Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
636179 Ashley Taylor 760-243-4350 Ashley.Taylor@waterboards.ca.gov
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
Total Related Places: 0
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
137765 Lahontan Regional Water Quality Control Board, Victorville Office Organization Employee 11/10/2022 None Waterboard
Total Related Parties: 1
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
Total Regulatory Measures: 0
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
1134446 09/09/2024 Unauthorized Discharge Soil Safe is in violation for failure to obtain a 401 certification or dredge and fill permit, for the discharged soil into ephemeral washes, waters of the state. Should any additional work to be performed in this area or within the City of Adelanto, the landowners will be required to inquire on 401 certification or dredge and fill permitting. Additionally, a Construction Stormwater General Permit, Order WQ 2022-0057-DWQ, is required for construction projects greater than an acre, total disturbance area. Violation None Complaint Mojave Drive west of Fremontia Road 458757 None Y
1127297 02/19/2021 Groundwater Exceeded PQL of 1,1-Dichloroethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methane, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1127303 01/17/2022 Groundwater (1) Exceeded statistical limits of Bicarbonate Alkalinity as CACO3 and Sodium. Violates Board Order R6V-2016-0037 MRP II.A.3.b.i. (2) Exceeded PQL of 1,1-Dichloroethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichloroethene (TCE). Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1127304 09/01/2022 Groundwater (1) Exceeded statistical limits of Barium and Sodium. Violates Board Order R6V-2016-0037 MRP II.A.3.b.i. (2) Exceeded PQL of 1,1-Dichloroethane, Chloromethane, Dichlorodifluoromethane, Methane, Tetrachloroethene (PCE), and Trichloroethene (TCE). Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1128273 08/21/2020 Groundwater Exceeded PQL of 1,1-Dichloroethane, cis-1,2Dichloroethene, Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichloroethene (TCE). Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1114612 03/10/2023 Order Conditions Ponding on the southern and western roadways and site boundaries of the site is inconsistent with the site drainage plan and Stormwater Pollution and Prevention Plan and is a violation of Section III.A.13 & Section V.E.e.II.2 of the Board Order. Observations of ponding water were observed on January 3, 2023 and March 10, 2023. Violation N Inspection Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1127305 02/10/2023 Groundwater Exceeded PQL of 1,1-Dichloroethane, Dichlorodifluoromethane, Methane, Tetrachloroethene (PCE), and Trichloroethene (TCE). Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1114610 03/10/2023 Order Conditions Windblown litter off site is a violation of Section III.A.4 of the Board Order. While conducting inspection a significant amount of windblown trash was piling up along fence line and was blowing to adjacent properties. Violation N Inspection Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1114611 03/10/2023 Order Conditions Palm trees observed growing in Landfill cover in January 3, 2023 and on March 10th, 2023. Water Board staff commented to WM trees should not be growing in interim cover. March 2023 inspection palm trees were observed to concentrate storm water flow and runoff and resulted in erosion of interim cover, which is a violation of Section III.A.12 of Board Order. Violation N Inspection Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1127306 08/11/2023 Groundwater Exceeded PQL of 1,1-Dichloroethane, Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichloroethene (TCE). Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1127301 09/15/2021 Groundwater Exceeded PQL of 1,1-Dichloroethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichloroethene (TCE). Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1140139 04/09/2024 Groundwater Exceeded the CUSUM limit of Boron, Carbonate Alkalinity as CACO3, Chloroform, and Iron during the 1st half 2024 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140136 03/06/2023 Deficient Monitoring Unsaturated zone soil moisture exceeded upper tolerance limits. Violates Board Order R6V-2015-0057 MRP II.A.5.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140138 02/28/2024 Deficient Monitoring (1) Unsaturated zone soil moisture exceeded upper tolerance limits. Violates Board Order R6V-2015-0057 MRP II.A.5.b. (2) Soil moisture data for the VZ-05-05, VZ-05-10, VZ-05-15, VZ-05-20, VZ-05-25, VZ-05-30 were not included. Violates Board Order R6V-2015-0057 MRP II.A.5.b. (3) Soil moisture probes VZ-41-05, VZ-42-05, VZ-42-15, VZ-45-05 have no Upper Tolerance Limits listed in the monitoring report. Violates Board Order R6V-2015-0057 MRP II.A.5.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140128 12/31/2023 Order Conditions (1) Failure to maintain groundwater well 3M-71 during the 2nd half 2023 monitoring period. Violates Board Order R6V-2015-0057 WDR II.A.14. (2) Failure to maintain Soil Moisture TDT Sensors VMS-08-1-20 and VMS-08-2-30 during the 2nd half 2023 monitoring period. Violates Board Order R6V-2015-0057 WDR II.A.14. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140134 06/30/2023 Order Conditions (1) Failure to maintain groundwater well 3M-71 during the 1st half 2023 monitoring period. Violates Board Order R6V-2015-0057 WDR II.A.14. (2) Failure to maintain Soil Moisture TDT Sensors VMS-08-1-20 and VMS-08-2-30 during the 1st half 2023 monitoring period. Violates Board Order R6V-2015-0057 WDR II.A.14. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140135 03/27/2023 Groundwater Exceeded the CUSUM limit of Antimony, Carbonate Alkalinity as CACO3, Chloroform, Fluoride, and Iron during the 1st half 2023 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140129 08/03/2023 Groundwater Exceeded the CUSUM limit of Arsenic and Chloroform during the 2nd half 2023 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140137 06/30/2024 Order Conditions (1) Failure to maintain groundwater well 3M-71 during the 1st half 2024 monitoring period. Violates Board Order R6V-2015-0057 WDR II.A.14. (2) Failure to maintain Soil Moisture TDT Sensors VMS-08-1-20, VMS-08-2-30, VMS-26-1-20, VMS-26-2-30, VMS-34-1-20, VMS-34-2-30, VMS-35-1-20, VMS-35-2-30, VMS-36-1-20, VMS-36-2-30, VMS-27-1-20, and VMS-27-2-30 during the 2nd half 2023 monitoring period. Violates Board Order R6V-2015-0057 WDR II.A.14. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140133 01/31/2023 Deficient Monitoring (1) List of all monitoring pairs that have exhibited a verified measurably significant increase was not included. Violates Board Order R6V-2015-0057 MRP IV.3.a. (2) Wastewater average daily flow, volume of flow, and cumulative flow to each surface impoundment was not reported. Violates Board Order R6V-2015-0057 MRP II.A.1.b-d Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140132 09/20/2023 Deficient Monitoring (1) Unsaturated zone soil moisture exceeded upper tolerance limits. Violates Board Order R6V-2015-0057 MRP II.A.5.b. (2) Soil moisture data for the 2023 4th quarter was not collected. Violates Board Order R6V-2015-0057 MRP II.A.5.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1141543 01/26/2025 Order Conditions Board Order No. R6V-2015-0057, Section IV. B., Standard Provisions, The Discharger must comply with the ¿Standard Provisions for Waste Discharge Requirements,¿ dated September 1, 1994, in Attachment C¿¿ Standard Provisions, 2.a., Reporitng Requirements. ¿Pursuant to California Water Code 13267(b), the Discharger shall immediately notify the Regional Water Board by telephone whenever an adverse condition occurred as a result of this discharge; written confirmation shall follow within two weeks. An adverse condition includes, but is not limited to, spills of petroleum products or toxic chemicals, or damage to control facilities that could affect compliance Violation N Inspection Boron Mine Facility 403003 R6V-2015-0057 Y
1141542 01/26/2025 Order Conditions MRP, Section II.A.4.a.ii states ¿Upon detection of leachate in a previously dry LCRS that was dry during the prior week inspection (defined herein as an event), the Discharger shall immediately collect a grab sample of the leachate for the constituents of concern identified in Attachment A. Quarterly thereafter samples of the leachate in the LCRS must be sampled and analyzed for the constituents described and at the same frequency as monitoring wells, as specified in Attachment A. Violation N Inspection Boron Mine Facility 403003 R6V-2015-0057 Y
1141541 01/26/2025 Order Conditions 1. Board Order No. R6V-2015-0057, Section IV. B., Standard Provisions, The Discharger must comply with the ¿Standard Provisions for Waste Discharge Requirements,¿ dated September 1, 1994, in Attachment C¿¿ Standard Provisions, 2.a., Reporitng Requirements. ¿Pursuant to California Water Code 13267(b), the Discharger shall immediately notify the Regional Water Board by telephone whenever an adverse condition occurred as a result of this discharge; written confirmation shall follow within two weeks. An adverse condition includes, but is not limited to, spills of petroleum products or toxic chemicals, or damage to control facilities that could affect compliance. USB failed to notify the Water Board immediately upon detection of moisture in the LCRS, an adverse condition that occurred as a result of this discharge to BAP 8B on multiple occasions. Violation N Inspection Boron Mine Facility 403003 R6V-2015-0057 Y
1143414 02/13/2025 Other Codes Violation of Water Code Sections 13260, 13264(a), and 13377, 401 Certification Dredge/Fill Program: Failure to obtain a permit for any modifications to create and/or maintain the roadway through Anaverde Creek. The vehicles driving in Anaverde Creek, a natural drainage channel/ephemeral stream, pose potential risks to water quality and surrounding ecosystems as vehicles can discharge oils, greases, and other chemicals into the waterway. Additionally, vehicles can disrupt the flow of water causing turbulent waters that result in erosion. All temporary and permanent impacts to a Water of the State require the filing of a report of waste discharge for a dredge or fill permit. Violation None Inspection Antelope Valley Public Landfill 383527 R6V-2012-0042 Y
1126133 02/08/2023 Groundwater Exceeded Concentration Limits of Barium and Total Organic Carbon during the 2023 1st Half Monitoring Period. Violated R6V-2012-0042 WDR II.A.11 and MRP III.B.5.a. Violation N Report Antelope Valley Public Landfill 383527 R6V-2012-0042 Y
1143411 02/13/2025 Order Conditions Violation of Board Order R6V-2012-0042, Section I.B, ?No wastewater of storm water shall leave the Landfill except as (1) either permitted by a NPDES industrial stormwater permit issued in accordance with the federal Clean Water Act (CWA) and the Porter-Cologne Water Quality Control Act (commencing with the Water Code section 13000) or (2) the Discharger must submit an amended RWD that requests revising the WDR with applicable surface water discharge specifications. The Discharger shall maintain and modify, as necessary, the storm water pollution prevention plan develop for the Landfill.? The Industrial General Permit was terminated without the Discharger providing an amended RWD requesting the revision of the WDR. Violation None Inspection Antelope Valley Public Landfill 383527 R6V-2012-0042 Y
1117942 02/16/2022 Groundwater (1) Exceeded Concentration Limits of Total Organic Carbon during the 2022 1st Half Monitoring Period. Violated R6V-2012-0042 WDR II.A.11 and MRP III.B.5.a. (2) Exceeded two-non-naturally occurring waste constituents above MDL, 1,1-Dichloroethane, cis-1, 2-Dichloroethene, Dichlorodifluoromethane during the 2022 1st Half Monitoring Period. Violated R6V-2012-0042 WDR II.F.2. and MRP III.B.5. b. Violation N Report Antelope Valley Public Landfill 383527 R6V-2012-0042 N
1143416 02/13/2025 Order Conditions Violation of Board Order R6V-2012-0042, Monitoring and Reporting Program Section III.E., failure to maintain good housekeeping, e.g., trash debris, oil and grease. Violation None Inspection Antelope Valley Public Landfill 383527 R6V-2012-0042 Y
1143413 02/13/2025 Order Conditions Violation of Board Order R6V-2012-0042, Section II.G.5,? Storm water run-off within the Landfill shall either be contained on-site or be discharged in accordance with applicable storm water regulations. Storm water will be kept from running on site and will be diverted around the Landfill to Anaverde Creek.? The Landfill is not being operated or maintained with the applicable stormwater regulations as the discharge of contaminated storm water from the Landfill was observed on February 13, 2025, and was discharged to Anaverde Creek, a Water of the State. Violation None Inspection Antelope Valley Public Landfill 383527 R6V-2012-0042 Y
1117943 02/14/2022 Deficient Monitoring (1) A sample of soil gas monitoring points with a gas concentration over 5% Methane were not collected during the 2022 1st quarter monitoring period. Violated R6V-2012-0042 MRP III.D. Violation N Report Antelope Valley Public Landfill 383527 R6V-2012-0042 N
1117944 08/31/2022 Groundwater (1) Exceeded Concentration Limits of Total Organic Carbon during the 2022 2nd Half Monitoring Period. Violated R6V-2012-0042 WDR II.A.11 and MRP III.B.5.a. (2) Exceeded two-non-naturally occurring waste constituents above MDL, 1,1-Dichloroethane, cis-1, 2-Dichloroethene, Dichlorodifluoromethane during the 2022 2nd Half Monitoring Period. Violated R6V-2012-0042 WDR II.F.2. and MRP III.B.5. b. Violation N Report Antelope Valley Public Landfill 383527 R6V-2012-0042 N
1121136 01/12/2023 Groundwater (1) Exceeded MDL of 1,1-Dichloroethane, Chloroform, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Phenol, Tetrachloroethene (PCE), Trichloroethene (TCE), and Vinyl chloride. Violates Board Order R6V-2006-0026 MRP I.B.3. (2) Exceeded UTL of Alkalinity as CaCO3, Bicarbonate as HCO3, Calcium, Chloride, Hardness as CaCO3, Magnesium, Nitrogen, Nitrate (as N), Sodium, Sulfate, and Total Dissolved Solids. Violates Board Order R6V-2006-0026 MRP I.B.3. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 Y
1121145 01/12/2023 Order Conditions Exceeded soil gas MDL 1,1,2-Trichloro-1,2,2-trifluoroethane, 1,1-Dichloroethane, 1,1-Dichloroethene, 1,2,4-Trimethylbenzene, 1,2-Dichloro-1,1,2,2-tetrafluoroethane, Acetone, Benzene, Chloroethane, Chloromethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), trans-1,2-Dichloroethene, Trichloroethene (TCE), Trichlorofluoromethane, and Vinyl chloride. Violates Board Order R6V-2006-0026 MRP I.C.2. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 Y
1121121 01/18/2022 Groundwater (1) Exceeded MDL of 1,1-Dichloroethane, 1,4-Dichlorobenzene, Chloroform, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methyl-tert-butyl ether (MTBE), Phenol, Styrene, Tetrachloroethene (PCE), Trichloroethene (TCE), Trichlorofluoromethane, and Vinyl chloride. Violates Board Order R6V-2006-0026 MRP I.B.3. (2) Exceeded UTL of Alkalinity as CaCO3, Bicarbonate as HCO3, Calcium, Chloride, Hardness as CaCO3, Magnesium, Manganese, Sodium, Sulfate, and Total Dissolved Solids. Violates Board Order R6V-2006-0026 MRP I.B.3. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 N
1121126 07/14/2022 Order Conditions Exceeded soil gas MDL 1,1,2-Trichloro-1,2,2-trifluoroethane, 1,1-Dichloroethane, 1,1-Dichloroethene, 1,2,4-Trimethylbenzene, 1,2-Dichloro-1,1,2,2-tetrafluoroethane, 4-Methyl-2-pentanone, Acetone, Benzene, Carbon disulfide, Chloroethane, Chloroform, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Ethylbenzene, Methylene chloride, Tetrachloroethene (PCE), Toluene, trans-1,2-Dichloroethene, Trichloroethene (TCE), Trichlorofluoromethane, Vinyl chloride, and Xylene, Isomers m & p. Violates Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 N
1121125 07/14/2022 Groundwater (1) Exceeded MDL of 1,1-Dichloroethane, 1,4-Dichlorobenzene, Benzene, Chloroform, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methyl-tert-butyl ether (MTBE), Phenol, Tetrachloroethene (PCE), Trichloroethene (TCE), and Vinyl chloride. Violates Board Order R6V-2006-0026 MRP I.B.3. (2) Exceeded UTL of Alkalinity as CaCO3, Bicarbonate as HCO3, Calcium, Chloride, Hardness as CaCO3, Magnesium, Manganese, Sodium, Sulfate, and Total Dissolved Solids. Violates Board Order R6V-2006-0026 MRP I.B.3. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 N
1121122 01/18/2022 Order Conditions Exceeded soil gas MDL of 1,1,2-Trichloro-1,2,2-trifluoroethane, 1,1-Dichloroethane, 1,1-Dichloroethene, 1,2-Dichloro-1,1,2,2-tetrafluoroethane, 1,2-Dichloropropane, 4-Methyl-2-pentanone, Acrylonitrile, Benzene, Chloroethane, Chloroform, Chloromethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Ethylbenzene, Methylene chloride, o-Xylene, Tetrachloroethene (PCE), Toluene, trans-1,2-Dichloroethene, Trichloroethene (TCE), Trichlorofluoromethane, Vinyl chloride, and Xylene, Isomers m & p. Violates Board Order R6V-2006-0026 MRP I.C.2. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 N
1118703 04/07/2022 Groundwater Exceeded the MDL of Tetrachloroethene (PCE) during 2022 1st Half monitoring period. Violates Board Order R6V-1995-116 MRP I.A.3.b. Violation N Report Independence Class III Landfill 146861 95-116 Y
1118716 04/05/2023 Groundwater Exceeded the MDL of Dichlorodifluoromethane during 2023 1st Half monitoring period. Violates Board Order R6V-1995-116 MRP I.A.3.b. Violation N Report Independence Class III Landfill 146861 95-116 Y
1131592 09/04/2024 Order Conditions Violation of BO 6-91-95 Section, I.D.1 Violation None Inspection Soil Safe-Adelanto Soil Recycling Center 146138 91-935 Y
1114514 12/01/2020 Order Conditions (1) Treated soil samples exceeded the limit of Total petroleum hydrocarbons Measures as diesel during the 2020 Semi-annual 2nd half monitoring period. Violates Board Order R6V-01-0034 WDR I.C.1. (2) If soil sampled has contaminants at 12-inch depth, then a sample at 2-foot depth should be taken. The additional soil samples at 2-foot depth were not collected and analyzed during the 2020 2nd half monitoring period. Violates Board Order R6V-01-0034 WDR II.C.4 and SAP. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114619 06/25/2021 Order Conditions (1) Treated soil samples exceeded the limit of Total petroleum hydrocarbons Measures as diesel and gasoline during the 2021 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 WDR I.C.1. (2) If soil sampled has contaminants at 12-inch depth, then a sample at 2-foot should be taken. The additional soil samples at 2-foot depth were not collected and analyzed during the 2021 1st half monitoring period. Violates Board Order R6V-01-0034 WDR II.C.4 and the Sampling and Analysis Plan. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114625 05/16/2022 Order Conditions (1) Treated soil samples exceeded the limit of Total petroleum hydrocarbons Measures as diesel during the 2022 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 WDR I.C.1.; (2) If soil sampled has contaminants at 12-inch depth, then a sample at 2-foot should be taken. The additional soil samples at 2-foot depth were not collected and analyzed during the 2022 1st half monitoring period. Violates Board Order R6V-01-0034 WDR II.C.4 and the Sampling and Analysis Plan Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114512 08/27/2020 Groundwater (1) Exceeded MCL of Nitrate as N and Tetrachloroethene (PCE) during the 2020 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 WDR I.A.2. b. (2) Exceeded Practical Quantitation Limit (0.5 ug/L) of 1,1-Dichloroethane, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane during the 2020 Semi-annual 2nd Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii. (3) Exceeded Intra-Well Control Limits of Chloride, Nitrate as N, and Total Dissolved Solids during the 2020 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114624 02/28/2022 Groundwater (1) Exceeded MCL of Nitrate as N and Tetrachloroethene (PCE) during the 2022 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 WDR I.A.2. b.; (2) Exceeded Practical Quantitation Limit (0.5 ug/L) of 1,1-Dichloroethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane during the 2022 Semi-annual 1st Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii.; (3) Exceeded Intra-Well Control Limits of Chloride, Nitrate as N, and Total Dissolved Solids during the 2022 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114692 09/07/2022 Groundwater (1) Exceeded MCL of Nitrate and Tetrachloroethene (PCE) during the 2022 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 WDR I.A.2. b. (2) Exceeded Practical Quantitation Limit (0.5 ug/L) of 1,1-Dichloroethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane during the 2022 Semi-annual 2nd Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii. (3) Exceeded Intra-Well Control Limits of Chloride, Nitrate as N and Total Dissolved Solids during the 2022 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114621 08/31/2021 Groundwater (1) Exceeded MCL of Nitrate as N and Tetrachloroethene (PCE) during the 2021 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 WDR I.A.2. b. (2) Exceeded Practical Quantitation Limit (0.5 ug/L) of 1,1-Dichloroethane, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane during the 2021 Semi-annual 1st Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii. (3) Exceeded Intra-Well Control Limits of Nitrate as N and Total Dissolved Solids during the 2021 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114622 11/16/2021 Order Conditions (1) Treated soil samples exceeded the limit of Total petroleum hydrocarbons Measures as diesel during the 2021 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 WDR I.C.1.; (2) If soil sampled has contaminants at 12-inch depth, then a sample at 2-foot should be taken. The additional soil samples at 2-foot depth were not collected and analyzed during the 2021 2nd half monitoring period. Violates Board Order R6V-01-0034 WDR II.C.4 and the Sampling and Analysis Plan; (3) 150 cubic yards of treated soil was moved to the landfill for cover. Lab results that show the soil is below concentration limits was not provided in the 2021 2nd Half monitoring report. Violates Board Order R6V-01-0034 WDR I.C.1.; (4) Pond liner should be replaced before liquids migrate through 75% of the clay liner. Pond liner liquid migration not verified during the 2021 2nd half monitoring period. Violates Board Order R6V-01-003 WDR Finding 7. Description of Ponds; (5) The pond liner was not replaced during the sludge removal event of the 2021 2nd half monitoring period. Violates Board Order WDR I.E.5. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114618 02/23/2021 Groundwater (1) Exceeded MCL of Nitrate as N and Tetrachloroethene (PCE) during the 2021 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 WDR I.A.2. b. (2) Exceeded Practical Quantitation Limit (0.5 ug/L) of 1,1-Dichloroethane, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane during the 2021 Semi-annual 1st Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii. (3) Exceeded Intra-Well Control Limits of Chloride, Nitrate as N, and Total Dissolved Solids during the 2021 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1126165 02/21/2023 Groundwater (1) Exceeded Practical Quantitation Limit of1,1-Dichloroethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane during the 2023 Semi-annual 1st Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii. (2) Exceeded Intra-Well Control Limits of Chloride, Nitrate as N and Total Dissolved Solids during the 2023 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 Y
1125985 04/03/2024 Order Conditions Violation of Board Order 6-01-34, Standard Provisions 2.b - Pursuant to California Water Code Section 13260(c), any proposed material change in the character of the waste, manner or method of treatment or disposal, increase of discharge, or location of discharge, shall be reported to the Regional Board at least 120 days in advance of implementation of any such proposal. This shall include, but not limited to, all significant soil disturbances. Documentation of the proposed acceptance of other facilities septage sludge should have been provided to the Water Board at least 120 prior to acceptance. Violation None Inspection Bishop(Sunland)Class III LF 148395 01-034 Y
1126166 08/15/2023 Groundwater (1) Exceeded Practical Quantitation Limit of 1,1-Dichloroethane, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene, Trichloroethene (TCE, and Trichlorofluoromethane during the 2023 Semi-annual 2nd Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii. (2) Exceeded Intra-Well Control Limits of Chloride, Nitrogen, Nitrate (as N), Sulfate, and Total Dissolved Solids during the 2023 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 Y
1114704 12/15/2022 Order Conditions (1) Treated soil samples exceeded the limit of Total petroleum hydrocarbons Measures as diesel during the 2022 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 WDR I.C.1. (2) If soil sampled has contaminants at 12-inch depth, then a sample at 2-foot should be taken. The additional soil samples at 2-foot depth were not collected and analyzed during the 2022 2nd half monitoring period. Violates Board Order R6V-01-0034 WDR II.C.4 and the Sampling and Analysis Plan Violation N Report Bishop(Sunland)Class III LF 148395 01-034 Y
1126170 01/30/2024 Deficient Reporting (1) Reporting of pond freeboard, liner thickness verification, and saturation measurements was not included in the monitoring report or a separate report. Violates Staff Letter sent out 10/24/23 "Comments on the Septage and Septage Sludge Revised Sampling and Analysis Plan..." (2) Paint filter testing to determine free liquids in contaminated soil accepted for treatment was not reported to the RWQCB in the monitoring report or a separate report. Violates Staff Letter sent out 10/24/23 "Comments on the Landfarm Revised Sampling and Analysis Plan..." Violation N Report Bishop(Sunland)Class III LF 148395 01-034 Y
1125983 04/03/2024 Order Conditions Violation of Board Order 6-01-34, Section I.B.1, Section II.A.7, Section II.A.4, Section II.E.1 Violation None Inspection Bishop(Sunland)Class III LF 148395 01-034 Y
1135572 10/24/2024 Order Conditions Trash/litter observed out of containment, Violated BO 6-01-34, Section II.A.1 and 2 Violation None Inspection Bishop(Sunland)Class III LF 148395 01-034 Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 57
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
Total Enforcement Actions: 0
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 07/02/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page