.4. (Unsaturated Zone), MRP 11.E.7 (Groundwater) |
Violation |
N |
Report |
Soledad Mountain Project |
443566 |
R6V-2021-0020 |
Y |
1125217 |
01/30/2024 |
Deficient Monitoring |
(1) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2023 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. ¿ Attachment A (2) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2023 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. ¿ Attachment A |
Violation |
N |
Report |
Soledad Mountain Project |
443566 |
R6V-2021-0020 |
Y |
1125216 |
10/03/2023 |
Deficient Monitoring |
Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 |
Violation |
N |
Report |
Soledad Mountain Project |
443566 |
R6V-2021-0020 |
Y |
1125205 |
11/14/2023 |
Groundwater |
Exceeded the concentration limits of Arsenic, Total Cyanide, and Total Dissolved Solids during the 2023 4th Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. |
Violation |
N |
Report |
Soledad Mountain Project |
443566 |
R6V-2021-0020 |
Y |
1125170 |
05/02/2023 |
Deficient Monitoring |
MW-6 was not sampled during 2023 Q1, 2023 Q2, 2023 Q3, 2023 Q4. Violates Board Order R6V-2021-0020 II.A.15. |
Violation |
N |
Report |
Soledad Mountain Project |
443566 |
R6V-2021-0020 |
N |
1125169 |
08/20/2023 |
Groundwater |
Exceeded the concentration limits of pH during the 2023 3rd Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. |
Violation |
N |
Report |
Soledad Mountain Project |
443566 |
R6V-2021-0020 |
Y |
1125168 |
04/01/2023 |
Deficient Monitoring |
(1) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2023 Quarter 2 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A (2) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2023 Quarter 2 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A |
Violation |
N |
Report |
Soledad Mountain Project |
443566 |
R6V-2021-0020 |
Y |
1125167 |
03/31/2023 |
Deficient Monitoring |
(1) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2023 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. ¿ Attachment A (2) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2023 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. ¿ Attachment A |
Violation |
N |
Report |
Soledad Mountain Project |
443566 |
R6V-2021-0020 |
Y |
1125165 |
04/01/2023 |
Deficient Monitoring |
Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 |
Violation |
N |
Report |
Soledad Mountain Project |
443566 |
R6V-2021-0020 |
Y |
1125164 |
07/08/2023 |
Deficient Monitoring |
Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 |
Violation |
N |
Report |
Soledad Mountain Project |
443566 |
R6V-2021-0020 |
Y |
1125163 |
06/15/2023 |
Groundwater |
(1) Exceeded the concentration limits of Arsenic, Total Dissolved Solids, and WAD Cyanide during the 2023 2nd Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. (2) Exceeded PQL of Chloroform during the 2023 2nd Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C.1.b. |
Violation |
N |
Report |
Soledad Mountain Project |
443566 |
R6V-2021-0020 |
Y |
1124193 |
11/02/2023 |
Groundwater |
Exceeded WQPS of Fecal Coliform, Iron, and Manganese during the 2023 Q4 monitoring period. Violates Board Order MRP II.G.2.a. |
Violation |
N |
Report |
Victor Valley Regional Compost |
406819 |
R6V-2016-0031 |
Y |
1124192 |
01/31/2024 |
Deficient Reporting |
(1) Wind direction is not recorded in the 2023 Q4 monitoring report. Violates Board Order MRP II.D. (2) Time-series do not include the applicable MCL or WQPS limits for each respective constituent or monitoring parameter. Violates Board Order MRP III.B.2. |
Violation |
N |
Report |
Victor Valley Regional Compost |
406819 |
R6V-2016-0031 |
Y |
1124189 |
08/02/2023 |
Groundwater |
Exceeded WQPS of Fecal Coliform, Iron, and Manganese during the 2023 Q3 monitoring period. Violates Board Order MRP II.G.2.a. |
Violation |
N |
Report |
Victor Valley Regional Compost |
406819 |
R6V-2016-0031 |
Y |
1124171 |
01/25/2024 |
Order Conditions |
(1) Discharge of windblown material and debris to the adjacent land north of the site. Violates Board Order R6V-2016-0031, WDR, Section II.7. Violates Board Order R6V-2016-0031, WDR, Section II.13. |
Violation |
None |
Inspection |
Victor Valley Regional Compost |
406819 |
R6V-2016-0031 |
Y |
1124170 |
10/31/2023 |
Deficient Reporting |
(1) Wind direction is not recorded in the 2023 Q3 monitoring report. Violates Board Order MRP II.D. (2) Time-series do not include the applicable MCL or WQPS limits for each respective constituent or monitoring parameter. Violates Board Order MRP III.B.2. |
Violation |
N |
Report |
Victor Valley Regional Compost |
406819 |
R6V-2016-0031 |
Y |