Violation ID |
Occurrence Date |
Violation Type |
Violation Description(-) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
1113206 |
10/19/2022 |
Groundwater |
Halo Acetic Acid levels of 496 ug/L discovered in the downgradient drainage channel. Permit states that this constituent must not exceet 60 ug/L |
Violation |
None |
Report |
True Leaf Farms Fruit & Veg Processing Facility |
185259 |
R3-2004-0066 |
N |
1101555 |
11/03/2021 |
Order Conditions |
BOD loading rate limit for discharges to land is 30-day average < 100 lb/acre/day. Loading rate in November was 279.3 lb/acre/day. |
Violation |
N |
Report |
True Leaf Farms Fruit & Veg Processing Facility |
185259 |
R3-2004-0066 |
N |
1101554 |
09/15/2021 |
Order Conditions |
BOD loading rate for discharges to land has a limit of 30-day average <100 lb/ac/day. The 30-day average for September was 234.5 lb/ac/day. |
Violation |
N |
Report |
True Leaf Farms Fruit & Veg Processing Facility |
185259 |
R3-2004-0066 |
N |
1095320 |
05/12/2021 |
Order Conditions |
BOD Loading was 119.1 lbs/acre/day when maximum value mandated by order is 100 lbs/acre/day |
Violation |
N |
Report |
True Leaf Farms Fruit & Veg Processing Facility |
185259 |
R3-2004-0066 |
N |
1095319 |
04/21/2021 |
Order Conditions |
BOD Loading was 259.4 lbs/acre/day when maximum value mandated by order is 100 lbs/acre/day |
Violation |
N |
Report |
True Leaf Farms Fruit & Veg Processing Facility |
185259 |
R3-2004-0066 |
N |
1095318 |
07/22/2020 |
Order Conditions |
BOD Loading was 126.2 lbs/acre/day when maximum value mandated by order is 100 lbs/acre/day |
Violation |
N |
Report |
True Leaf Farms Fruit & Veg Processing Facility |
185259 |
R3-2004-0066 |
N |
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
|