Violation ID |
Occurrence Date |
Violation Type |
Violation Description(-) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
1141931 |
02/28/2025 |
CAT1 |
Total Suspended Solids (TSS), Percent Removal Monthly Minimum limit is 85.0 % and reported value was 79.0 % at EFF-001. |
Violation |
None |
Report |
Treasure Island WWTP/DOD |
438627 |
R2-2020-0020 |
N |
1141930 |
12/31/2024 |
CAT1 |
Total Suspended Solids (TSS), Percent Removal Monthly Minimum limit is 85.0 % and reported value was 82.0 % at EFF-001. |
Violation |
None |
Report |
Treasure Island WWTP/DOD |
438627 |
R2-2020-0020 |
N |
1141684 |
02/04/2025 |
OEV |
Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 350 MPN/100 mL at E-003. *** MMP Exempt Reason:Subject to stipulated penalties under a Consent Decree |
Violation |
N |
eSMR |
EBMUD SD#1-Wet Wthr Bypass |
399477 |
Monitoring for C09-00186-RS |
N |
1140607 |
01/29/2025 |
CAT2 |
Chlorine, Total Residual 1-Hour Average (Mean) limit is 0.065 mg/L and reported value was 0.168 mg/L at EFF-001. |
Violation |
N |
eSMR |
Napa Sanitation District WWTP (Soscol Water Recycling Facility) |
446586 |
R2-2022-0003 |
N |
1139726 |
01/01/2024 |
Order Conditions |
Bioassay exceedance for acute toxicity |
Violation |
N |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
N |
1131550 |
05/06/2024 |
CAT1 |
Carbonaceous Biochemical Oxygen Demand (CBOD) (5-day @ 20 Deg. C) Weekly Average limit is 40 mg/L and reported value was 64 mg/L at EFF-001. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
Y |
1131549 |
05/04/2024 |
CAT1 |
Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 104 mg/L at EFF-001. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
Y |
1128692 |
02/20/2024 |
Order Conditions |
Per the Feb SMR: On February 20 the Mariposa pump station pump rate briefly and intermittently dropped below 10 MGD because of overheating of one of the pumps. The effects of this issue on the average pumping rate and the volume of CSD was very small. The average pumping rate was approximately 8.8 MGD and the effect on CSD volume was less than 3%. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1128659 |
04/30/2024 |
CAT1 |
Total Suspended Solids (TSS) Monthly Average limit is 30.0 mg/L and reported value was 35.0 mg/L at EFF-001. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
Y |
1128656 |
04/04/2024 |
Order Conditions |
Did not comply with wet weather plant operational requirements, as described in Provision VI.C.5.c.iv(b). INF flow was not maximized while discharge from the Westside Transport/Storage Structure to Discharge Point No. 001 occurred. This resulted in approximately 6.4 MG of wastewater being discharged as decant rather than receiving primary treatment at OSP. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
N |
1128654 |
03/29/2024 |
Order Conditions |
Did not comply with wet weather plant operational requirements, as described in Provision VI.C.5.c.iv(b). INF flow was not maximized while discharge from the Westside Transport/Storage Structure to Discharge Point No. 001 occurred. This resulted in approximately 7.6 MG of wastewater being discharged as decant rather than receiving primary treatment at OSP. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
N |
1128649 |
02/04/2024 |
Order Conditions |
Did not comply with wet weather plant operational requirements, as described in Provision VI.C.5.c.iv. INF flow was not maximized due to a power outage at the Westside Pump Station, which stopped all pumping to OSP. Per the February SMR cover letter, CSDs from Vicente and Lincoln occurred on 2/4 at 7:15 p.m. and 7:40 p.m., respectively. It is not possible to determine whether CSDs would have occurred if there hadn?t been a power loss. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
N |
1128641 |
02/29/2024 |
CAT1 |
Total Suspended Solids (TSS), Percent Removal Monthly Minimum limit is 85.0 % and reported value was 83.0 % at EFF-001. |
Violation |
None |
Report |
Treasure Island WWTP/DOD |
438627 |
R2-2020-0020 |
N |
1124424 |
11/28/2023 |
Unauthorized Discharge |
A dry weather discharge occurred on November 28 from CSD-007 (Sea Cliff No. 2 pump station) between 10:09-10:16 a.m. An estimated 5,500 gallons of untreated wastewater was discharged. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
N |
1124422 |
11/29/2023 |
Order Conditions |
Did not comply with wet weather plant operational requirements, as described in Provision VI.C.5.c.iv(b). INF flow was not maximized while discharge from the Westside Transport/Storage Structure to Discharge Point No. 001 occurred. This resulted in approximately 0.75 MG of wastewater being discharged as decant rather than receiving primary treatment at OSP. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
N |
1124405 |
01/30/2023 |
ATOX |
Acute Toxicity-Rainbow Trout-survival 3-Sample Median limit is 90 % survival and reported value was 75 % survival at EFF-003. |
Violation |
None |
Report |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1123811 |
12/29/2023 |
OEV |
Enterococci Monthly 90th% limit is 1100 MPN/100 mL and reported value was 2000 MPN/100 mL at EFF-001D. |
Violation |
None |
Report |
Rodeo Sanitary District WWTP |
450497 |
R2-2022-0037 |
N |
1123635 |
10/30/2023 |
ATOX |
Acute Toxicity-Rainbow Trout-survival 3-Sample Median limit is 90 % survival and reported value was 25 % survival at EFF-003. |
Violation |
N |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1123634 |
07/31/2023 |
ATOX |
Acute Toxicity-Rainbow Trout-survival 3-Sample Median limit is 90.0 % survival and reported value was 25.0 % survival at EFF-003. |
Violation |
N |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1123633 |
07/31/2023 |
ATOX |
Acute Toxicity-Rainbow Trout-survival Single Sample Maximum limit is 70.0 % survival and reported value was 25.0 % survival at EFF-003. |
Violation |
N |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1123632 |
08/14/2023 |
ATOX |
Acute Toxicity-Rainbow Trout-survival Single Sample Maximum limit is 70.0 % survival and reported value was 20.0 % survival at EFF-003. |
Violation |
N |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1123631 |
08/14/2023 |
ATOX |
Acute Toxicity-Rainbow Trout-survival 3-Sample Median limit is 90.0 % survival and reported value was 25.0 % survival at EFF-003. |
Violation |
N |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1123630 |
10/30/2023 |
ATOX |
Acute Toxicity-Rainbow Trout-survival Single Sample Maximum limit is 70 % survival and reported value was 25.0 % survival at EFF-003. |
Violation |
N |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1123629 |
01/30/2023 |
ATOX |
Acute Toxicity-Rainbow Trout-survival Single Sample Maximum limit is 70 % survival and reported value was 40.0 % survival at EFF-003. |
Violation |
N |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1123628 |
07/24/2023 |
ATOX |
Acute Toxicity-Rainbow Trout-survival Single Sample Maximum limit is 70.0 % survival and reported value was 25.0 % survival at EFF-003. |
Violation |
N |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1122669 |
07/31/2023 |
CAT1 |
Total Suspended Solids (TSS), Percent Removal Monthly Minimum limit is 85 % and reported value was 82 % at EFF-001. |
Violation |
None |
Report |
Treasure Island WWTP/DOD |
438627 |
R2-2020-0020 |
N |
1121633 |
09/25/2023 |
Deficient Monitoring |
SFPUC invalidated three samples (9/23/2023, 9/24/2023, 9/25/2023) with high BOD results due to algae found in the composite sample. Because the BOD sample results were above the permitted effluent limits, but not representative of the effluent (as described below), Regional Board staff determined that the samples were not in compliance with Attachment D, section III.A of R2-2013-0029. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1121632 |
09/24/2023 |
Deficient Monitoring |
SFPUC invalidated three samples (9/23/2023, 9/24/2023, 9/25/2023) with high BOD results due to algae found in the composite sample. Because the BOD sample results were above the permitted effluent limits, but not representative of the effluent (as described below), Regional Board staff determined that the samples were not in compliance with Attachment D, section III.A of R2-2013-0029. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1121631 |
09/23/2023 |
Deficient Monitoring |
SFPUC invalidated three samples (9/23/2023, 9/24/2023, 9/25/2023) with high BOD results due to algae found in the composite sample. Because the BOD sample results were above the permitted effluent limits, but not representative of the effluent (as described below), Regional Board staff determined that the samples were not in compliance with Attachment D, section III.A of R2-2013-0029. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1121628 |
09/30/2023 |
CAT1 |
Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average (Mean) limit is 30 mg/L and reported value was 33 mg/L at EFF-001A. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
Y |
1121627 |
09/30/2023 |
CAT1 |
Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Weekly Average (Mean) limit is 45.0 mg/L and reported value was 46 mg/L at EFF-001A. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
Y |
1121626 |
09/02/2023 |
CAT1 |
Total Suspended Solids (TSS) Weekly Average (Mean) limit is 45 mg/L and reported value was 48 mg/L at EFF-001A. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
Y |
1121625 |
08/31/2023 |
CAT1 |
Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average (Mean) limit is 30 mg/L and reported value was 32 mg/L at EFF-001A. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
Y |
1120996 |
10/03/2023 |
Late Report |
Monthly SMR ( MONNPDES ) report for August 2023 (2727446) was due on 02-OCT-23 |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1120989 |
10/01/2023 |
Late Report |
Monthly SMR ( MONNPDES ) report for August 2023 (2326511) was due on 30-SEP-23 |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
N |
1119117 |
06/25/2023 |
Unauthorized Discharge |
Per the June SMR: On June 25, 2023, approximately 11.8 MG gallons of secondary treated, disinfected wastewater was discharged to Discharge Point No. EFF-002 (Quint Street Outfall). The discharge started at 7:42 a.m. and ended at 12:23 p.m. The cause was a loss of power to the Booster Pump Station (BPS), which pumps final effluent to Discharge Point No. 001 (Pier 80 Outfall). On Saturday June 24 at approximately 3:30 p.m., PG&E power to BPS was interrupted after PG&E infrastructure was damaged in a traffic accident. SFPUC Operations staff confirmed the issue after a field inspection at BPS. They began to recirculate wastewater flows within the plant and stored flows in upstream Transport/Storage (T/S) Boxes. Staff maintained communications with PG&E and on-call SFPUC electricians to prepare for power restoration. As of Saturday evening, PG&E had not provided an estimated timeframe for restoration. In anticipation of the possibility that power would not be restored before the Channel T/S Box capacity was exceeded, orders were issued to initiate discharge of treated effluent through the Quint Street outfall when Channel T/S Box level exceeded 290 inches to prevent a discharge of untreated wastewater. Channel T/S Box level exceeded this threshold at approximately 6:15 a.m. on Sunday June 25, 2023. Effluent flow to Discharge Point No. 002 commenced at 7:42 a.m. with an average flow rate of 60.5 million gallons per day (MGD). Power to BPS was restored at approximately 12:10 p.m. and discharge to Discharge Point No. 002 ceased at 12:23 p.m. All effluent discharged through Discharge Point No. 002 received full secondary treatment and disinfection. When PG&E power to BPS was restored, SFPUC electricians performed necessary electrical work to verify PG&E power and operating circuit breakers prior to restarting the pumps at BPS. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1119109 |
03/17/2023 |
Unauthorized Discharge |
Per March SMR: On March 17, 2023, approximately 115,000 gallons of secondary treated, disinfected wastewater was discharged to Discharge Point No. EFF-002 (Quint Street Outfall). The discharge started at 6:31 a.m. and ended at 6:40 a.m. The cause was an issue with transitioning one of the effluent pumps at the Booster Pump Station (BPS) from local control to automatic level control upon re-starting of the plant after a SEP shutdown. SEP was shut down on March 16 for construction activities for the Headworks Project. As part of the shutdown, BPS pumps were switched to local control for a planned sump inspection. The plant was re-started on March 16 at approximately 6:00 p.m. but one of the pumps was not switched from local to automatic control. As flows to SEP increased on the morning of March 17, the BPS pump still in local control did not start, resulting in the final effluent channel levels rising above the weir and effluent flowing to the Quint Street Outfall. Operations staff were immediately notified by a control system alarm when the discharge started and ceased the discharge by opening valve V20 to divert effluent flows from the Quint Street Outfall to the Islais Creek Transport/Storage Structure. Instrumentation & Controls (I&C) staff investigated the issue, including testing the controller logic for all pumps, and verified that the pumps were functioning as programmed. Daily composite samples collected and analyzed for COD and TSS were not elevated. Hourly total residual chlorine monitoring confirmed that the final effluent was fully dechlorinated. No adverse effects on Islais Channel were expected or observed during a visual survey performed at 6:40 a.m. Receiving water samples were collected for enterococcus on March 17 and 18, and concentrations were well below the applicable standard and SFPUC posting threshold. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1119108 |
03/28/2023 |
Order Conditions |
Per the March SMR: On March 21 and 28, San Francisco experienced two bomb cyclone events, bringing damaging winds, power outages, and flooding rains throughout Northern California. During the March 21 and 28 CSD events, SEP did not have an influent flow rate of at least 240 MGD. On March 28, a local power issue at 2:12 p.m. caused the BPS pumps to trip and shut off. Operations staff went onsite at 2:20 p.m., investigated the issue, and requested electrician support. Electricians fully reset the pumps at 2:46 p.m. and BPS flow achieved 110 MGD within 10 minutes. As a result of this power issue, an estimated additional 1.5MG ? or approximately an additional 11.7% ? was discharged in the Central Basin (12.49 MG, total CSD event volume). |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1119107 |
03/21/2023 |
Order Conditions |
Per the March SMR: On March 21 and 28, San Francisco experienced two bomb cyclone events, bringing damaging winds, power outages, and flooding rains throughout Northern California. During the March 21 and 28 CSD events, SEP did not have an influent flow rate of at least 240 MGD. On March 21, a PG&E power outage at BPS occurred at 3:45 p.m. while SEP was discharging 250 MGD. The power outage shut down BPS, which limited SEP discharge to Discharge Point No. 002. SEP continued to maximize secondary treatment at about 150 MGD and the SEP influent flow rate was 153 MGD (average) during the CSD to Islais Channel, which started at 8:40 p.m. SFPUC electricians restored BPS operations on March 22 at approximately 5:50 p.m., after PG&E restored power. As a result, an estimated additional 45.1 MG ? or approximately an additional 24% ? was discharged in the Central Basin (188.16 MG, total CSD event volume). |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1119106 |
03/09/2023 |
Order Conditions |
Per the March SMR: During the March 9-10 storm, two issues at the Channel Pump Station (CHS) limited influent pumping from CHS to SEP. As a result, an estimated additional 10.0 million gallons (MG) ? or approximately an additional 14% ? was discharged in the Central Basin (125.40 MG, total CSD event volume). On March 9, the CHS pump rate reached 80 MGD before a CSD to Mission Channel starting at about 8:56 p.m. Later that night, the CHS flow rate dropped to zero due to the following issues: (1) At approximately 9:30 p.m., power issues tripped the CHS pumps. Staff responded by restarting the pumps at 10 p.m. (2) On March 10 at about 1:30 a.m., the frame on the CHS downstream influent throttling gate detached from the hydraulic actuator. CSDs to Mission and Islais Channels were occurring during these incidents. Thereafter, CHS was shut down because the gate failure prevented pumping; staff responded by removing bolts and other materials that could potentially damage the bar screens and pumps. CHS was restarted manually at approximately 8:30 a.m. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1119105 |
04/15/2023 |
CAT1 |
Carbonaceous Biochemical Oxygen Demand (CBOD) (5-day @ 20 Deg. C) Weekly Average limit is 40.0 mg/L and reported value was 69.0 mg/L at EFF-001. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
Y |
1119103 |
04/15/2023 |
CAT1 |
Total Suspended Solids (TSS) Weekly Average limit is 45.0 mg/L and reported value was 63.0 mg/L at EFF-001. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
Y |
1115328 |
02/23/2023 |
Order Conditions |
During the February 23-24 overnight storm, the Channel Pump Station (CHS) pump rate reached 80 MGD before there was a CSD to Mission Channel from the Central Basin. During the CSD to Mission Channel from Discharge Points CSD-024 and 025, however, the CHS flow rate periodically dropped to less than 80 MGD due to the pumps tripping. As a result, an estimated additional 0.44 million gallons (MG) ? or approximately an additional 0.6% ? was discharged in the Central Basin (69.61 MG, total CSD event volume). |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1115326 |
01/09/2023 |
Order Conditions |
During the January 9 CSD event at the Mariposa outfall (Discharge Point No. CSD-029), MPS reached peak wet weather capacity (10 MGD) when the Mariposa CSD started but did not maintain that peak flow rate throughout the CSD event. Power issues during the storm caused the pumps to stop at 4:30 a.m. As a result, an estimated additional 0.26 million gallons (MG) or less than an additional 0.1% was discharged in the Central Basin (431.47 MG, total CSD event volume in Central Basin). |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1115323 |
12/31/2022 |
Order Conditions |
On New Year?s Eve at approximately 10:10 a.m., one of the two Northshore wet weather pumps (which provide flow to the North Point Wet Weather Facility) was out of service because a control board on the variable frequency drive (VFDs) failed. An electrician qualified to work on high voltages was called in from standby and was able to restore manual operation of the pump by 1:50 p.m. The pump was run in manual mode for all subsequent wet weather events until January 12. The temporary decrease in pumping to the North Point Wet Weather Facility potentially increased the volume of Northshore CSDs on December 31 by approximately 4%. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1115322 |
04/08/2022 |
Unauthorized Discharge |
Discharged approximately 55 gallons of hydraulic fluid from one of the Division Street Combined Sewer Discharge (CSD) Outfall gates (gate #5). The cause of the spill is believed to be the failure of two hydraulic position sensors associated with the Division Street CSD Outfall. Notified of an issue via control system alarm on 4/7, but did not notice an oil sheen on receiving water until 4/8. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1115242 |
02/04/2023 |
CAT1 |
Total Suspended Solids (TSS) Weekly Average limit is 45.0 mg/L and reported value was 48.0 mg/L at EFF-001. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
Y |
1115241 |
01/31/2023 |
CAT1 |
Total Suspended Solids (TSS), Percent Removal Monthly Average limit is 85 and reported value was 84 at EFF-001. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
Y |
1115240 |
01/31/2023 |
CAT1 |
Total Suspended Solids (TSS) Monthly Average limit is 30 mg/L and reported value was 31 mg/L at EFF-001. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
Y |
1115238 |
01/10/2023 |
Order Conditions |
Did not comply with wet weather plant operational requirements, as described in Provision VI.C.5.c.iv(b). INF flow was not maximized while discharge from the Westside Transport/Storage Structure to Discharge Point No. 001 occurred. This resulted in approximately 7 MG of wastewater being discharged as decant rather than receiving secondary treatment at OSP. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
N |
1115237 |
01/03/2023 |
Order Conditions |
Did not comply with wet weather plant operational requirements, as described in Provision VI.C.5.c.iv(b). INF flow was not maximized while discharge from the Westside Transport/Storage Structure to Discharge Point No. 001 occurred. This resulted in approximately 0.4 MG of wastewater being discharged as decant rather than receiving secondary treatment at OSP. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
N |
1115236 |
01/01/2023 |
Order Conditions |
Did not comply with wet weather plant operational requirements, as described in Provision VI.C.5.c.iv(b). INF flow was not maximized while discharge from the Westside Transport/Storage Structure to Discharge Point No. 001 occurred. This resulted in approximately 2.6 MG of wastewater being discharged as decant rather than receiving secondary treatment at OSP. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
N |
1115235 |
12/31/2022 |
Order Conditions |
Did not comply with wet weather plant operational requirements, as described in Provision VI.C.5.c.iv(b). INF flow was lost while discharge from the Westside Transport/Storage Structure to Discharge Point No. 001 occurred. This resulted in a less than 1% increase in the CSD volumes discharged from the Lake Merced (Discharge Point No. CSD-001), Vicente (CSD-002), and Lincoln (CSD-003) outfalls. |
Violation |
None |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
N |
1115164 |
10/24/2022 |
ATOX |
Acute Toxicity-Rainbow Trout-survival 3-Sample Median limit is 90.0 % survival and reported value was 40 % survival at EFF-003. |
Violation |
None |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1115163 |
10/17/2022 |
ATOX |
Acute Toxicity-Rainbow Trout-survival 3-Sample Median limit is 90.0 % survival and reported value was 40 % survival at EFF-003. |
Violation |
None |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1112928 |
07/25/2022 |
ATOX |
Acute Toxicity-Rainbow Trout-survival Single Sample Maximum limit is 70.0 % survival and reported value was 40.0 % survival at EFF-003. |
Violation |
N |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1112927 |
10/17/2022 |
ATOX |
Acute Toxicity-Rainbow Trout-survival Single Sample Maximum limit is 70.0 % survival and reported value was 0.0 % survival at EFF-003. |
Violation |
N |
eSMR |
EBMUD Orinda Filter Plant |
444166 |
R2-2021-0015 |
Y |
1112774 |
12/27/2022 |
OEV |
Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 310 MPN/100 mL at E-001. |
Violation |
N |
eSMR |
EBMUD SD#1-Wet Wthr Bypass |
399477 |
Monitoring for C09-00186-RS |
N |
1100564 |
12/16/2021 |
Unauthorized Discharge |
Discharged approximately 40,000 gallons of treated and disinfected effluent from SEP through a leaking pipe joint in the final effluent force main below Pier 80. Identified by contractors on 12/16, who notified SFPUC on 12/20. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1100520 |
10/24/2021 |
Order Conditions |
SEP flow was not maintained at 250 MGD during a wet weather event, as required by Provision VI.C.5.c.iii(c) of the SEP permit. This resulted in an approximate CSD volume increase of 4.7%. The issue was caused by a power interruption from PG&E at the Bruce Flynn Pump Station. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1100519 |
10/23/2021 |
Order Conditions |
CSDs occurred in the Northshore Basin before the North Point Facility reached 135 MGD, as required by Provision VI.C.5.c.iii(a) of the SEP permit. This resulted in an approximate CSD volume increase of 5.7%. The issue was caused by operator error. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1100518 |
10/21/2021 |
Order Conditions |
SEP flow was not maintained at 250 MGD during the wet weather event as required by Provision VI.C.5.c.iii(c) of the SEP permit, due to a blown manhole at the Facility's primary disinfection system (PDS), limiting the plants throughput to 150 MGD (secondary treatment capacity). This resulted in CSDs at in the Central Basin, as indicated by the SMR cover letter. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1100517 |
10/04/2021 |
ATOX |
Acute Toxicity 11 Sample 90th Percentile limit is 70.0 % survival and reported value was 35 % survival at EFF-001A. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
Y |
1097611 |
07/21/2021 |
ATOX |
Acute Toxicity 11 Sample 90th Percentile limit is 70 % survival and reported value was 50 % survival at EFF-001A. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
Y |
1097267 |
10/25/2021 |
CAT2 |
Chlorine, Total Residual Daily Maximum limit is 0.0 mg/L and reported value was 3.0 mg/L at E-001. |
Violation |
N |
eSMR |
EBMUD SD#1-Wet Wthr Bypass |
399477 |
Monitoring for C09-00186-RS |
Y |
1097266 |
10/25/2021 |
OEV |
Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 160000 MPN/100 mL at E-001. |
Violation |
N |
eSMR |
EBMUD SD#1-Wet Wthr Bypass |
399477 |
Monitoring for C09-00186-RS |
Y |
1097265 |
10/24/2021 |
OEV |
pH Instantaneous Minimum limit is 6.5 SU and reported value was 6.36 SU at E-001. |
Violation |
N |
eSMR |
EBMUD SD#1-Wet Wthr Bypass |
399477 |
Monitoring for C09-00186-RS |
Y |
1097264 |
10/24/2021 |
CAT2 |
Chlorine, Total Residual Daily Maximum limit is 0.0 mg/L and reported value was 5.4 mg/L at E-001. |
Violation |
N |
eSMR |
EBMUD SD#1-Wet Wthr Bypass |
399477 |
Monitoring for C09-00186-RS |
Y |
1097263 |
10/24/2021 |
OEV |
Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 160000 MPN/100 mL at E-001. |
Violation |
N |
eSMR |
EBMUD SD#1-Wet Wthr Bypass |
399477 |
Monitoring for C09-00186-RS |
Y |
1096743 |
08/05/2021 |
Unauthorized Discharge |
Discharged approximately 64,000 gallons of secondary treated, disinfected wastewater to EFF-002 due to an issue with the V20 valve located at the booster pump station during a power blip. |
Violation |
None |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1091449 |
02/15/2021 |
Order Conditions |
Did not comply with wet weather plant operational requirements, as described in Provision VI.C.5.c.iv(b). INF-001 did not reach 60 MGD prior to initiating discharge from the Westside Transport/Storage Structure to Discharge Point No. 001. This resulted in approximately 0.51 MGD (6% of total decant for the day) of extra untreated wastewater being discharged through EFF-001. |
Violation |
N |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
N |
1087679 |
12/23/2020 |
Unauthorized Discharge |
A leak from a joint on the forty-two-inch Islais Creek force main that conveys treated effluent from SEP to the Pier 80 deep-water outfall (Discharge Point No. 001) was initially discovered by a kayaker on December 23, 2020. SFPUC was notified and confirmed the leak on December 28, 2020. |
Violation |
N |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1087673 |
12/17/2020 |
Order Conditions |
A discharge occurred at CSD-029 before the Mariposa Pump Station reached 10 MGD, as required by Provision VI.C.5.c.iii(b) of the SEP permit. This resulted in an approximate CSD volume increase of 1.3%. The issue was caused by a drain valve blocked open. |
Violation |
N |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1087672 |
11/02/2020 |
ATOX |
Acute Toxicity 11-Sample Median limit is 90 % survival and reported value was 85 % survival at EFF-001A. |
Violation |
N |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
Y |
1087671 |
06/10/2020 |
Unauthorized Discharge |
On June 10-12, secondary treated and disinfected wastewater was discharged to San Francisco Bay from the SEP final effluent outfall pipe at a point approximately 470 feet upstream of Discharge Point No. 001. The discharge resulted from construction activities related to replacing a vent pipe section. Estimated release volume of 4,100 gallons, although discharge rate was sporadic and difficult to confirm. |
Violation |
N |
Report |
SF-SE Water Pollution Control Plant, N-Point & Bayside |
392750 |
R2-2013-0029 |
N |
1087659 |
12/14/2020 |
OEV |
Total Coliform 5-Sample Median limit is 240 MPN/100 mL and reported value was 1700 MPN/100 mL at EFF-001. |
Violation |
N |
Report |
Rodeo Sanitary District WWTP |
416321 |
R2-2017-0034 |
Y |
1087657 |
12/17/2020 |
Order Conditions |
Did not comply with wet weather plant operational requirements, as described in Provision VI.C.5.c.iv(b). INF-001 did not reach 60 MGD prior to initiating discharge from the Westside Transport/Storage Structure to Discharge Point No. 001. |
Violation |
N |
Report |
SF - OCEANSIDE Water Pollution Control Plant |
437599 |
R2-2019-0028 |
N |
1087653 |
01/12/2021 |
CAT1 |
Oil and Grease Maximum Daily (MDEL) limit is 20 mg/L and reported value was 35.1 mg/L at EFF-001. |
Violation |
N |
Report |
Treasure Island WWTP/DOD |
438627 |
R2-2020-0020 |
N |
1087652 |
01/12/2021 |
CAT1 |
Oil and Grease Monthly Average limit is 10 mg/L and reported value was 35.1 mg/L at EFF-001. |
Violation |
N |
Report |
Treasure Island WWTP/DOD |
438627 |
R2-2020-0020 |
N |
1087607 |
10/05/2020 |
OEV |
Total Coliform 5-Sample Median limit is 240 MPN/100 mL and reported value was 350 MPN/100 mL at EFF-001. |
Violation |
N |
Report |
Rodeo Sanitary District WWTP |
416321 |
R2-2017-0034 |
Y |
1082716 |
08/24/2020 |
CTOX |
Chronic Toxicity Monthly Average limit is 51 TUc and reported value was 59.2 TUc at EFF-001. |
Violation |
N |
Report |
Rodeo Sanitary District WWTP |
416321 |
R2-2017-0034 |
Y |
1078685 |
07/17/2020 |
CAT1 |
Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 48.0 mg/L at EFF-001. |
Violation |
N |
eSMR |
Rodeo Sanitary District WWTP |
416321 |
R2-2017-0034 |
Y |
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
|