Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
137813 Julio Lara 951-782-4901 julio.lara@waterboards.ca.gov
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
Total Related Places: 0
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
137767 Santa Ana Regional Water Quality Control Board Organization Employee 06/17/2005 None Waterboard
137760 Los Angeles Regional Water Quality Control Board Organization Employee 06/17/2004 06/16/2005 Waterboard
Total Related Parties: 2
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
Total Regulatory Measures: 0
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
1061622 06/04/2019 CAT2 Copper, Total Recoverable 6-Month Median limit is 0.0036 lb/day and reported value was 0.0083 lb/day at M-INTB. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1061623 06/04/2019 OEV pH Instantaneous Maximum limit is 9 SU and reported value was 10.05 SU at M-INTB. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1061624 06/10/2019 Order Conditions Temp Diff b/n Intake and Discharge Instantaneous Maximum limit is 30.0 Degrees C and reported value was 30.7 Degrees C at M-001. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1062055 07/02/2019 CAT2 Copper, Total Recoverable 6-Month Median limit is 0.0034 lb/day and reported value was 0.0081 lb/day at M-INTB. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1062054 07/18/2019 Order Conditions Temp Diff b/n Intake and Discharge Instantaneous Maximum limit is 30 Degrees C and reported value was 33.2 Degrees C at M-001. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1064541 08/06/2019 CAT2 Copper, Total 6-Month Median limit is 0.0032 lb/day and reported value was 0.0084 lb/day at M-INTB. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1066061 09/10/2019 CAT2 Copper, Total Recoverable 6-Month Median limit is 0.0033 lb/day and reported value was 0.0078 lb/day at M-INTB. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1065990 09/22/2019 OEV Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 261.3 MPN/100 mL at M-001B. Violation N eSMR IEUA Regional Plant No. 1 394393 R8-2015-0036 N
1067552 10/10/2019 CAT2 Copper, Total Recoverable 6-Month Median limit is 0.0034 lb/day and reported value was 0.0066 lb/day at M-INTB. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1067549 10/14/2019 Deficient Reporting pH hold time for the duplicate sample exceeded 15 minutes. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1067550 10/23/2019 Deficient Monitoring Flow meter power failure occurred at approximately 1:00 am on 10/23/2019. Confirmed valve was in closed position on 10/24/2019, at approximately 9:00 am. However, valve may have been open during this time without monitoring. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1067551 10/24/2019 Deficient Monitoring Flow meter power failure occurred at approximately 1:00 am on 10/23/2019. Confirmed valve was in closed position on 10/24/2019, at approximately 9:00 am. However, valve may have been open during this time without monitoring. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1068234 11/05/2019 CAT2 Copper, Total Recoverable 6-Month Median limit is 0.0038 lb/day and reported value was 0.0067 lb/day at M-INTB. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1069960 12/03/2019 Deficient Monitoring Intermittent flow meter and integrator failures occurred between December 3rd and December 18th. Manual logs were kept by the operators during this period. Reported daily flows during this period were estimated based on the manual logs. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1069959 12/19/2019 CAT2 Copper, Total Recoverable 6-Month Median limit is 0.0056 lb/day and reported value was 0.0082 lb/day at M-INTB. Violation N eSMR Huntington Beach Generating Station 377497 R8-2014-0076 N
1070249 12/31/2019 OEV Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 365.4 MPN/100 mL at REC-002. Violation N eSMR IEUA Regional Plant No. 4 394393 R8-2015-0036 N
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 16
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
Total Enforcement Actions: 0
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 06/03/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page