Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
137765 Lahontan Regional Water Quality Control Board, Victorville Office Waterboard 15095 Amargosa Road 210 Victorville, CA 92394 760-241-6583 None
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
Total Related Places: 0
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
645925 Kelly Huck Person Employee 06/24/2024 None None
644975 David Ryan Person Employee 05/02/2024 None None
644893 Aileen Chea Person Employee 04/25/2024 None None
644171 Hannah Bartholomew Person Employee 03/11/2024 None None
644145 Darin Witt Person Employee 03/08/2024 None None
642750 Luis Gomez Person Employee 11/17/2023 None None
639419 Cristina Sedano Person Employee 05/16/2023 None None
639418 Ariel Lafarga Person Employee 05/16/2023 None None
639415 Toufic Zeidan Person Employee 05/16/2023 None None
639252 Nikki Donnelly Person Employee 05/03/2023 None None
638918 Jairo Luque Person Employee 04/10/2023 None None
638495 Tiara Crucius Person Employee 03/16/2023 None None
637452 Omid Bozorg-Haddad Person Employee 02/15/2023 12/01/2023 None
637080 Lauder Fairchok Person Employee 04/27/2023 None None
636179 Ashley Taylor Person Employee 11/10/2022 None None
635065 Bridget Moffat Person Employee 08/30/2022 None None
632699 Melissa Thaw Person Employee 04/21/2022 None None
632482 Tyler Serrano Person Employee 04/08/2022 None None
631845 Bryan Talmadge Person Employee 03/24/2022 None None
626239 Andrew Robinson Person Employee 07/19/2021 None None
625486 John Yu Person Employee 06/17/2021 None None
621605 Mark Allen Person Employee 01/02/2024 None None
620534 Christopher Spellman Person Employee 12/07/2020 12/21/2020 None
618603 Molina Hauv Person Employee 10/09/2020 None None
610779 Rebeca Griner Person Employee 06/03/2021 None None
604334 Mark Lemus Person Employee 11/18/2019 06/02/2021 None
603716 Danielle Borchmann Person Employee 10/24/2019 None None
598443 Angelica Soto Person Employee 06/04/2019 None None
593645 Jose Valle de Leon Person Employee 09/01/2023 None None
585657 Valerie Enright Person Employee 10/30/2018 06/19/2019 None
574473 Reginald Tan Person Employee 08/07/2023 None None
574339 Alicia Borchmann Person Employee 03/01/2018 None None
573623 Abby Cazier Person Employee 04/19/2023 None None
573149 Timothy Middlemis-Clark Person Employee 10/08/2020 None None
569592 Emily Cushman Person Employee 07/01/2022 05/17/2023 None
568256 Amanda Lopez Person Employee 09/05/2017 None None
568050 Christopher Avalos Person Employee 08/21/2017 None None
566198 Tiffany Steinert Person Employee 07/25/2017 None None
564951 Russell Norman Person Employee 06/29/2017 None None
563429 Allysen Calalang Person Employee 08/09/2021 None None
563163 Shelby Barker Person Employee 03/30/2017 None None
563163 Shelby Barker Person Employee 04/03/2017 None None
560735 Garrett Fong Person Employee 01/18/2018 None None
558127 Woonhoe Kim Person Employee 07/25/2018 08/29/2019 None
556186 Sandra Lopez Person Employee 05/05/2016 None None
555190 Kathleen Bindl Person Employee 01/23/2020 01/30/2024 None
554377 Ed Hancock Person Employee 12/17/2024 None None
553875 Phoebe Khan Person Employee 07/10/2020 None None
553056 Jane Covey Person Employee 05/03/2018 None None
552757 Jeffrey Fitzsimmons Person Employee 08/27/2015 07/06/2022 None
550946 Catherine Pool Person Employee 06/09/2015 11/01/2022 None
549199 Tobe Deleted Person Employee 11/21/2014 11/30/2017 None
548953 Caren Patterson Person Employee 10/23/2018 None None
548677 Todd Battey Person Employee 10/03/2014 12/31/2022 None
545131 Shannon Utley Person Employee 01/30/2014 03/14/2017 None
544184 Crista McCauley Person Employee 11/14/2013 05/04/2016 None
543386 Kerri Okeefe Person Employee 10/02/2013 None None
542402 William Muir Person Employee 08/07/2013 None None
540299 Tirunesh Futassa Person Employee 06/03/2013 None None
536350 Thomas Browne Person Employee 08/21/2012 05/17/2023 None
533299 Austin White Person Employee 04/23/2012 01/01/2017 None
532901 Breeanna Copeland Person Employee 04/10/2012 01/01/2017 None
532336 Jorge Orozco Person Employee 05/01/2012 None None
531549 Emily Miller Person Employee 02/01/2012 None None
529633 Jewels Caldera Person Employee 10/17/2011 03/16/2012 None
528427 Christopher White Person Employee 08/11/2011 06/29/2012 None
524574 Test Test Person Employee 09/14/2010 03/07/2012 None
524277 Allison Brantton Person Employee 06/16/2011 01/01/2012 None
523284 Keith Rivera Person Employee 06/28/2010 04/01/2007 None
521818 Lisa Scoralle Person Employee 03/24/2010 None None
520739 Sam Lamech Person Employee 01/06/2010 04/01/2014 None
520716 Jillian Kim Person Employee 01/04/2010 09/22/2011 None
520629 Sam Lamach Person Employee 12/21/2009 04/01/2007 None
520429 Randall Morlan Person Employee 08/24/2010 08/21/2012 None
508837 Curtis Hayes Person Employee 06/02/2009 09/22/2011 None
499397 Nai Saeteurn Person Employee 02/27/2009 08/31/2012 None
498699 Christina Guerra Person Employee 11/05/2009 None None
493281 Angie Sturm Person Employee 07/20/2011 01/01/2012 None
484338 Alonzo Poach Person Employee 08/27/2015 None None
484338 Alonzo Poach Person Employee 09/03/2008 01/01/2010 None
484337 Sergio Alonso Person Employee 07/13/2018 None None
484337 Sergio Alonso Person Employee 09/03/2008 04/01/2015 None
483823 Jan Zimmerman Person Employee 08/27/2008 None None
461725 Ghasem Pour-ghasemi Person Employee 03/11/2008 05/01/2023 None
455364 Vanessa Ramirez Person Employee 06/19/2008 09/01/2012 None
454602 John Morales Person Employee 03/06/2008 None None
448877 Omar Pacheco Person Employee 04/10/2008 None None
390465 Mack Hakakian Person Employee 07/26/2007 04/01/2007 None
366861 Ranveer Sandhu Person Employee 07/24/2007 09/22/2011 None
340674 Herbert Jackson Person Employee 09/07/2006 05/31/2007 None
340463 Don Swiden Person Employee 01/14/2010 01/29/2010 None
330313 Katie Everett Person Employee 05/21/2007 12/31/2022 None
324354 Jeni Shipley Person Employee 07/24/2007 11/01/2008 None
322152 Francis Coony Person Employee 06/12/2006 12/30/2018 None
317551 Judy Keir Person Employee 01/18/2007 01/01/2010 None
149685 Jarma Bennett Person Employee 09/23/2020 None None
149666 Karol Ing Person Employee 07/30/2007 08/01/2009 None
149563 Victoria Whitney Person Employee 05/10/2011 None None
147229 Rebecca Phillips Person Employee 06/20/2005 12/30/2018 None
147224 Robert Tucker Person Employee 07/20/2011 03/29/2024 None
147216 Tobi Tyler Person Employee 12/19/2012 None None
147070 Catherine Woody Person Employee 03/13/2023 None None
139764 Diana Henrioulle Person Employee 01/01/1995 06/30/1999 None
139733 Brian Grey Person Employee 04/19/2007 None None
139663 Region 6B Person Employee 06/17/2005 None None
139603 Shannon Smith Person Employee 06/17/2005 None None
139602 Steve Fischenich Person Employee 06/17/2005 04/01/2007 None
139569 Brianna St. Pierre Person Employee 09/16/2008 03/30/2017 None
139469 Robin Coale Person Employee 06/17/2005 11/30/2018 None
139429 Linda Stone Person Employee 04/18/2008 None None
139322 Christy Hunter Person Employee 06/17/2005 06/30/2017 None
139291 John Steude Person Employee 06/17/2005 None None
139254 Craig Kibby Person Employee 06/17/2005 04/01/2007 None
139192 Christie Castro Person Employee 06/17/2005 01/01/2010 None
139180 Patrice Copeland Person Employee 08/20/2008 05/17/2023 None
139180 Patrice Copeland Person Employee 06/17/2004 06/16/2005 None
139169 Keith Elliott Person Employee 03/02/2011 10/31/2011 None
139107 Tom Gavigan Person Employee 11/10/2020 None None
139096 Alan Sabawi Person Employee 06/17/2005 01/01/2014 None
138778 Compliance Login R6B Person Employee 06/17/2005 None None
138700 John Short Person Employee 01/01/1990 06/30/1999 None
138677 Scott Ferguson Person Employee 02/28/2012 None None
138675 Lisa Dernbach Person Employee 06/17/2005 None None
138619 Eugene Rondash Person Employee 06/17/2005 04/01/2007 None
138618 Kai Dunn Person Employee 06/17/2005 01/01/2007 None
138589 Richard Juricich Person Employee 06/17/2005 None None
138583 Chris Adair Person Employee 06/17/2005 03/01/2013 None
138579 Alan Miller Person Employee 12/19/2012 09/04/2018 None
138404 Ken Carter Person Employee 06/17/2005 04/01/2007 None
138403 Averil Biggar Person Employee 06/17/2005 01/01/2017 None
138401 Ted Saari Person Employee 06/17/2005 04/01/2007 None
138400 Rosalyn Fleming Person Employee 06/17/2005 09/25/2011 None
138399 Mike Plaziak Person Employee 06/17/2005 04/01/2016 None
138398 Martin Sandoval Person Employee 06/17/2005 04/01/2007 None
138397 Joe Koutsky Person Employee 06/17/2005 01/01/2015 None
138396 Jehiel Cass Person Employee 06/17/2005 11/01/2021 None
138395 Hisam Baqai Person Employee 06/17/2005 04/01/2015 None
138394 Diana Ventura Person Employee 06/17/2005 04/01/2007 None
138393 Curt Shifrer Person Employee 06/17/2005 03/31/2009 None
138392 Cindi Mitton Person Employee 06/17/2005 01/01/2017 None
138339 Alan Miller Person Employee 06/17/2005 09/04/2018 None
138338 IKE LUKES Person Employee 06/17/2005 01/01/2010 None
138338 Ike Lukes Person Employee 06/17/2005 01/01/2010 None
138337 Tony Klecha Person Employee 06/17/2005 04/01/2007 None
138336 Thomas Howard Person Employee 06/17/2005 None None
138333 Ted Evans Person Employee 06/17/2005 None None
138332 Robert Dodds Person Employee 06/17/2005 05/02/2008 None
138298 Wendy Wyels Person Employee 11/21/2019 None None
138281 Tim Post Person Employee 06/17/2005 04/01/2010 None
138280 Doug Feay Person Employee 06/17/2005 02/01/2010 None
138279 Michele Ochs Person Employee 06/17/2005 04/01/2007 None
138278 Joe Kenny Person Employee 06/17/2005 07/01/2006 None
138277 Lawrence Ware Person Employee 06/17/2005 04/01/2007 None
138275 Stephen Niou Person Employee 06/17/2005 04/01/2007 None
138271 Robert Erlich Person Employee 07/13/2006 03/08/2019 None
138215 Chris Cochran Person Employee 06/17/2005 04/01/2007 None
138212 George Tribiuno Person Employee 06/17/2005 04/01/2007 None
138211 Mark Shultz Person Employee 06/17/2005 None None
138151 Chayr Wedlake Person Employee 06/17/2005 01/01/2017 None
138106 Renan Jauregui Person Employee 01/07/2016 None None
138010 Elizabeth Lafferty Person Employee 06/17/2005 04/01/2007 None
137910 Cheryl Hanley Person Employee 06/17/2005 02/27/2020 None
137905 Eric Taxer Person Employee 06/17/2005 None None
137855 Brad Nelson Person Employee 06/17/2005 01/01/2017 None
137806 Athar Khan Person Employee 04/12/2007 12/31/2007 None
132669 Tom Rheiner Person Employee 06/17/2005 04/01/2007 None
106897 Herb Jackson Person Employee 03/12/2007 06/17/2014 None
105791 Greg Cash Person Employee 06/17/2005 03/10/2006 None
86062 Mary Dellavalle Person Employee 08/08/2005 04/01/2015 None
Total Related Parties: 169
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
Total Regulatory Measures: 0
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
1143416 02/13/2025 Order Conditions Violation of Board Order R6V-2012-0042, Monitoring and Reporting Program Section III.E., failure to maintain good housekeeping, e.g., trash debris, oil and grease. Violation None Inspection Antelope Valley Public Landfill 383527 R6V-2012-0042 N
1143414 02/13/2025 Other Codes Violation of Water Code Sections 13260, 13264(a), and 13377, 401 Certification Dredge/Fill Program: Failure to obtain a permit for any modifications to create and/or maintain the roadway through Anaverde Creek. The vehicles driving in Anaverde Creek, a natural drainage channel/ephemeral stream, pose potential risks to water quality and surrounding ecosystems as vehicles can discharge oils, greases, and other chemicals into the waterway. Additionally, vehicles can disrupt the flow of water causing turbulent waters that result in erosion. All temporary and permanent impacts to a Water of the State require the filing of a report of waste discharge for a dredge or fill permit. Violation None Inspection Antelope Valley Public Landfill 383527 R6V-2012-0042 N
1143413 02/13/2025 Order Conditions Violation of Board Order R6V-2012-0042, Section II.G.5,? Storm water run-off within the Landfill shall either be contained on-site or be discharged in accordance with applicable storm water regulations. Storm water will be kept from running on site and will be diverted around the Landfill to Anaverde Creek.? The Landfill is not being operated or maintained with the applicable stormwater regulations as the discharge of contaminated storm water from the Landfill was observed on February 13, 2025, and was discharged to Anaverde Creek, a Water of the State. Violation None Inspection Antelope Valley Public Landfill 383527 R6V-2012-0042 N
1143411 02/13/2025 Order Conditions Violation of Board Order R6V-2012-0042, Section I.B, ?No wastewater of storm water shall leave the Landfill except as (1) either permitted by a NPDES industrial stormwater permit issued in accordance with the federal Clean Water Act (CWA) and the Porter-Cologne Water Quality Control Act (commencing with the Water Code section 13000) or (2) the Discharger must submit an amended RWD that requests revising the WDR with applicable surface water discharge specifications. The Discharger shall maintain and modify, as necessary, the storm water pollution prevention plan develop for the Landfill.? The Industrial General Permit was terminated without the Discharger providing an amended RWD requesting the revision of the WDR. Violation None Inspection Antelope Valley Public Landfill 383527 R6V-2012-0042 N
1143388 01/01/2025 Deficient Monitoring The previous samples taken at the AFRL do not comply with the permit requirement cited in for the Facility Effluent Monitoring, specifically eight-hour composite samples. Violating board order 6-99-33 MRP Section I.B.1 Violation N Report Airforce Research Lab STP 146721 99-033 N
1143020 01/26/2025 Late Report 4Q24 report due 1/15/25; not uploaded to GeoTracker til 4/29/25 (late report violation). Violation N Report Green Valley Foods 416725 None N
1143019 10/26/2024 Late Report 3Q24 report due 10/15/24, not uploaded to GeoTracker til 4/29/25 (late report violation). Violation N Report Green Valley Foods 416725 None N
1143009 02/12/2024 Deficient Reporting Violations of Board Order No. 6-00-18, MRP II.A.1. and II.A.4. Discharger did not share any information regarding class III waste disposal during the reporting period. Violation N Report Fort Irwin Class III Landfill 148187 00-018 N
1143008 02/12/2024 Order Conditions Concentrations for many constituents of concern in soil gas exceed the method detection limit from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order WDR MRP I.B.3 Violation N Report Fort Irwin Class III Landfill 148187 00-018 N
1143007 02/12/2024 Groundwater Historical and ongoing condition pending next steps. Exceeded WQPS concentration limits for multiple inorganic and organic constituents in groundwater from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order 6-00-18 MRP I.A.3.a. and b. Violation N Report Fort Irwin Class III Landfill 148187 00-018 N
1143006 02/12/2024 Order Conditions Discharger submitted Report approximately 10 months late. Violating Board Order R6V-2000-0018, MRP section IV.6. Violation N Report Fort Irwin Class III Landfill 148187 00-018 N
1143005 02/12/2024 Failure to Notify Failure to include a transmittal letter with essential points pointed out, including a discussion of violations and actions taken or planned for correcting those violations. Violates Board Order 00-18 MRP Req. III. A. 2. Violation N Report Fort Irwin Class III Landfill 148187 00-018 N
1142995 01/15/2024 Late Report Discharger submitted Report approximately 10 months late. Violating Board Order R6V-2000-0018, MRP section IV.6. Violation N Report Fort Irwin Class III Landfill 148187 00-018 N
1142984 01/15/2024 Failure to Notify Failure to include a transmittal letter with essential points pointed out, including a discussion of violations and actions taken or planned for correcting those violations. Violates Board Order 00-18 MRP Req. III. A. 2. Violation N Report Fort Irwin Class III Landfill 148187 00-018 N
1142983 01/15/2024 Groundwater Historical and ongoing condition pending next steps. Exceeded WQPS concentration limits for multiple inorganic and organic constituents in groundwater from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order 6-00-18 MRP I.A.3.a. and b. Violation N Report Fort Irwin Class III Landfill 148187 00-018 N
1142982 01/15/2024 Order Conditions Historical and ongoing condition pending next steps. Concentrations for many constituents of concern in soil gas exceed the method detection limit from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order WDR MRP I.B.3 Violation N Report Fort Irwin Class III Landfill 148187 00-018 N
1142981 01/15/2024 Late Report Discharger submitted Report over a year late. Violating Board Order R6V-2000-0018, MRP section IV.5. Violation N Report Fort Irwin Class III Landfill 148187 00-018 N
1142856 01/15/2024 Deficient Reporting According to the MRP No. 97-37, Pg. 3 Section II.C. states submittal period requirements. These requirements state, "By January 15 of each year, the Discharger shall submit an annual report to the Regional Board..." This report was due on 1/15/2024 but not submitted. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142855 01/15/2023 Deficient Reporting According to the MRP No. 97-37, Pg. 3 Section II.C. states submittal period requirements. These requirements state, "By January 15 of each year, the Discharger shall submit an annual report to the Regional Board..." This report was due on 1/15/2023 but not submitted. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142854 01/15/2022 Deficient Reporting According to the MRP No. 97-37, Pg. 3 Section II.C. states submittal period requirements. These requirements state, "By January 15 of each year, the Discharger shall submit an annual report to the Regional Board..." This report was due on 1/15/2022 but not submitted. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142852 01/15/2021 Deficient Reporting According to the MRP No. 97-37, Pg. 3 Section II.C. states submittal period requirements. These requirements state, "By January 15 of each year, the Discharger shall submit an annual report to the Regional Board..." This report was due on 1/15/2021 but not submitted. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142850 07/15/2024 Late Report According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 7/15/2024 but not submitted until 8/2/2024. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142849 04/15/2024 Late Report According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 4/15/2024 but not submitted until 8/2/2024. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142847 01/15/2024 Late Report According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 1/15/2024 but not submitted until 8/3/2024. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142846 10/15/2023 Late Report According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 10/15/2023 but not submitted until 8/3/2024. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142845 07/15/2023 Late Report According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 7/15/2023 but not submitted until 8/2/2024. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142844 04/15/2023 Late Report According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 4/15/2023 but not submitted until 8/2/2024. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142843 01/15/2023 Late Report According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 1/15/2023 but not submitted until 2/3/2023. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142840 10/15/2022 Late Report According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 10/15/2022 but not submitted until 2/3/2023. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142838 07/15/2022 Late Report According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 7/15/2022 but not submitted until 8/26/2022. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142837 04/15/2022 Late Report According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 4/15/2022 but not submitted until 8/26/2022. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142835 01/15/2022 Late Report According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 1/15/2022 but not submitted until 3/11/2022. Violation N Report Convict Lake Campground WTF 146807 95-037 N
1142832 06/01/2024 Order Conditions Freeboard Instantaneous Minimum limit is 24 inches and reported value was 15 inches. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142831 05/28/2024 Order Conditions Freeboard Instantaneous Minimum limit is 24 inches and reported value was 20 inches. Violation N Report Convict Lake Campground WTF 146807 95-037 N
1142830 07/15/2024 Deficient Monitoring Total monthly flows and average daily flows were not reported in Second Quarter 2024 Report. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142828 01/15/2024 Deficient Monitoring Total monthly flows and average daily flows were not reported in Fourth Quarter 2023 Report. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142827 01/15/2024 Deficient Monitoring Freeboard for Pond #1 and Pond #2 was not measured in December 2023. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142628 10/15/2023 Deficient Monitoring Total monthly flows and average daily flows were not reported in Third Quarter 2023 Report. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142627 07/15/2023 Deficient Monitoring Total monthly flows and average daily flows were not reported in Second Quarter 2023 Report. Violation None Report Convict Lake Campground WTF 146807 95-037 N
1142626 04/15/2023 Deficient Monitoring Total monthly flows and average daily flows were not reported in First Quarter 2023 Report. Violation N Report Convict Lake Campground WTF 146807 95-037 N
1142621 12/31/2022 Deficient Monitoring Freeboard for Pond #1 and Pond #2 was not measured in December 2022. Violation N Report Convict Lake Campground WTF 146807 95-037 N
1142514 07/30/2024 Late Report According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 7/30/2024 but not submitted until 8/2/2024. Violation None Report Bishop Creek Camp Ground WTF 147527 00-016 N
1142513 04/30/2024 Late Report According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 4/30/2024 but not submitted until 8/3/2024. Violation None Report Bishop Creek Camp Ground WTF 147527 00-016 N
1142512 01/30/2024 Late Report According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 1/30/2024 but not submitted until 8/3/2024. Violation None Report Bishop Creek Camp Ground WTF 147527 00-016 N
1142511 10/30/2023 Late Report According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 10/30/2023 but not submitted until 8/3/2024. Violation None Report Bishop Creek Camp Ground WTF 147527 00-016 N
1142509 07/30/2023 Late Report According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 7/30/2023 but not submitted until 8/3/2024. Violation None Report Bishop Creek Camp Ground WTF 147527 00-016 N
1142508 04/30/2023 Late Report According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 4/30/2023 but not submitted until 8/3/2024. Violation None Report Bishop Creek Camp Ground WTF 147527 00-016 N
1142507 01/30/2023 Late Report According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 1/30/2023 but not submitted until 2/3/2023. Violation None Report Bishop Creek Camp Ground WTF 147527 00-016 N
1142506 10/30/2022 Late Report According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 10/30/2022 but not submitted until 2/3/2023. Violation None Report Bishop Creek Camp Ground WTF 147527 00-016 N
1142505 07/30/2022 Late Report According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 7/30/2022 but not submitted until 8/26/2022. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1142504 04/30/2022 Late Report According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 4/30/2022 but not submitted until 8/26/2022. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1142367 03/25/2025 Sanitary Sewer Overflow/Spill/ Type: Category 1 Spill; Collection System Maintenance Failure (specify below) caused 100 gallons of sewage to spill from Gravity Mainline at Bottom of Mountain View Lane by Reversed Creek to Surface Water Violation None SSO June Lake PUD CS 301016 2022-0103-DWQ N
1142096 03/27/2025 OEV Flow Daily Discharge limit is 0.021 MGD and reported value was 0.029 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1142095 03/26/2025 OEV Flow Daily Discharge limit is 0.021 MGD and reported value was 0.0316 MGD. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1142084 01/01/2024 OEV Flow Daily Maximum limit is 0.85 MGD and reported value was 1.083 MGD. Violation None Report Eastern Sierra CSD WWTF 146485 94-024 N
1142034 10/01/2024 Deficient Monitoring Instrumentation for continual monitoring of Title 22 Compliance is offline. Violating Board Order R6V-01-41 WDR section I.B.a.- f.; C. 1-10. MRP Section E.4e. Violation N Report Edwards AFB WTF 148405 01-041 N
1142033 06/01/2024 Deficient Monitoring Failed to analyze the effluent for BOD in June 2024. Violation N Report Independence WWTF 146811 95-064 N
1142032 01/15/2025 Late Report 2024 Annual Report was due 1/15/2025, but submitted late on 4/2/2025 Violation N Report Independence WWTF 146811 95-064 N
1142031 10/15/2024 Late Report 3Q2024 quarterly report was due 10/15/2024, but submitted late on 11/1/2024 Violation N Report Independence WWTF 146811 95-064 N
1142030 07/15/2024 Late Report 2Q2024 quarterly report was due 7/15/2024, but submitted late on 9/6/2024 Violation N Report Independence WWTF 146811 95-064 N
1142029 10/01/2024 Deficient Monitoring the 15-minute holding time for pH samples was exceeded. Violating Board Order R6V-01-41 MRP Sections 1.a., b., and c. Violation N Report Edwards AFB WTF 148405 01-041 N
1142028 04/15/2024 Late Report 1Q2024 quarterly report was due 4/15/2024, but submitted late on 7/2/2024 Violation N Report Independence WWTF 146811 95-064 N
1142027 03/01/2024 Order Conditions Freeboard Instantaneous Minimum limit is 2 feet and reported value was 1.94 feet. Violation N Report Independence WWTF 146811 95-064 N
1142026 02/01/2024 Order Conditions Freeboard Instantaneous Minimum limit is 2 feet and reported value was 1.9 feet. Violation N Report Independence WWTF 146811 95-064 N
1141786 02/25/2025 Order Conditions Lysimeter RD1-01 vacuum pressure was under 70-80 centibars, both under the new proposed sampling method and prior to the implementation of the new method. Violates Board Order R6V-2016-0051, Waste Discharge Requirements, Section II.A.19. Violation None Inspection Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1141543 01/26/2025 Order Conditions Board Order No. R6V-2015-0057, Section IV. B., Standard Provisions, The Discharger must comply with the ¿Standard Provisions for Waste Discharge Requirements,¿ dated September 1, 1994, in Attachment C¿¿ Standard Provisions, 2.a., Reporitng Requirements. ¿Pursuant to California Water Code 13267(b), the Discharger shall immediately notify the Regional Water Board by telephone whenever an adverse condition occurred as a result of this discharge; written confirmation shall follow within two weeks. An adverse condition includes, but is not limited to, spills of petroleum products or toxic chemicals, or damage to control facilities that could affect compliance Violation N Inspection Boron Mine Facility 403003 R6V-2015-0057 N
1141542 01/26/2025 Order Conditions MRP, Section II.A.4.a.ii states ¿Upon detection of leachate in a previously dry LCRS that was dry during the prior week inspection (defined herein as an event), the Discharger shall immediately collect a grab sample of the leachate for the constituents of concern identified in Attachment A. Quarterly thereafter samples of the leachate in the LCRS must be sampled and analyzed for the constituents described and at the same frequency as monitoring wells, as specified in Attachment A. Violation N Inspection Boron Mine Facility 403003 R6V-2015-0057 N
1141541 01/26/2025 Order Conditions 1. Board Order No. R6V-2015-0057, Section IV. B., Standard Provisions, The Discharger must comply with the ¿Standard Provisions for Waste Discharge Requirements,¿ dated September 1, 1994, in Attachment C¿¿ Standard Provisions, 2.a., Reporitng Requirements. ¿Pursuant to California Water Code 13267(b), the Discharger shall immediately notify the Regional Water Board by telephone whenever an adverse condition occurred as a result of this discharge; written confirmation shall follow within two weeks. An adverse condition includes, but is not limited to, spills of petroleum products or toxic chemicals, or damage to control facilities that could affect compliance. USB failed to notify the Water Board immediately upon detection of moisture in the LCRS, an adverse condition that occurred as a result of this discharge to BAP 8B on multiple occasions. Violation N Inspection Boron Mine Facility 403003 R6V-2015-0057 Y
1141540 10/17/2024 Late Report The Q2 2024 monitoring report was due 7/15/2024 but was not submitted until 10/17/2024 Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 Y
1141538 10/17/2024 Late Report The Q1 2024 monitoring report was due 4/15/2024 but was not submitted until 10/17/2024 Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 Y
1141353 09/20/2023 OEV Dissolved Oxygen Instantaneous Minimum limit is 1.0 mg/L and reported value was 0.81 mg/L. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141352 07/27/2023 OEV Dissolved Oxygen Instantaneous Minimum limit is 1.0 mg/L and reported value was 0.93 mg/L. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141351 09/15/2023 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.12 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141350 08/30/2023 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 10.1 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141349 08/23/2023 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.6 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141348 08/15/2023 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.35 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141347 08/03/2023 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.66 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141344 09/06/2023 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.2 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141343 10/12/2023 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.11 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141342 10/04/2023 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.12 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141306 11/16/2023 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.22 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141304 11/08/2023 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.34 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141303 11/01/2023 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.47 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141302 10/25/2023 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.25 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1141267 05/03/2024 Late Report This report was due 10/15/2023 but was not submitted until 5/3/2024 Violation N Report June Mtn Ski Area Chalet 146723 99-035 N
1141266 05/03/2024 Late Report This report was due 4/15/2023 but was not submitted until 5/3/2024 Violation N Report June Mtn Ski Area Chalet 146723 99-035 N
1141265 05/03/2024 Late Report This report was due 10/15/2022 but was not submitted until 5/3/2024 Violation N Report June Mtn Ski Area Chalet 146723 99-035 N
1141264 02/29/2024 Late Report This report was due 4/15/2022 but was not submitted until 2/29/2024 Violation N Report June Mtn Ski Area Chalet 146723 99-035 N
1141263 12/31/2024 Late Report (1) Quarterly plant influent sampling did not include TPH, Total Phenols, Formaldehyde, Total Dissolved Solids, Semi-Volatile Organics, Volatile Organics, Ammonia, and pH during the 2024 4th quarter monitoring report. Violates Board Order R6V-2000-0054 MRP I.C. Table 1 (2) Quarterly plant effluent sampling did not include TPH, Total Dissolve Solids, Semi-volatile Organics, Volatile Organics, Ammonia, and pH in the 2024 4th quarter monitoring report. Violates Board Order R6V-2000-0054 MRP I.D.1. Table 2 Violation N Report West End Plant 140413 00-054 Y
1141262 06/27/2024 CAT1 Nitrogen, Total (as N) Monthly Maximum limit is 10 mg/L and reported value was 13.7 mg/L. Violation N Report Furn Crk Inn & Ranch Pack STP 404755 2014-0153-DWQ N
1141261 09/30/2024 Late Report (1) Quarterly plant influent sampling did not include TPH, Total Phenols, Formaldehyde, Total Dissolved Solids, Semi-Volatile Organics, Volatile Organics, Ammonia, and pH during the 2024 3rd quarter monitoring report. Violates Board Order R6V-2000-0054 MRP I.C. Table 1 (2) Quarterly plant effluent sampling did not include TPH, Total Dissolve Solids, Semi-volatile Organics, Volatile Organics, Ammonia, and pH in the 2024 3rd quarter monitoring report. Violates Board Order R6V-2000-0054 MRP I.D.1. Table 2 Violation N Report West End Plant 140413 00-054 Y
1141260 06/30/2024 Late Report (1) Quarterly plant influent sampling did not include TPH, Total Phenols, Formaldehyde, Total Dissolved Solids, Semi-Volatile Organics, Volatile Organics, Ammonia, and pH during the 2024 2nd quarter monitoring report. Violates Board Order R6V-2000-0054 MRP I.C. Table 1 (2) Quarterly plant effluent sampling did not include TPH, Total Dissolve Solids, Semi-volatile Organics, Volatile Organics, Ammonia, and pH in the 2024 2nd quarter monitoring report. Violates Board Order R6V-2000-0054 MRP I.D.1. Table 2 Violation N Report West End Plant 140413 00-054 Y
1141259 05/16/2024 CAT1 Nitrogen, Total (as N) Monthly Maximum limit is 10 mg/L and reported value was 14.1 mg/L. Violation N Report Furn Crk Inn & Ranch Pack STP 404755 2014-0153-DWQ N
1141258 12/31/2024 Late Report (1) Quarterly plant influent sampling did not include TPH, Total Dissolved Solids, Semi-Volatile Organics, Volatile Organics, Ammonia, and pH during the 2024 4th quarter monitoring report. Violates Board Order R6V-2005-0024 MRP I.C. Table 1 (2) Quarterly plant effluent sampling did not include TPH, Total Dissolve Solids, Semi-volatile Organics, Volatile Organics, Ammonia, and pH in the 2024 4th quarter monitoring report. Violates Board Order R6V-2005-0024 MRP I.D.1. Table 2 Violation N Report Argus Plant 297044 R6V-2005-0024 Y
1141257 09/30/2024 Late Report (1) Quarterly plant influent sampling did not include TPH, Total Dissolved Solids, Semi-Volatile Organics, Volatile Organics, Ammonia, and pH during the 2024 3rd quarter monitoring report. Violates Board Order R6V-2005-0024 I.C. Table 1 (2) Quarterly plant effluent sampling did not include TPH, Total Dissolve Solids, Semi-volatile Organics, Volatile Organics, Ammonia, and pH in the 2024 3rd quarter monitoring report. Violates Board Order R6V-2005-0024 I.D.1. Table 2 Violation N Report Argus Plant 297044 R6V-2005-0024 Y
1141256 06/30/2024 Late Report (1) Quarterly plant influent sampling did not include Total Dissolved Solids, Semi-Volatile Organics, Volatile Organics, Ammonia, and pH during the 2024 2nd quarter monitoring report. Violates Board Order R6V-2005-0024 I.C. Table 1 (2) Quarterly plant effluent sampling did not include Total Dissolve Solids, Semi-volatile Organics, Volatile Organics, Ammonia, and pH in the 2024 2nd quarter monitoring report. Violates Board Order R6V-2005-0024 I.D.1. Table 2 Violation N Report Argus Plant 297044 R6V-2005-0024 Y
1141255 04/25/2024 CAT1 Nitrogen, Total (as N) Monthly Maximum limit is 10 mg/L and reported value was 15.5 mg/L. Violation N Report Furn Crk Inn & Ranch Pack STP 404755 2014-0153-DWQ N
1141254 10/15/2024 Late Report The Daily evaluation of surface water sheen, with map indicating where observed was not included in the 1st half 2024 October monitoring report. Violates CAO R6V-2000-64A2 Order 2.c. Violation N Report Argus Plant 244424 R6V-2000-0064 Y
1141253 03/21/2024 CAT1 Nitrogen, Total (as N) Monthly Maximum limit is 10 mg/L and reported value was 22.4 mg/L. Violation N Report Furn Crk Inn & Ranch Pack STP 404755 2014-0153-DWQ N
1141252 02/15/2024 CAT1 Nitrogen, Total (as N) Monthly Maximum limit is 10 mg/L and reported value was 24.2 mg/L. Violation N Report Furn Crk Inn & Ranch Pack STP 404755 2014-0153-DWQ N
1141251 01/11/2024 CAT1 Nitrogen, Total (as N) Monthly Maximum limit is 10 mg/L and reported value was 23.5 mg/L. Violation N Report Furn Crk Inn & Ranch Pack STP 404755 2014-0153-DWQ N
1141250 12/14/2023 CAT1 Nitrogen, Total (as N) Monthly Maximum limit is 10 mg/L and reported value was 11.2 mg/L. Violation N Report Furn Crk Inn & Ranch Pack STP 404755 2014-0153-DWQ N
1141249 10/27/2023 CAT1 Nitrogen, Total (as N) Monthly Maximum limit is 10 mg/L and reported value was 13.5 mg/L. Violation N Report Furn Crk Inn & Ranch Pack STP 404755 2014-0153-DWQ N
1141225 08/17/2023 CAT1 Nitrogen, Total (as N) Monthly Maximum limit is 10 mg/L and reported value was 26.4 mg/L. Violation N Report Furn Crk Inn & Ranch Pack STP 404755 2014-0153-DWQ N
1141224 07/27/2023 CAT1 Nitrogen, Total (as N) Monthly Maximum limit is 10 mg/L and reported value was 14 mg/L. Violation N Report Furn Crk Inn & Ranch Pack STP 404755 2014-0153-DWQ N
1141214 06/19/2024 CAT1 Total Dissolved Solids (TDS) Monthly Average limit is 181 mg/L and reported value was 253 mg/L. Violation N Report Crystal Geyser Roxane Cabin Bar Water Bottling Plant 392194 R6V-2017-0006 N
1141213 03/13/2024 CAT1 Total Dissolved Solids (TDS) Monthly Average limit is 181 mg/L and reported value was 333 mg/L. Violation N Report Crystal Geyser Roxane Cabin Bar Water Bottling Plant 392194 R6V-2017-0006 N
1141212 02/14/2024 CAT1 Total Dissolved Solids (TDS) Monthly Average limit is 181 mg/L and reported value was 483 mg/L. Violation N Report Crystal Geyser Roxane Cabin Bar Water Bottling Plant 392194 R6V-2017-0006 N
1141211 01/17/2024 CAT1 Total Dissolved Solids (TDS) Monthly Average limit is 181 mg/L and reported value was 211 mg/L. Violation N Report Crystal Geyser Roxane Cabin Bar Water Bottling Plant 392194 R6V-2017-0006 N
1141209 11/15/2023 CAT1 Total Dissolved Solids (TDS) Monthly Average limit is 181 mg/L and reported value was 205 mg/L. Violation N Report Crystal Geyser Roxane Cabin Bar Water Bottling Plant 392194 R6V-2017-0006 Y
1141199 01/30/2024 Deficient Reporting General Provisions section e.i. ¿ e.iii. was not included in the report Violation N Report Baker WTF 147595 97-095 N
1141196 01/30/2024 Deficient Monitoring samples of the domestic wastewater to the sewage lagoon ponds were not given in the annual report Violation N Report Baker WTF 147595 97-095 N
1141190 01/30/2023 Deficient Monitoring The samples of the domestic wastewater to the sewage lagoon ponds were not reported. Violation N Report Baker WTF 147595 97-095 N
1141189 01/30/2023 Deficient Reporting General Provisions section e.i. ¿ e.iii were not given Violation N Report Baker WTF 147595 97-095 N
1141188 05/24/2023 Late Report This report was due 1/30/2023 but was not submitted until 05/24/2023. Violation N Report Baker WTF 147595 97-095 N
1141187 12/31/2023 Deficient Reporting For the annual reporting period of 2023, only January - April was submitted. December of 2023 was not submitted. Violation N Report Baker WTF 147595 97-095 N
1141186 11/30/2023 Deficient Reporting For the annual reporting period of 2023, only January - April was submitted. November of 2023 was not submitted. Violation N Report Baker WTF 147595 97-095 N
1141185 10/31/2023 Deficient Reporting For the annual reporting period of 2023, only January - April was submitted. October of 2023 was not submitted. Violation N Report Baker WTF 147595 97-095 N
1141184 09/30/2023 Deficient Reporting For the annual reporting period of 2023, only January - April was submitted. September of 2023 was not submitted. Violation N Report Baker WTF 147595 97-095 N
1141183 08/31/2023 Deficient Reporting For the annual reporting period of 2023, only January - April was submitted. August of 2023 was not submitted. Violation N Report Baker WTF 147595 97-095 N
1141182 07/31/2023 Deficient Reporting For the annual reporting period of 2023, only January - April was submitted. July of 2023 was not submitted. Violation N Report Baker WTF 147595 97-095 N
1141181 03/19/2023 OEV Flow Daily Maximum limit is 0.35 MGD and reported value was 1.012 MGD. Violation N Report Baker WTF 147595 97-095 N
1141179 03/31/2022 Deficient Monitoring March 3rd - 31st is missing flow data. Only the 1st and the 2nd have reported flow data. Violation N Report Baker WTF 147595 97-095 N
1141176 03/04/2022 OEV Flow Daily Maximum limit is 0.35 MGD and reported value was 0.0 MGD. Violation N Report Baker WTF 147595 97-095 N
1141175 03/03/2022 OEV Flow Daily Maximum limit is 0.35 MGD and reported value was 0.0 MGD. Violation N Report Baker WTF 147595 97-095 N
1141139 10/30/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.122 MGD. Violation N Report Baker WTF 147595 97-095 N
1141137 10/29/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.001 MGD. Violation N Report Baker WTF 147595 97-095 N
1141136 10/24/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.001 MGD. Violation N Report Baker WTF 147595 97-095 N
1141135 10/22/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.008 MGD. Violation N Report Baker WTF 147595 97-095 N
1141134 10/17/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.020 MGD. Violation N Report Baker WTF 147595 97-095 N
1141133 10/15/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.002 MGD. Violation N Report Baker WTF 147595 97-095 N
1141132 10/11/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.105 MGD. Violation N Report Baker WTF 147595 97-095 N
1141131 10/10/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.086 MGD. Violation N Report Baker WTF 147595 97-095 N
1141130 10/08/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.113 MGD. Violation N Report Baker WTF 147595 97-095 N
1141129 10/03/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.076 MGD. Violation N Report Baker WTF 147595 97-095 N
1141128 10/01/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.110 MGD. Violation N Report Baker WTF 147595 97-095 N
1141127 09/26/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.122 MGD. Violation N Report Baker WTF 147595 97-095 N
1141126 09/24/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.120 MGD. Violation N Report Baker WTF 147595 97-095 N
1141125 09/19/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.074 MGD. Violation N Report Baker WTF 147595 97-095 N
1141124 09/17/2024 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.078 MGD. Violation N Report Baker WTF 147595 97-095 N
1141123 09/12/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.025 MGD. Violation N Report Baker WTF 147595 97-095 N
1141122 09/10/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.108 MGD. Violation N Report Baker WTF 147595 97-095 N
1141121 09/05/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.122 MGD. Violation N Report Baker WTF 147595 97-095 N
1141120 09/03/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.222 MGD. Violation N Report Baker WTF 147595 97-095 N
1141119 08/30/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.102 MGD. Violation N Report Baker WTF 147595 97-095 N
1141118 08/27/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.120 MGD. Violation N Report Baker WTF 147595 97-095 N
1141117 08/22/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.102 MGD. Violation N Report Baker WTF 147595 97-095 N
1141116 08/21/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.106 MGD. Violation N Report Baker WTF 147595 97-095 N
1141115 08/20/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.130 MGD. Violation N Report Baker WTF 147595 97-095 N
1141114 08/15/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.103 MGD. Violation N Report Baker WTF 147595 97-095 N
1141113 08/13/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.160 MGD. Violation N Report Baker WTF 147595 97-095 N
1141112 08/07/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.106 MGD. Violation N Report Baker WTF 147595 97-095 N
1141111 08/05/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.120 MGD. Violation N Report Baker WTF 147595 97-095 N
1141110 08/02/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.07 MGD. Violation N Report Baker WTF 147595 97-095 N
1141078 07/27/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.120 MGD. Violation N Report Baker WTF 147595 97-095 N
1141077 07/25/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.103 MGD. Violation N Report Baker WTF 147595 97-095 N
1141076 07/18/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.102 MGD. Violation N Report Baker WTF 147595 97-095 N
1141075 07/11/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.105 MGD. Violation N Report Baker WTF 147595 97-095 N
1141074 07/04/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.103 MGD. Violation N Report Baker WTF 147595 97-095 N
1141073 06/30/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.022 MGD. Violation N Report Baker WTF 147595 97-095 N
1141072 06/28/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.080 MGD. Violation N Report Baker WTF 147595 97-095 N
1141070 06/23/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.064 MGD. Violation N Report Baker WTF 147595 97-095 N
1141068 06/21/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.003 MGD. Violation N Report Baker WTF 147595 97-095 N
1141067 06/16/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.003 MGD. Violation N Report Baker WTF 147595 97-095 N
1141065 06/14/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.069 MGD. Violation N Report Baker WTF 147595 97-095 N
1141064 06/09/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.162 MGD. Violation N Report Baker WTF 147595 97-095 N
1141063 06/07/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.056 MGD. Violation N Report Baker WTF 147595 97-095 N
1141062 05/29/2022 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.023 MGD. Violation N Report Baker WTF 147595 97-095 N
1141061 09/06/2022 Deficient Reporting General Provisions section e.i-iii were not met Violation N Report Baker WTF 147595 97-095 N
1140994 09/06/2022 Deficient Monitoring samples of the domestic wastewater to the sewage lagoon ponds were not given in the annual report Violation N Report Baker WTF 147595 97-095 N
1140993 09/06/2022 Late Report This report was due 1/30/2022 but was not submitted until 9/6/2022 Violation N Report Baker WTF 147595 97-095 N
1140992 05/22/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.750 MGD. Violation N Report Baker WTF 147595 97-095 N
1140991 05/21/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.893 MGD. Violation N Report Baker WTF 147595 97-095 N
1140990 05/20/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.026 MGD. Violation N Report Baker WTF 147595 97-095 N
1140989 05/19/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.919 MGD. Violation N Report Baker WTF 147595 97-095 N
1140988 05/17/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.712 MGD. Violation N Report Baker WTF 147595 97-095 N
1140987 05/16/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.797 MGD. Violation N Report Baker WTF 147595 97-095 N
1140986 05/14/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.644 MGD. Violation N Report Baker WTF 147595 97-095 N
1140985 05/12/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.525 MGD. Violation N Report Baker WTF 147595 97-095 N
1140984 04/27/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.973 MGD. Violation N Report Baker WTF 147595 97-095 N
1140983 04/24/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.801 MGD. Violation N Report Baker WTF 147595 97-095 N
1140982 04/23/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.923 MGD. Violation N Report Baker WTF 147595 97-095 N
1140981 04/22/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.582 MGD. Violation N Report Baker WTF 147595 97-095 N
1140976 04/21/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.042 MGD. Violation N Report Baker WTF 147595 97-095 N
1140975 04/20/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.0 MGD. Violation N Report Baker WTF 147595 97-095 N
1140974 04/19/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.699 MGD. Violation N Report Baker WTF 147595 97-095 N
1140973 04/18/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.780 MGD. Violation N Report Baker WTF 147595 97-095 N
1140971 04/17/2021 OEV Flow Daily Maximum limit is 0.52 MGM and reported value was 0.816 MGM. Violation N Report Baker WTF 147595 97-095 N
1140970 04/16/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 1.726 MGD. Violation N Report Baker WTF 147595 97-095 N
1140968 04/15/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.737 MGD. Violation N Report Baker WTF 147595 97-095 N
1140967 04/14/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.729 MGD. Violation N Report Baker WTF 147595 97-095 N
1140965 04/12/2021 OEV Flow Daily Maximum limit is 0.52 MGD and reported value was 0.525 MGD. Violation N Report Baker WTF 147595 97-095 N
1140964 03/18/2021 OEV Flow Daily Maximum limit is 0.35 MGD and reported value was 0.737 MGD. Violation N Report Baker WTF 147595 97-095 N
1140962 03/17/2021 OEV Flow Daily Maximum limit is 0.35 MGD and reported value was 0.533 MGD. Violation N Report Baker WTF 147595 97-095 N
1140960 03/12/2021 OEV Flow Daily Maximum limit is 0.35 MGD and reported value was 0.470 MGD. Violation N Report Baker WTF 147595 97-095 N
1140959 03/08/2021 OEV Flow Daily Maximum limit is 0.35 MGD and reported value was 0.533 MGD. Violation N Report Baker WTF 147595 97-095 N
1140949 03/07/2021 OEV Flow Daily Maximum limit is 0.35 MGD and reported value was 0.607 MGD. Violation N Report Baker WTF 147595 97-095 N
1140948 03/06/2021 OEV Flow Daily Maximum limit is 0.35 MGD and reported value was 0.576 MGD. Violation N Report Baker WTF 147595 97-095 N
1140947 03/05/2021 OEV Flow Daily Maximum limit is 0.35 MGD and reported value was 0.657 MGD. Violation N Report Baker WTF 147595 97-095 N
1140946 02/25/2021 OEV Flow Daily Maximum limit is 0.35 MGD and reported value was 0.395 MGD. Violation N Report Baker WTF 147595 97-095 N
1140766 02/25/2025 Unauthorized Discharge Windblown litter outside of the fence along the east side of the property. Violates Board Order No. R6V-2016-0051, Waste Discharge Requirements, Section II. A. 5. Violation None Inspection Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1140750 11/25/2024 Late Report Report due 11/15/24; received in Geotracker 1/4/25. and via email 1/7/25. Violation N Report Green Valley Foods 383647 R6V-2012-0006 N
1140479 07/01/2024 Deficient Monitoring All analyses shall be performed in accordance with the current edition(s) of the following documents: i. ii. Standard Methods for the Examination of Water and Wastewater Methods for Chemical Analysis of Water and Wastes. Violating WDR R6V-99033 General Provisions Section 1.a.,b.,c.. Violation N Report Airforce Research Lab STP 146721 99-033 N
1140477 08/02/2024 Deficient Monitoring failed to provide parameters related to flow monitoring. Violating board order WDR R6V-99-033 MRP Section I.A.1 Violation N Report Airforce Research Lab STP 146721 99-033 N
1140476 07/01/2024 Deficient Monitoring eight-hour composite samples of the effluent from the Facility shall be collected and analyzed to determine the magnitude of the effluent parameters. Violating WDR R6V-99033 Section MRP I.B.1. Violation N Report Airforce Research Lab STP 146721 99-033 N
1140139 04/09/2024 Groundwater Exceeded the CUSUM limit of Boron, Carbonate Alkalinity as CACO3, Chloroform, and Iron during the 1st half 2024 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140138 02/28/2024 Deficient Monitoring (1) Unsaturated zone soil moisture exceeded upper tolerance limits. Violates Board Order R6V-2015-0057 MRP II.A.5.b. (2) Soil moisture data for the VZ-05-05, VZ-05-10, VZ-05-15, VZ-05-20, VZ-05-25, VZ-05-30 were not included. Violates Board Order R6V-2015-0057 MRP II.A.5.b. (3) Soil moisture probes VZ-41-05, VZ-42-05, VZ-42-15, VZ-45-05 have no Upper Tolerance Limits listed in the monitoring report. Violates Board Order R6V-2015-0057 MRP II.A.5.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140137 06/30/2024 Order Conditions (1) Failure to maintain groundwater well 3M-71 during the 1st half 2024 monitoring period. Violates Board Order R6V-2015-0057 WDR II.A.14. (2) Failure to maintain Soil Moisture TDT Sensors VMS-08-1-20, VMS-08-2-30, VMS-26-1-20, VMS-26-2-30, VMS-34-1-20, VMS-34-2-30, VMS-35-1-20, VMS-35-2-30, VMS-36-1-20, VMS-36-2-30, VMS-27-1-20, and VMS-27-2-30 during the 2nd half 2023 monitoring period. Violates Board Order R6V-2015-0057 WDR II.A.14. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140136 03/06/2023 Deficient Monitoring Unsaturated zone soil moisture exceeded upper tolerance limits. Violates Board Order R6V-2015-0057 MRP II.A.5.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140135 03/27/2023 Groundwater Exceeded the CUSUM limit of Antimony, Carbonate Alkalinity as CACO3, Chloroform, Fluoride, and Iron during the 1st half 2023 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140134 06/30/2023 Order Conditions (1) Failure to maintain groundwater well 3M-71 during the 1st half 2023 monitoring period. Violates Board Order R6V-2015-0057 WDR II.A.14. (2) Failure to maintain Soil Moisture TDT Sensors VMS-08-1-20 and VMS-08-2-30 during the 1st half 2023 monitoring period. Violates Board Order R6V-2015-0057 WDR II.A.14. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140133 01/31/2023 Deficient Monitoring (1) List of all monitoring pairs that have exhibited a verified measurably significant increase was not included. Violates Board Order R6V-2015-0057 MRP IV.3.a. (2) Wastewater average daily flow, volume of flow, and cumulative flow to each surface impoundment was not reported. Violates Board Order R6V-2015-0057 MRP II.A.1.b-d Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140132 09/20/2023 Deficient Monitoring (1) Unsaturated zone soil moisture exceeded upper tolerance limits. Violates Board Order R6V-2015-0057 MRP II.A.5.b. (2) Soil moisture data for the 2023 4th quarter was not collected. Violates Board Order R6V-2015-0057 MRP II.A.5.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140129 08/03/2023 Groundwater Exceeded the CUSUM limit of Arsenic and Chloroform during the 2nd half 2023 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1140128 12/31/2023 Order Conditions (1) Failure to maintain groundwater well 3M-71 during the 2nd half 2023 monitoring period. Violates Board Order R6V-2015-0057 WDR II.A.14. (2) Failure to maintain Soil Moisture TDT Sensors VMS-08-1-20 and VMS-08-2-30 during the 2nd half 2023 monitoring period. Violates Board Order R6V-2015-0057 WDR II.A.14. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 N
1139771 01/21/2025 Deficient Monitoring Lysimeter B01-01 failed to hold vacuum during sampling, both under the new proposed sampling method and prior to the implementation of the new method. Violates Board Order R6V-2016-0004, Waste Discharge Requirements, Section II.A.15. Violation None Inspection Boron Class III Landfill 404752 R6V-2016-0004 Y
1139767 01/21/2025 Unauthorized Discharge Discharge of windblown litter around perimeter fencing. Violates Board Order R6V-2016-0004, Waste Discharge Requirements, Section II.A.4. Violation None Inspection Boron Class III Landfill 404752 R6V-2016-0004 Y
1139211 04/30/2024 Order Conditions Freeboard Instantaneous Minimum limit is 24 inches and reported value was 20 inches. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1139210 06/30/2024 Deficient Reporting The total volume of wastewater flow to the facility for each day and maximum instantaneous flow rate occurring each day were not reported. Total monthly flow and average daily flow were also not reported in April 2024; No samples were analyzed in April 2024; Semi-annual constituents were not analyzed. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1139209 03/30/2024 Deficient Reporting The total volume of wastewater flow to the facility for each day, total volume of wastewater flow to the facility for each month, maximum instantaneous flow rate occurring each day, and the average flow rate of wastewater flow to the facility for each month were not reported; No samples were analyzed in January 2024, February 2024, and March 2024; Semi-annual constituents were not analyzed. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1139208 12/30/2023 Deficient Reporting The total volume of wastewater flow to the facility for each day, total volume of wastewater flow to the facility for each month, maximum instantaneous flow rate occurring each day, and the average flow rate of wastewater flow to the facility for each month were not reported; No samples were analyzed in October 2023, November 2023, and December 2023. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1139207 09/30/2023 Deficient Reporting The total volume of wastewater flow to the facility for each day, total volume of wastewater flow to the facility for each month, maximum instantaneous flow rate occurring each day, the average flow rate of wastewater flow to the facility for each month, and pond freeboard were not reported; No samples were analyzed in July 2023, August 2023, and September 2023; Semi-annual and summer annual constituents were not analyzed. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1139085 06/30/2023 Deficient Reporting The total volume of wastewater flow to the facility for each day, total volume of wastewater flow to the facility for each month, maximum instantaneous flow rate occurring each day, and the average flow rate of wastewater flow to the facility for each month were not reported. Pond freeboard were also not reported in April 2023; No samples were analyzed in April 2023 and May 2023; Dissolved Oxygen was not analyzed. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1139084 03/30/2023 Deficient Reporting The total volume of wastewater flow to the facility for each day, total volume of wastewater flow to the facility for each month, maximum instantaneous flow rate occurring each day, and the average flow rate of wastewater flow to the facility for each month were not reported; No samples were analyzed in January 2023, February 2023, and March 2023; Semi-annual constituents were not analyzed. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1139083 10/25/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 30-Day Average limit is 30 mg/L and reported value was 61 mg/L. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1139082 12/30/2022 Deficient Reporting The total volume of wastewater flow to the facility for each day and maximum instantaneous flow rate occurring each day were not reported; No samples were analyzed in November 2022 and December 2022; pH and Dissolved Oxygen were not analyzed. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1139081 09/08/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 30-Day Average limit is 30 mg/L and reported value was 100 mg/L. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1139080 08/19/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 30-Day Average limit is 30 mg/L and reported value was 34 mg/L. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1139077 09/30/2022 Deficient Reporting The total volume of wastewater flow to the facility for each day and maximum instantaneous flow rate occurring each day were not reported; No samples were analyzed in August 2022; pH and Dissolved Oxygen were not analyzed; Semi-annual and summer annual constituents were not analyzed. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1139076 06/30/2022 Deficient Reporting The total volume of wastewater flow to the facility for each day and maximum instantaneous flow rate occurring each day were not reported. Total monthly flow, average daily flow, and pond freeboard were also not reported for the month April; pH and Dissolved Oxygen were not analyzed. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1138645 12/10/2024 Late Report Draft 2Q24 domestic well sampling report received 9/23/24; revised report requested orally in meeting 9/26/24 and in 12/10/24 email. Revised report not received as of 1/7/25. Reports required per Stipulated Agreement dated July 2017. Violation N Report Green Valley Foods 416725 None N
1138182 04/01/2024 Deficient Monitoring All analyses shall be performed in accordance with the current edition(s) of the following documents: i. ii. Standard Methods for the Examination of Water and Wastewater Methods for Chemical Analysis of Water and Wastes. Violating WDR R6V-99033 General Provisions Section 1.a.,b.,c., Violation N Report Airforce Research Lab STP 146721 99-033 N
1138178 01/01/2024 Deficient Monitoring All analyses shall be performed in accordance with the current edition(s) of the following documents: i. ii. Standard Methods for the Examination of Water and Wastewater Methods for Chemical Analysis of Water and Wastes. Violating WDR R6V-99033 General Provisions Section 1.a.,b.,c., Violation N Report Airforce Research Lab STP 146721 99-033 N
1137701 07/15/2024 Deficient Monitoring Q2 2024 Samples were not collected and report submitted late without data. Violation N Report Fort Cady Borate 146400 88-063 Y
1137700 04/15/2024 Late Report Q1 2024 Report was submitted late Violation None Report Fort Cady Borate 146400 88-063 Y
1137699 07/15/2023 Late Report Q2 2023 Report was submitted late Violation None Report Fort Cady Borate 146400 88-063 Y
1137695 04/15/2024 Deficient Monitoring Q1 2024 Required sampling was not performed. Violation None Report Fort Cady Borate 146400 88-063 Y
1137154 12/10/2024 Late Report SEL email sent 12/10/24 re late report violation (Sept 2024 report was due 10/15/24; submitted to geotracker 10/28/24). SEL states the October 2024 report has not been received, was due 11/15 and is also now overdue. Violation N Report Green Valley Foods 383647 R6V-2012-0006 N
1137108 10/20/2024 Unauthorized Discharge Spill occurred on October 20, 2024. The spill volume ranged between 15,000 to 20,000 gallons. Spill did not exit the wastewater treatment plant facility. See attached NOV letter. Violation N Complaint Furn Crk Inn & Ranch Pack STP 404755 2014-0153-DWQ Y
1136855 09/30/2024 Deficient Monitoring Sampling for Q3 2024 not performed Violation N Report NuWay Former Dry Cleaners 450938 R6-2022-0020 Y
1136465 11/21/2024 Late Report Report 2 30-day periods late Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136463 11/21/2024 Late Report Report 5 30-day period late Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136458 11/21/2024 Late Report Report 8 30-day period late Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136451 11/21/2024 Late Report Report 12 30-day periods late Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136447 11/21/2024 Late Report Report 15 30-day periods late Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136440 11/21/2024 Late Report Report 18 30-day periods late Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136437 11/21/2024 Late Report Report 22 30-day periods late as of 11/21/2024 Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136436 11/21/2024 Late Report Report 25 30-day periods late as of 11/21/2024 Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136435 11/21/2024 Late Report Report 28 30-day periods late as of 11/21/2024 Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136420 11/21/2024 Late Report Late for 31 30-day periods as of 11/21/2024 Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136180 09/30/2024 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 13 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136179 09/30/2024 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 12.0 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136178 06/30/2024 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 12.001 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136177 06/30/2024 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value was 12 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136176 03/31/2024 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value was 12 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136174 03/31/2024 CAT2 Tetrachloroethene Monthly Maximum limit is 0.5 ug/L and reported value was 1.41 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136173 03/31/2024 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value was 12 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136172 03/31/2024 CAT2 Tetrachloroethene Monthly Maximum limit is 0.5 ug/L and reported value was 1.4 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136171 12/31/2023 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 12.01 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136170 12/31/2023 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value was 12 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136169 09/30/2023 CAT2 Chromium (VI) Monthly Maximum limit is 5.5 ug/L and reported value was 7.2 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136168 09/30/2023 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value was 16 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136167 09/30/2023 CAT2 Trichloroethene Monthly Maximum limit is 0.5 ug/L and reported value was 1.3 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136166 09/30/2023 CAT2 cis-1,2-Dichloroethene Monthly Maximum limit is 0.5 ug/L and reported value was 5.6 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136165 09/30/2023 CAT2 Tetrachloroethene Monthly Maximum limit is 0.5 ug/L and reported value was 5 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136164 09/30/2023 CAT2 Lead, Total Recoverable Monthly Maximum limit is 0.5 ug/L and reported value was 2.4 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136163 09/30/2023 CAT2 Chromium (VI) Monthly Maximum limit is 5.5 ug/L and reported value was 7.6 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136162 09/30/2023 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value was 17 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136161 09/06/2023 CAT2 Tetrachloroethene Daily Maximum limit is 1.6 ug/L and reported value was 5 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136160 06/30/2023 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 12.01 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136159 06/30/2023 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 12 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136158 03/31/2023 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 82 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136157 03/31/2023 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value was 13 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136150 03/27/2023 CAT2 Lead, Total Recoverable Monthly Maximum limit is 3.2 ug/L and reported value was 130 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136149 12/31/2022 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 12.1 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 N
1136148 12/31/2022 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 12 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136145 09/30/2022 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value was 11 ug/L. *** MMP Exempt Reason:Does not exceed 20% Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136144 09/30/2022 CAT2 Chromium (VI) Monthly Maximum limit is 5.5 ug/L and reported value was 6.8 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136142 09/30/2022 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value was 12 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136139 09/21/2022 OEV TPH C13-C22 Daily Maximum limit is 50 ug/L and reported value was 230 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136138 06/30/2022 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value was 12 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136133 06/30/2022 OEV TPH C13-C22 Daily Maximum limit is 50.0 ug/L and reported value was 160.0 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136131 06/09/2022 OEV TPH C13-C22 Daily Maximum limit is 50 ug/L and reported value was 170 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136126 06/09/2022 OEV TPH C13-C22 Daily Maximum limit is 50.0 ug/L and reported value was 160.0 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136125 06/09/2022 CAT1 Nitrate, Total (as N) Daily Maximum limit is 10.0 mg/L and reported value was 12.0 mg/L. Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136123 03/31/2022 CAT2 Chromium (VI) Monthly Maximum limit is 5.5 ug/L and reported value was 11.3 ug/L. Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136079 03/31/2022 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 13 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136078 03/31/2022 CAT2 Chromium (VI) Monthly Maximum limit is 10 ug/L and reported value was 12 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136077 03/31/2022 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 12.0 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136076 03/17/2022 CAT2 Chromium (VI) Daily Maximum limit is 11.0 ug/L and reported value was 11.3 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136075 03/17/2022 CAT2 Chromium (VI) Daily Maximum limit is 11 ug/L and reported value was 12.1 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136074 12/31/2021 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 12 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136073 12/31/2021 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 14 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136072 09/30/2021 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 11.6 ug/L. *** MMP Exempt Reason:Does not exceed 120% Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136071 09/30/2021 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 11.4 ug/L. *** MMP Exempt Reason:Does not exceed 120% Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136070 06/30/2021 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 15.3 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136069 03/31/2021 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value was 15.6 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136068 03/31/2021 CAT2 Chromium (VI) Monthly Maximum limit is 5.5 ug/L and reported value was 20 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136067 03/31/2021 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value was 12 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136066 03/31/2021 CAT2 Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value was 13 ug/L. Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136065 03/31/2021 CAT2 Chromium (VI) Monthly Maximum limit is 5.5 ug/L and reported value was 13 ug/L. Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136064 03/31/2021 CAT2 cis-1,2-Dichloroethene Monthly Maximum limit is 0.5 ug/L and reported value was 2.76 ug/L. Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136063 03/31/2021 CAT2 Tetrachloroethene Monthly Maximum limit is 0.5 ug/L and reported value was 1.68 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136062 03/18/2021 CAT2 Tetrachloroethene Daily Maximum limit is 1.60 ug/L and reported value was 1.68 ug/L. *** MMP Exempt Reason:Does not exceed 120% Violation N Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136061 03/18/2021 CAT2 Chromium (VI) Daily Maximum limit is 11.0 ug/L and reported value was 20 ug/L. Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1136060 03/18/2021 CAT2 Chromium (VI) Daily Maximum limit is 11 ug/L and reported value was 13 ug/L. *** MMP Exempt Reason:Does not exceed over 20% Violation None Report Plant GW Treatment System - National Cement 445491 R6T-2016-0011 Y
1135722 01/01/2024 Deficient Reporting Failed to report annually in tabular and graphical form to show trends in water quality and failed to submit data electronically to GeoTracker. Violation of Board Order No. 6-98-74, MRP section I D 2 c, and Title 23 CCR. Violation N Report Segs 8&9 Three Surface Impoundments & Land Treatment Unit 146719 98-074 Y
1135714 06/30/2024 Deficient Monitoring Failed to sample required wells, determine direction of flow and gradient, and measure moisture below the ponds during 2024 1st Semiannual Monitoring Reporting period. Violation of Board Order No. 6-98-74, MRP section I D 2 a. Violation N Report Segs 8&9 Three Surface Impoundments & Land Treatment Unit 146719 98-074 Y
1135572 10/24/2024 Order Conditions Trash/litter observed out of containment, Violated BO 6-01-34, Section II.A.1 and 2 Violation None Inspection Bishop(Sunland)Class III LF 148395 01-034 N
1134817 10/17/2024 Basin Plan Prohibition Discharges of hazardous materials, R6 BPP#3 Violation None Inspection Arturo Medina Property 448121 None Y
1134816 10/17/2024 Other Codes Illicit cannabis cultivation w/o enrollment (WC violation 13260), discharges of wastes affecting WOS (WC violation 13264) Violation None Inspection Arturo Medina Property 448121 None Y
1134607 09/26/2024 Order Conditions Water Board staff observed standing water in a corral flowing from a drinking water trough. The observed water stream did not flow towards the concrete channel that allows storm water and liquid manure to flow to the storm water impoundment; rather, the stream flowed away from the channel and towards the inside of the corral. This standing water threatens the potential to percolate to groundwater. Board Order No. 6-96-9, section No. I.C.6., states that, ?Manured areas shall be managed to minimize infiltration of water into underlying soils.? Violation None Inspection Desert Oasis Dairy 146874 96-009 Y
1134605 09/26/2024 Order Conditions Wastewater surrounding sump pump #2. The area requires maintenance to assess the integrity of the tank. During the inspection, staff observed a possible broken tank or broken piping, within overgrown and saturated grass, in standing water. Board Order No. 6-96-9, section No. I.C.1., states that ?Surface flow or visible discharge of manure at, or from, the authorized disposal site to adjacent land areas or surface waters is prohibited.? Violation None Inspection Desert Oasis Dairy 146874 96-009 Y
1134446 09/09/2024 Unauthorized Discharge Soil Safe is in violation for failure to obtain a 401 certification or dredge and fill permit, for the discharged soil into ephemeral washes, waters of the state. Should any additional work to be performed in this area or within the City of Adelanto, the landowners will be required to inquire on 401 certification or dredge and fill permitting. Additionally, a Construction Stormwater General Permit, Order WQ 2022-0057-DWQ, is required for construction projects greater than an acre, total disturbance area. Violation None Complaint Mojave Drive west of Fremontia Road 458757 None Y
1134397 04/17/2023 Order Conditions The total influent flow of wastewater to the existing DWTF and upgraded DWTF during a 24-hour period shall not exceed 0.20 and 0.18 million gallons, respectively, violating board order R6V-06-01-42, WDR section I.A.1. Violation N Report Yermo Domestic WTF 148406 01-042 N
1132813 04/15/2023 Late Report Monitoring Report for Q1 2023 was submitted late Violation None Report Fort Cady Borate 146400 88-063 Y
1132812 07/15/2022 Late Report Monitoring Report for Q2 2022 was submitted late Violation None Report Fort Cady Borate 146400 88-063 Y
1132811 10/15/2021 Late Report Monitoring Report for Q3 2021 was submitted late Violation None Report Fort Cady Borate 146400 88-063 Y
1132809 04/15/2021 Late Report Monitoring Report for Q1 2021 was submitted late Violation None Report Fort Cady Borate 146400 88-063 Y
1132808 04/15/2024 Deficient Reporting Q1 2024 Monitoring Report never submitted, no data available Violation None Report Fort Cady Borate 146400 88-063 Y
1132807 01/15/2024 Deficient Reporting Q4 2023 Monitoring Report never submitted, no data available Violation None Report Fort Cady Borate 146400 88-063 Y
1132806 10/15/2023 Deficient Reporting Q3 2023 Monitoring Report never submitted, no data available Violation None Report Fort Cady Borate 146400 88-063 Y
1132805 10/15/2020 Deficient Reporting Q3 2020 Monitoring Report never submitted, no data available Violation N Report Fort Cady Borate 146400 88-063 Y
1132804 01/15/2021 Late Report Monitoring Report for Q4 2020 was submitted late Violation None Report Fort Cady Borate 146400 88-063 Y
1131742 08/28/2024 Sanitary Sewer Overflow/Spill/ Type: Category 1 Spill; Root Intrusion caused 457 gallons of sewage to spill from Gravity Mainline,Manhole at Dill Apartment Spill to Drainage Conveyance System that discharges to surface water Violation None SSO Barstow CS 301313 2022-0103-DWQ N
1131720 08/20/2024 Sanitary Sewer Overflow/Spill/ Type: Category 1 Spill; Debris from Construction,Damage by Others Not Related to Collection System Construction/Maintenance caused 5130 gallons of sewage to spill from Gravity Mainline,Manhole at 19 Willow to Surface Water Violation None SSO June Lake PUD CS 301016 2022-0103-DWQ N
1131592 09/04/2024 Order Conditions Violation of BO 6-91-95 Section, I.D.1 Violation None Inspection Soil Safe-Adelanto Soil Recycling Center 146138 91-935 Y
1131541 08/20/2024 Sanitary Sewer Overflow/Spill/ Type: Category 1 Spill; Damage by Others Not Related to Collection System Construction/Maintenance,Debris from Construction caused 5130 gallons of sewage to spill from Manhole,Gravity Mainline at 19 Willow to Surface Water Violation None SSO June Lake PUD CS 301016 2022-0103-DWQ N
1131504 08/20/2024 Sanitary Sewer Overflow/Spill/ Type: Category 1 Spill; Damage by Others Not Related to Collection System Construction/Maintenance,Debris from Construction caused 5130 gallons of sewage to spill from Manhole,Gravity Mainline at 19 Willow to Surface Water Violation None SSO June Lake PUD CS 301016 2022-0103-DWQ N
1131257 04/24/2024 Surface Water General requirements and Prohibitions, there shall be no discharge, grease, or oils from the facilities to adjacent land areas or surface waters. Neither the treatment nor the discharge shall cause a nuisance as defined in Section 13050 of the California Water Code. Violating board order R6V-99-033 WDR section I.C.1&5 Violation N Report Airforce Research Lab STP 146721 99-033 N
1131256 04/17/2024 Deficient Monitoring Eight-hour composite samples of the effluent from the Facility shall be collected and analyzed to determine the magnitude of the effluent parameters. Violating WDR R6V-99033 Section MRP I.B.1. Violation N Report Airforce Research Lab STP 146721 99-033 N
1131254 04/01/2024 Deficient Monitoring Failed to provide results for several parameters related to flow monitoring. Violating Board order- R6V-99-033 sections MRP A. Facility Flow Monitoring 1. 2. 3. 4. 5. 6. Violation N Report Airforce Research Lab STP 146721 99-033 N
1131252 01/16/2024 Groundwater Exceeded Primary MCL¿s and SMCL¿s for the following constituents. Arsenic (0.010mg/L), Chromium (0.05mg/L), Chloride(250/500mg/L), Nitrate (as N) (10mg/L), Sulfate (250/500mg/L), Total Dissolved Solids (1000mg/L), Iron (0.3 mg/L), Nickel (0.1 mg/L), Selenium (0.001mg/L) Violating Board Order RV6-2002-0019 Section 2. B.1. d. Violation N Report Main Base Class III Landfill 132096 R6V-2002-0019 N
1131249 01/24/2024 Deficient Monitoring Eight-hour composite samples of the effluent from the Facility shall be collected and analyzed to determine the magnitude of the effluent parameters. Violating WDR R6V-99033 Section MRP I.B.1. Violation N Report Airforce Research Lab STP 146721 99-033 N
1131248 01/24/2024 Order Conditions The 15-minute holding time for pH samples was exceeded. Violating Board Order R6V-01-41 sections Violation N Report Edwards AFB WTF 148405 01-041 N
1131247 01/01/2024 Deficient Monitoring Title 22 Recycled Water Monitoring Failure Instrumentation for continual monitoring of Title 22 Compliance is offline. Violation N Report Edwards AFB WTF 148405 01-041 N
1131200 08/28/2023 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0051 MRP II.A.2.c. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1131199 08/30/2023 Groundwater Exceeded WQPS Calcium, Dichlorodifluoromethane, Hardness as CaCO3, Magnesium, Nitrogen, Nitrate (as N), Tetrachloroethene (PCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0051 MRP I.C.1.a. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1131198 03/13/2023 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0051 MRP II.A.2.c. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1131196 03/20/2023 Groundwater Exceeded WQPS Alkalinity as CaCO3, Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0051 MRP I.C.1.a. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1131194 09/15/2022 Groundwater Exceeded WQPS Dichlorodifluoromethane, Nitrogen, Nitrate (as N), Tetrachloroethene (PCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0051 MRP I.C.1.a. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1131193 02/15/2022 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0051 MRP II.A.2.c. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1131192 03/03/2022 Groundwater Exceeded WQPS Arsenic, Beryllium, Copper, Dichlorodifluoromethane, Mercury, Nickel, Nitrogen, Nitrate (as N), Tetrachloroethene (PCE), Tin, and Trichlorofluoromethane. Violates Board Order R6V-2016-0051 MRP I.C.1.a. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1131191 08/25/2021 Deficient Monitoring Lysimeter field sheet not included for the 2021 H2 monitoring period. Violates Board Order R6V-2016-0051 MRP II.A.2.c. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1131190 08/25/2021 Groundwater Exceeded WQPS Magnesium, Nitrogen, Nitrate (as N), Tetrachloroethene (PCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0051 MRP I.C.1.a. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1131189 02/11/2021 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0051 MRP II.A.2.c. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1131188 02/11/2021 Groundwater Exceeded WQPS Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0051 MRP I.C.1.a. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1131187 07/21/2020 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0051 MRP II.A.2.c. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1131186 07/22/2020 Groundwater Exceeded WQPS Chloride, Tetrachloroethene (PCE), and Total Dissolved Solids. Violates Board Order R6V-2016-0051 MRP I.C.1.a. Violation N Report Ridgecrest/Inyokern Landfill 409535 R6V-2016-0051 Y
1130098 11/03/2023 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0032 MRP II.A.2.c. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1130097 11/07/2023 Groundwater Exceeded WQPS of 1,1-Dichloroethane, 1,2-Dichloropropane, 1,4-Dichlorobenzene, Bicarbonate as HCO3, Calcium, Chloride, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Magnesium, Methylene chloride, Sodium, Tetrachloroethene (PCE), Trichloroethene (TCE), Trichlorofluoromethane. Violates Board Order R6V-2016-0032 MRP I.C. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1130096 05/24/2023 Deficient Monitoring Lysimeter field sheet not completed for the 2023 H1 monitoring period. Violates Board Order R6V-2016-0051 MRP II.A.2.c. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1130095 05/24/2023 Groundwater Exceeded WQPS of 1,1-Dichloroethane, 1,4-Dichlorobenzene, Bicarbonate as HCO3, Calcium, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Magnesium, Methylene chloride, Sodium, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0032 MRP I.C. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1130089 11/07/2022 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0032 MRP II.A.2.c. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1130088 11/09/2022 Groundwater Exceeded WQPS of 1,1-Dichloroethane, 1,4-Dichlorobenzene, Bicarbonate as HCO3, Calcium, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Magnesium, Methylene chloride, Sodium, and Tetrachloroethene (PCE). Violates Board Order R6V-2016-0032 MRP I.C. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1130087 05/03/2022 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0032 MRP II.A.2.c. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1130086 05/03/2022 Groundwater Exceeded WQPS of 1,1-Dichloroethane, 1,1-Dichloroethene, 1,4-Dichlorobenzene, 3-Methylphenol/4-Methylphenol Coelution, Arsenic, Barium, Bicarbonate as HCO3, Calcium, Chloroform, Chromium, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Magnesium, Mercury, Methylene chloride, Selenium, Sodium, Sulfate, Tetrachloroethene (PCE), Tin, Trichloroethene (TCE), Trichlorofluoromethane, and Vanadium. Violates Board Order R6V-2016-0032 MRP I.C. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1130069 11/04/2021 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0032 MRP II.A.2.c. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1129936 11/08/2021 Groundwater Exceeded 1,1-Dichloroethane, 1,1-Dichloroethene, 1,4-Dichlorobenzene, Bicarbonate as HCO3, Calcium, Chloroform, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Magnesium, Methylene chloride, Sodium, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0032 MRP I.C. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1129935 05/06/2021 Deficient Monitoring Lysimeter Field Data not included. Violates Board Order R6V-2016-0032 MRP II.A.2.c. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1129934 05/06/2021 Groundwater Exceeded WQPS of 1,1-Dichloroethane, 1,1-Dichloroethene, 1,2-Dichlorobenzene, 1,2-Dichloropropane, 1,4-Dichlorobenzene, Chloroform, Chromium, Hexavalent, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methylene chloride, Sulfate, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0032 MRP I.C. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1129929 12/14/2020 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0032 MRP II.A.2.c. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1129928 12/16/2020 Groundwater Violation Description: Exceeded WQPS of 1,1-Dichloroethane, 1,2-Dichloropropane, 1,4-Dichlorobenzene, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0032 MRP I.C. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1129912 06/01/2020 Deficient Monitoring Lysimeters not monitored during the 2020 H1 monitoring period. Violates Board Order R6V-2016-0032 MRP II.A.2.c. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1129911 06/01/2020 Groundwater Exceeded WQPS of 1,1-Dichloroethane, 1,4-Dichlorobenzene, Hexavalent Chromium, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0032 MRP I.C. Violation N Report Tehachapi Class III Landfill 406828 R6V-2016-0032 Y
1128884 08/14/2023 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. Violation N Report Boron Class III Landfill 404752 R6V-2016-0004 Y
1128883 06/15/2023 Groundwater Exceeded WQPS of Calcium, Hardness as CaCO3, Sodium during the 2022 2nd half Semiannual monitoring period. Violates Board Order R6V-2016-0004 WDR III.D.2 Violation N Report Boron Class III Landfill 404752 R6V-2016-0004 Y
1128882 03/30/2023 Groundwater Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. Violation N Report Boron Class III Landfill 404752 R6V-2016-0004 Y
1128881 01/15/2024 Late Report The 2023 Semi-Annual 2nd Half Monitoring Report was due on 1/15/2024 but was not turned in until 3/18/2024. Violates Board Order 83-104 MRP Reporting. Violation N Report Calico Ghost Town REC Fac WTF 147184 83-104 N
1128855 01/01/2024 Deficient Monitoring Failed to provide results for several parameters related to flow monitoring. Violating Board Order R6V-01-41 MRP Sections I.A.1,2,3,4,5,6. Violation N Report Edwards AFB WTF 148405 01-041 N
1128841 09/07/2022 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. Violation N Report Boron Class III Landfill 404752 R6V-2016-0004 Y
1128683 09/07/2022 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. Violation N Report Boron Class III Landfill 404752 R6V-2016-0004 Y
1128682 02/28/2022 Groundwater Exceeded WQPS of Arsenic and Chromium during the 2022 H1 Semiannual monitoring period. Violates Board Order R6V-2016-0004 WDR III.D.2 Violation N Report Boron Class III Landfill 404752 R6V-2016-0004 Y
1128680 09/01/2021 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. Violation N Report Boron Class III Landfill 404752 R6V-2016-0004 Y
1128679 03/23/2021 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. Violation N Report Boron Class III Landfill 404752 R6V-2016-0004 Y
1128678 06/15/2021 Groundwater Exceeded WQPS of Chloride during the 2021 1st Half Semiannual monitoring period. Violates Board Order R6V-2016-0004 MRP I.C. Violation N Report Boron Class III Landfill 404752 R6V-2016-0004 Y
1128677 08/18/2020 Deficient Monitoring Vacuum will be applied on the system pressure line for each lysimeter to 70-80 centibars for at least 24 hours. Provided records do not show that the proper pressurizing procedures were used prior to sampling. Violates Board Order R6V-2016-0004 MRP II.A.2.c. Violation N Report Boron Class III Landfill 404752 R6V-2016-0004 Y
1128676 08/20/2020 Groundwater Exceeded WQPS of Chloride, Sulfate, and Total Dissolved Solids during the 2020 2nd Half Semiannual monitoring period. Violates Board Order R6V-2016-0004 MRP I.C. Violation N Report Boron Class III Landfill 404752 R6V-2016-0004 Y
1128273 08/21/2020 Groundwater Exceeded PQL of 1,1-Dichloroethane, cis-1,2Dichloroethene, Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichloroethene (TCE). Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1127306 08/11/2023 Groundwater Exceeded PQL of 1,1-Dichloroethane, Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichloroethene (TCE). Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1127305 02/10/2023 Groundwater Exceeded PQL of 1,1-Dichloroethane, Dichlorodifluoromethane, Methane, Tetrachloroethene (PCE), and Trichloroethene (TCE). Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1127304 09/01/2022 Groundwater (1) Exceeded statistical limits of Barium and Sodium. Violates Board Order R6V-2016-0037 MRP II.A.3.b.i. (2) Exceeded PQL of 1,1-Dichloroethane, Chloromethane, Dichlorodifluoromethane, Methane, Tetrachloroethene (PCE), and Trichloroethene (TCE). Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1127303 01/17/2022 Groundwater (1) Exceeded statistical limits of Bicarbonate Alkalinity as CACO3 and Sodium. Violates Board Order R6V-2016-0037 MRP II.A.3.b.i. (2) Exceeded PQL of 1,1-Dichloroethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichloroethene (TCE). Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1127301 09/15/2021 Groundwater Exceeded PQL of 1,1-Dichloroethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Tetrachloroethene (PCE), and Trichloroethene (TCE). Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1127297 02/19/2021 Groundwater Exceeded PQL of 1,1-Dichloroethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methane, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane. Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1126901 01/31/2024 CAT1 Ammonia, Total (as N) Monthly Average limit is 0.55 mg/L and reported value was 0.75 mg/L at EFF-001. Violation N eSMR Victor Valley Wastewater Reclamation Authority WTP 420359 R6V-2020-0028 N
1126170 01/30/2024 Deficient Reporting (1) Reporting of pond freeboard, liner thickness verification, and saturation measurements was not included in the monitoring report or a separate report. Violates Staff Letter sent out 10/24/23 "Comments on the Septage and Septage Sludge Revised Sampling and Analysis Plan..." (2) Paint filter testing to determine free liquids in contaminated soil accepted for treatment was not reported to the RWQCB in the monitoring report or a separate report. Violates Staff Letter sent out 10/24/23 "Comments on the Landfarm Revised Sampling and Analysis Plan..." Violation N Report Bishop(Sunland)Class III LF 148395 01-034 Y
1126166 08/15/2023 Groundwater (1) Exceeded Practical Quantitation Limit of 1,1-Dichloroethane, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene, Trichloroethene (TCE, and Trichlorofluoromethane during the 2023 Semi-annual 2nd Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii. (2) Exceeded Intra-Well Control Limits of Chloride, Nitrogen, Nitrate (as N), Sulfate, and Total Dissolved Solids during the 2023 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 Y
1126165 02/21/2023 Groundwater (1) Exceeded Practical Quantitation Limit of1,1-Dichloroethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane during the 2023 Semi-annual 1st Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii. (2) Exceeded Intra-Well Control Limits of Chloride, Nitrate as N and Total Dissolved Solids during the 2023 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 Y
1126133 02/08/2023 Groundwater Exceeded Concentration Limits of Barium and Total Organic Carbon during the 2023 1st Half Monitoring Period. Violated R6V-2012-0042 WDR II.A.11 and MRP III.B.5.a. Violation N Report Antelope Valley Public Landfill 383527 R6V-2012-0042 Y
1125985 04/03/2024 Order Conditions Violation of Board Order 6-01-34, Standard Provisions 2.b - Pursuant to California Water Code Section 13260(c), any proposed material change in the character of the waste, manner or method of treatment or disposal, increase of discharge, or location of discharge, shall be reported to the Regional Board at least 120 days in advance of implementation of any such proposal. This shall include, but not limited to, all significant soil disturbances. Documentation of the proposed acceptance of other facilities septage sludge should have been provided to the Water Board at least 120 prior to acceptance. Violation None Inspection Bishop(Sunland)Class III LF 148395 01-034 Y
1125983 04/03/2024 Order Conditions Violation of Board Order 6-01-34, Section I.B.1, Section II.A.7, Section II.A.4, Section II.E.1 Violation None Inspection Bishop(Sunland)Class III LF 148395 01-034 Y
1125261 10/03/2023 CAT2 Formaldehyde Daily Maximum limit is 260 ug/L and reported value was 300 ug/L. Violation N Report Trona Plant 140411 00-053 Y
1125260 09/05/2023 CAT2 Formaldehyde Daily Maximum limit is 260 ug/L and reported value was 340 ug/L. Violation N Report Trona Plant 140411 00-053 Y
1125259 04/18/2023 CAT2 Formaldehyde Daily Maximum limit is 260 ug/L and reported value was 360 ug/L. Violation N Report Trona Plant 140411 00-053 Y
1125258 03/07/2023 CAT2 Formaldehyde Daily Maximum limit is 260 ug/L and reported value was 780 ug/L. Violation N Report Trona Plant 140411 00-053 Y
1125257 02/07/2023 CAT2 Formaldehyde Daily Maximum limit is 260 ug/L and reported value was 360 ug/L. Violation N Report Trona Plant 140411 00-053 Y
1125256 01/15/2024 Deficient Reporting (1) The list of Chemical additives was not included with the annual report. Violates Board Order R6V-2000-0054 MRP I.G. (2) Flow Monitoring Data was not included with Quarter 4/Annual report. Violates Board Order R6V-2000-0054 MRP I.B. Violation N Report West End Plant 140413 00-054 Y
1125255 12/15/2023 Deficient Reporting November monthly effluent constituent sampling results not included in the November monitoring report. Violates Board Order R6V-2000-0054 MRP I.D.1. Table 2 Violation N Report West End Plant 140413 00-054 Y
1125253 07/15/2022 Late Report The 2nd Quarter 2022 monitoring report was not turned in. Violates Board Order R6V-2000-0054 MRP II.B.2. Violation N Report West End Plant 140413 00-054 Y
1125251 04/15/2022 Late Report The 1st Quarter 2022 monitoring report was not turned in. Violates Board Order R6V-2000-0054 MRP II.B.2. Violation N Report West End Plant 140413 00-054 Y
1125250 06/15/2022 Late Report The June 2022 monitoring report was not turned in. Violates Board Order R6V-2000-0054 MRP II.B.1 Violation N Report West End Plant 140413 00-054 Y
1125249 05/15/2022 Late Report The April 2022 monitoring report was not turned in. Violates Board Order R6V-2000-0054 MRP II.B.1 Violation N Report West End Plant 140413 00-054 Y
1125248 04/15/2022 Late Report The March 2022 monitoring report was not turned in. Violates Board Order R6V-2000-0054 MRP II.B.1 Violation N Report West End Plant 140413 00-054 Y
1125247 01/15/2024 Deficient Reporting (1) The list of Chemical additives was not included with the annual report. Violates Board Order R6V-2000-0053 MRP I.G. (2) Flow Monitoring Data was not included with Quarter 4/Annual report. Violates Board Order R6V-2000-0053 MRP I.B. Violation N Report Trona Plant 140411 00-053 Y
1125246 12/15/2023 Deficient Reporting November monthly effluent constituent sampling results not included in the November monitoring report. Violates Board Order R6V-2000-0053 MRP I.D.1. Table 2 Violation N Report Trona Plant 140411 00-053 Y
1125245 09/15/2023 Deficient Reporting The tabular summary of Trona Plant Daily Effluent Sampling was not included in the September 2023 monitoring report. Violates Board Order R6V-2000-0053 MRP II.B.1. a. Violation N Report Trona Plant 140411 00-053 Y
1125244 05/15/2023 Deficient Reporting The tabular summary of Trona Plant Daily Effluent Sampling was not included in the April 2023 monitoring report. Violates Board Order R6V-2000-0053 MRP II.B.1. a. Violation N Report Trona Plant 140411 00-053 Y
1125242 06/15/2022 Late Report The June 2022 monitoring report was not turned in. Violates Board Order R6V-2000-0053 MRP II.B.1 Violation N Report Trona Plant 140411 00-053 Y
1125241 05/15/2022 Late Report The April 2022 monitoring report was not turned in. Violates Board Order R6V-2000-0053 MRP II.B.1 Violation N Report Trona Plant 140411 00-053 Y
1125240 04/15/2022 Late Report The March 2022 monitoring report was not turned in. Violates Board Order R6V-2000-0053 MRP II.B.1 Violation N Report Trona Plant 140411 00-053 Y
1125239 01/15/2024 Deficient Reporting (1) The list of Chemical additives was not included with the annual report. Violates Board Order R6V-2005-0024 MRP I.F. (2) Flow Monitoring Data was not included with Quarter 4/Annual report. Violates Board Order R6V-2005-0024 MRP I.B. Violation N Report Argus Plant 297044 R6V-2005-0024 Y
1125238 07/15/2022 Late Report The 2nd Quarter 2022 monitoring report was not turned in. Violates Board Order R6V-2005-0024 MRP II.B.1. Violation N Report Argus Plant 297044 R6V-2005-0024 Y
1125237 04/15/2022 Late Report The 1st Quarter 2022 monitoring report was not turned in. Violates Board Order R6V-2005-0024 MRP II.B.1. Violation N Report Argus Plant 297044 R6V-2005-0024 Y
1125218 01/30/2024 Deficient Reporting (1) The EDF laboratory data of groundwater for the October 1, 2023 ¿ December 31, 2023, sampling and reporting period was due on January 30, 2024, but it has not been turned in as of March 8, 2024. 38 Days Late. Violates Board Order R6V-2021-0020 MRP IV.A. (2) Annual calibration documentation of instrument calibration and performance checks were not turned in. Violates Board Order R6V-2021-0020 MRP 11.C.4 (LCRS), MRP 11.D.4. (Unsaturated Zone), MRP 11.E.7 (Groundwater) Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125217 01/30/2024 Deficient Monitoring (1) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2023 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. ¿ Attachment A (2) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2023 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. ¿ Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125216 10/03/2023 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125205 11/14/2023 Groundwater Exceeded the concentration limits of Arsenic, Total Cyanide, and Total Dissolved Solids during the 2023 4th Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125170 05/02/2023 Deficient Monitoring MW-6 was not sampled during 2023 Q1, 2023 Q2, 2023 Q3, 2023 Q4. Violates Board Order R6V-2021-0020 II.A.15. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1125169 08/20/2023 Groundwater Exceeded the concentration limits of pH during the 2023 3rd Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125168 04/01/2023 Deficient Monitoring (1) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2023 Quarter 2 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A (2) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2023 Quarter 2 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125167 03/31/2023 Deficient Monitoring (1) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2023 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. ¿ Attachment A (2) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2023 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. ¿ Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125165 04/01/2023 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125164 07/08/2023 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1125163 06/15/2023 Groundwater (1) Exceeded the concentration limits of Arsenic, Total Dissolved Solids, and WAD Cyanide during the 2023 2nd Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. (2) Exceeded PQL of Chloroform during the 2023 2nd Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C.1.b. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1124934 01/26/2024 Late Report Late report violation. 4Q23 report due 1/15/24; report overdue on or after 1/26/24. Late report due to sample collection at end of 4th quarter (12/28/23). Violation N Report Green Valley Foods 416725 None Y
1124933 07/26/2023 Late Report Late report violation. 2Q23 report due 7/15/23; report overdue on or after 7/26/23. Late report due to sample collection at end of 2nd quarter (6/29/23). Violation N Report Green Valley Foods 416725 None N
1124932 01/26/2023 Late Report Late report violation. 4Q22 report due 1/15/23; report overdue on or after 1/26/23. Late report due to sample collection at end of 4th quarter (12/29/22). Violation N Report Green Valley Foods 416725 None N
1124343 10/23/2023 CAT1 Total Dissolved Solids (TDS) Single Sample Maximum limit is 500 mg/L and reported value was 680 mg/L. Violation N Report Nebo Domestic WTF 148011 01-020 Y
1124193 11/02/2023 Groundwater Exceeded WQPS of Fecal Coliform, Iron, and Manganese during the 2023 Q4 monitoring period. Violates Board Order MRP II.G.2.a. Violation N Report Victor Valley Regional Compost 406819 R6V-2016-0031 Y
1124192 01/31/2024 Deficient Reporting (1) Wind direction is not recorded in the 2023 Q4 monitoring report. Violates Board Order MRP II.D. (2) Time-series do not include the applicable MCL or WQPS limits for each respective constituent or monitoring parameter. Violates Board Order MRP III.B.2. Violation N Report Victor Valley Regional Compost 406819 R6V-2016-0031 Y
1124189 08/02/2023 Groundwater Exceeded WQPS of Fecal Coliform, Iron, and Manganese during the 2023 Q3 monitoring period. Violates Board Order MRP II.G.2.a. Violation N Report Victor Valley Regional Compost 406819 R6V-2016-0031 Y
1124174 02/06/2024 Deficient Monitoring (1) Due to recent storms, stormwater needed to be pumped out of inactive Pond 7R. Pumping exceeded Greater than Rapid or Large Leakage Rates and no sample was collected. Violates Board Order No. R6V-2013-0003, WDR, II.A.4.c. Table 2. Violation None Report PG&E Hinkley Compressor Station 436283 R6V-2019-0275 N
1124173 01/15/2024 Deficient Monitoring (1) During weekly inspection of LCRS, liquid was detected and was not sampled. Violates Board Order No. R6V-2013-0003, WDR, II.A.4.ii. Violation N Report PG&E Hinkley Compressor Station 436283 R6V-2019-0275 Y
1124171 01/25/2024 Order Conditions (1) Discharge of windblown material and debris to the adjacent land north of the site. Violates Board Order R6V-2016-0031, WDR, Section II.7. Violates Board Order R6V-2016-0031, WDR, Section II.13. Violation None Inspection Victor Valley Regional Compost 406819 R6V-2016-0031 Y
1124170 10/31/2023 Deficient Reporting (1) Wind direction is not recorded in the 2023 Q3 monitoring report. Violates Board Order MRP II.D. (2) Time-series do not include the applicable MCL or WQPS limits for each respective constituent or monitoring parameter. Violates Board Order MRP III.B.2. Violation N Report Victor Valley Regional Compost 406819 R6V-2016-0031 Y
1123907 07/12/2023 OEV Dissolved Oxygen Daily Minimum limit is 1 mg/L and reported value was 0.27 mg/L. Violation N Report C.V. Kane Safety Roadside Rest 146538 94-100 N
1123904 03/03/2023 OEV Dissolved Oxygen Daily Minimum limit is 1 mg/L and reported value was 0.5 mg/L. Violation N Report C.V. Kane Safety Roadside Rest 146538 94-100 N
1123901 01/30/2024 Deficient Reporting MRP Sections I.A.1-3 and I.B were not included with the 2023 annual report. Violation N Report C.V. Kane Safety Roadside Rest 146538 94-100 Y
1123707 06/30/2023 Deficient Monitoring Violations of Board Order No. 6-00-18, MRP II.A.1. and II.A.4. Discharger did not share any information regarding class III waste disposal during the reporting period. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1123706 06/30/2023 Deficient Monitoring Violations of Board Order No. 6-00-18, MRP II.A.1. and II.A.4. Discharger did not share any information regarding class III waste disposal during the reporting period. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1123705 06/30/2023 Groundwater Exceeded WQPS concentration limits for multiple inorganic and organic constituents in groundwater from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order 6-00-18 MRP I.A.3.a. and b. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1123704 06/30/2023 Order Conditions Concentrations for many constituents of concern in soil gas exceed the method detection limit from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order WDR MRP I.B.3 Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1123703 07/15/2023 Late Report Discharger submitted Report over 50 days late. Violating Board Order R6V-2000-0018 MRP section IV.5. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1123447 01/10/2024 Deficient Reporting Discharger has not complied with the following sections of the Amendment to MRP: Section I.C.b - Identify latitude and longitude for surveyed sampling points for monitoring wells. Section I.C.c - surveyed elevation for a monitoring well. Section I.C.g - upload of boring logs for all groundwater monitoring wells in PDF format to the GeoTracker database. Violation N Inspection Adelanto WWTP 392758 R6V-2013-0058 Y
1123191 12/06/2023 OEV Flow Daily Discharge limit is 0.021 MGD and reported value was 0.0212 MGD. Violation N Report Salt Wells Propul. Labs 440667 None Y
1122496 07/24/2023 OEV Total Coliform Maximum Daily (MDEL) limit is 240 MPN/100 mL and reported value was 1600 MPN/100 mL. Violation N Report Fort Irwin WTF 132500 04-005 N
1122160 03/26/2023 OEV Flow Daily Maximum limit is 0.096 MGD and reported value was 0.107 MGD. Violation N Report Los Ranchos MHP 145807 85-038 N
1122159 03/06/2023 OEV Flow Daily Maximum limit is 0.096 MGD and reported value was 0.160 MGD. Violation N Report Los Ranchos MHP 145807 85-038 N
1122154 11/16/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 90-Day Mean limit is 30.0 mg/L and reported value was 36.0 mg/L. Violation N Report Los Ranchos MHP 145807 85-038 N
1121930 09/30/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 90-Day Mean limit is 30.0 mg/L and reported value was 32.5 mg/L. Violation N Report Los Ranchos MHP 145807 85-038 N
1121929 09/30/2022 Deficient Reporting MRP section I.A.3 states, ¿The freeboard (distance from the top of the lowest part of the dike to the wastewater surface in pond) measured each month in each pond. If the pond does not contain wastewater, indicate that it is empty." For the month of September during Quarter 3 of 2022, the freeboard amount for all three ponds were not reported. Violation N Report Los Ranchos MHP 145807 85-038 N
1121840 03/31/2023 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 90-Day Mean limit is 30.0 mg/L and reported value was 38.0 mg/L. Violation N Report Bear Valley MHP WTF 145753 84-058 N
1121839 02/16/2023 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Single Sample Maximum limit is 45.0 mg/L and reported value was 48.0 mg/L. Violation N Report Bear Valley MHP WTF 145753 84-058 N
1121838 12/31/2022 OEV Flow Daily Discharge limit is 0.025 MGD and reported value was 0.026 MGD. Violation N Report Bear Valley MHP WTF 145753 84-058 N
1121837 12/30/2022 OEV Flow Daily Discharge limit is 0.025 MGD and reported value was 0.026 MGD. Violation N Report Bear Valley MHP WTF 145753 84-058 N
1121835 11/10/2022 OEV Flow Daily Discharge limit is 0.025 MGD and reported value was 0.043 MGD. Violation N Report Bear Valley MHP WTF 145753 84-058 N
1121834 10/11/2022 OEV Flow Daily Discharge limit is 0.025 MGD and reported value was 0.046 MGD. Violation N Report Bear Valley MHP WTF 145753 84-058 N
1121833 10/10/2022 OEV Flow Daily Discharge limit is 0.025 MGD and reported value was 0.046 MGD. Violation N Report Bear Valley MHP WTF 145753 84-058 N
1121614 12/30/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Single Sample Maximum limit is 45.0 mg/L and reported value was 71.0 mg/L. Violation N Report Bear Valley MHP WTF 145753 84-058 N
1121613 05/19/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Single Sample Maximum limit is 45.0 mg/L and reported value was 59.0 mg/L. Violation N Report Bear Valley MHP WTF 145753 84-058 N
1121326 04/05/2023 CAT1 Fluoride, Total Single Sample Maximum limit is 2.0 mg/L and reported value was 9.6 mg/L. Violation N Report Fort Irwin WTF 132500 04-005 N
1121145 01/12/2023 Order Conditions Exceeded soil gas MDL 1,1,2-Trichloro-1,2,2-trifluoroethane, 1,1-Dichloroethane, 1,1-Dichloroethene, 1,2,4-Trimethylbenzene, 1,2-Dichloro-1,1,2,2-tetrafluoroethane, Acetone, Benzene, Chloroethane, Chloromethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), trans-1,2-Dichloroethene, Trichloroethene (TCE), Trichlorofluoromethane, and Vinyl chloride. Violates Board Order R6V-2006-0026 MRP I.C.2. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 Y
1121136 01/12/2023 Groundwater (1) Exceeded MDL of 1,1-Dichloroethane, Chloroform, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Phenol, Tetrachloroethene (PCE), Trichloroethene (TCE), and Vinyl chloride. Violates Board Order R6V-2006-0026 MRP I.B.3. (2) Exceeded UTL of Alkalinity as CaCO3, Bicarbonate as HCO3, Calcium, Chloride, Hardness as CaCO3, Magnesium, Nitrogen, Nitrate (as N), Sodium, Sulfate, and Total Dissolved Solids. Violates Board Order R6V-2006-0026 MRP I.B.3. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 Y
1121126 07/14/2022 Order Conditions Exceeded soil gas MDL 1,1,2-Trichloro-1,2,2-trifluoroethane, 1,1-Dichloroethane, 1,1-Dichloroethene, 1,2,4-Trimethylbenzene, 1,2-Dichloro-1,1,2,2-tetrafluoroethane, 4-Methyl-2-pentanone, Acetone, Benzene, Carbon disulfide, Chloroethane, Chloroform, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Ethylbenzene, Methylene chloride, Tetrachloroethene (PCE), Toluene, trans-1,2-Dichloroethene, Trichloroethene (TCE), Trichlorofluoromethane, Vinyl chloride, and Xylene, Isomers m & p. Violates Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 N
1121125 07/14/2022 Groundwater (1) Exceeded MDL of 1,1-Dichloroethane, 1,4-Dichlorobenzene, Benzene, Chloroform, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methyl-tert-butyl ether (MTBE), Phenol, Tetrachloroethene (PCE), Trichloroethene (TCE), and Vinyl chloride. Violates Board Order R6V-2006-0026 MRP I.B.3. (2) Exceeded UTL of Alkalinity as CaCO3, Bicarbonate as HCO3, Calcium, Chloride, Hardness as CaCO3, Magnesium, Manganese, Sodium, Sulfate, and Total Dissolved Solids. Violates Board Order R6V-2006-0026 MRP I.B.3. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 N
1121122 01/18/2022 Order Conditions Exceeded soil gas MDL of 1,1,2-Trichloro-1,2,2-trifluoroethane, 1,1-Dichloroethane, 1,1-Dichloroethene, 1,2-Dichloro-1,1,2,2-tetrafluoroethane, 1,2-Dichloropropane, 4-Methyl-2-pentanone, Acrylonitrile, Benzene, Chloroethane, Chloroform, Chloromethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Ethylbenzene, Methylene chloride, o-Xylene, Tetrachloroethene (PCE), Toluene, trans-1,2-Dichloroethene, Trichloroethene (TCE), Trichlorofluoromethane, Vinyl chloride, and Xylene, Isomers m & p. Violates Board Order R6V-2006-0026 MRP I.C.2. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 N
1121121 01/18/2022 Groundwater (1) Exceeded MDL of 1,1-Dichloroethane, 1,4-Dichlorobenzene, Chloroform, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methyl-tert-butyl ether (MTBE), Phenol, Styrene, Tetrachloroethene (PCE), Trichloroethene (TCE), Trichlorofluoromethane, and Vinyl chloride. Violates Board Order R6V-2006-0026 MRP I.B.3. (2) Exceeded UTL of Alkalinity as CaCO3, Bicarbonate as HCO3, Calcium, Chloride, Hardness as CaCO3, Magnesium, Manganese, Sodium, Sulfate, and Total Dissolved Solids. Violates Board Order R6V-2006-0026 MRP I.B.3. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 N
1120947 07/16/2023 Late Report 2nd Quarter 2023 Report due on July 15, 2023. The report was received on September 26, 2023. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 Y
1120946 04/16/2023 Late Report 1st Quarter 2023 Report due on April 15, 2023. The report was received on September 21, 2023. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120942 05/31/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.126 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120941 05/29/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120940 05/28/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120939 05/27/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120938 05/23/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120937 05/21/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120936 05/20/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120935 05/19/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.135 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120934 05/18/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.098 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120933 05/17/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.123 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120932 05/16/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120931 05/15/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120930 05/14/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.103 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120929 05/13/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.130 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120928 05/12/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.099 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120927 05/11/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120926 05/10/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.109 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120925 05/09/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.122 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120924 05/08/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.087 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120923 05/07/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.105 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120922 05/06/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.122 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120921 05/05/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.104 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120920 05/04/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.117 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120919 05/02/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.117 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120918 03/15/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120917 03/14/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120916 03/13/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120915 03/12/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120914 03/11/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120913 03/10/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120912 03/09/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120911 03/08/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.119 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120910 03/07/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120909 03/06/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120908 03/05/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.122 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120907 03/04/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120906 03/03/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.110 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120905 03/02/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.166 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120904 03/01/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.140 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120903 02/28/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.126 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120902 02/26/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120901 02/25/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120900 02/24/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120899 02/23/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120898 02/21/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120897 02/20/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120896 02/19/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.135 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120895 02/18/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.098 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120894 02/17/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.123 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120893 02/16/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120892 02/15/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120891 02/14/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.103 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120890 02/13/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.130 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120889 02/12/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.099 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120888 02/11/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.109 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120887 02/10/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.109 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120886 02/09/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.122 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120885 02/08/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.087 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120884 02/07/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.105 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120883 02/06/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.122 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120882 02/05/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.104 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120881 02/04/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.117 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120880 02/02/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.117 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120879 01/31/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.127 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120878 01/29/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120877 01/28/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120876 01/27/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120875 01/26/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120874 01/25/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120873 01/24/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120872 01/23/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120871 01/21/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120870 01/20/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120869 01/19/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120868 01/18/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120867 01/17/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120866 01/16/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120865 01/15/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.138 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120864 01/14/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120863 01/13/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.113 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120862 01/12/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.117 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120861 01/10/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120860 01/09/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120859 01/08/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120858 01/07/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120857 01/06/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120856 01/05/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120855 01/04/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120854 01/03/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.084 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120853 01/02/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.132 MGD. Violation None Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120852 01/01/2023 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.146 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1120389 04/01/2023 Deficient Monitoring Violating WDR 6-01-41Sections I.A. 1,2,3,4,5,6. Violation N Report Edwards AFB WTF 148405 01-041 N
1120388 04/01/2023 Deficient Monitoring Violating WDR 6-01-41Sections I.A. 1,2,3,4,5,6. Violation N Report Edwards AFB WTF 148405 01-041 N
1120081 07/18/2023 Unauthorized Discharge The property owner has not filed a ROWD for these activities. The activities and conditions on this subject property violate Water Code Section 13260. Violation N Inspection Diego Romo Property 453986 None Y
1120080 07/18/2023 Unauthorized Discharge The property owner has not filed a ROWD for these activities. The activities and conditions on this property violate Water Code Section 13260 and 13264. Violation N Inspection Diosenia Valencia Property 453988 None Y
1120079 07/18/2023 Unauthorized Discharge The property owner has not filed a ROWD for these activities. The activities and conditions on this property violate Water Code Section 13260 and 13264. Violation N Inspection Oskar Alfredo Cortez Cruz 453987 None Y
1119149 08/29/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 3-Month Median limit is 45 mg/L and reported value was 53 mg/L. Violation N Report Mountain View Villas 146081 86-011 Y
1119148 02/28/2023 CAT1 Total Dissolved Solids (TDS) Monthly Maximum limit is 181 mg/L and reported value was 220 mg/L. Violation N Report Crystal Geyser Roxane Cabin Bar Water Bottling Plant 392194 R6V-2017-0006 Y
1119122 10/31/2022 Unauthorized Discharge During the November 2022 inspection, Water Board staff observed sewage sludge from a digester in an unauthorized disposal location within the District¿s property between the digester and the aerated lagoon. The discharge of sewage sludge to adjacent land area between the digester and the aerated lagoon is a violation of General Requirements and Prohibitions, Section No. I.D.1. The discharge of sewage sludge to an unauthorized disposal location is a violation of General Requirements and Prohibitions, Section No. I.D.6. Violation N Inspection Eastern Sierra CSD WWTF 146485 94-024 N
1119114 10/20/2022 Unauthorized Discharge On October 20, 2022, a mower struck and broke a three-inch riser obscured by vegetation located on the northwest corner of the intersection of Avenue D and Sierra Highway causing an unauthorized discharge at the Plant. The discharge consisted of approximately 409,500 gallons of tertiary treated recycled water from the broken pipe to an unauthorized location. Violation N Complaint Lancaster Water Reclamation Plant 449006 R6V-2022-0023 N
1118856 09/12/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.029 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118855 09/11/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.029 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118854 09/09/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.027 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118853 09/08/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.027 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118852 09/07/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118851 09/06/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118850 09/05/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.022 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118849 09/04/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118848 09/03/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.025 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118847 09/02/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.026 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118846 09/01/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118845 08/31/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118844 08/30/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118843 08/29/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118842 08/28/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118841 08/27/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118840 08/26/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118839 08/25/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1118838 08/24/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1118716 04/05/2023 Groundwater Exceeded the MDL of Dichlorodifluoromethane during 2023 1st Half monitoring period. Violates Board Order R6V-1995-116 MRP I.A.3.b. Violation N Report Independence Class III Landfill 146861 95-116 Y
1118703 04/07/2022 Groundwater Exceeded the MDL of Tetrachloroethene (PCE) during 2022 1st Half monitoring period. Violates Board Order R6V-1995-116 MRP I.A.3.b. Violation N Report Independence Class III Landfill 146861 95-116 Y
1118654 07/26/2022 Late Report This report was due 7/15/2022 but was not submitted until 7/26/2022 Violation N Report Owens Valley Conser Camp WTF 147575 96-053 Y
1118646 04/27/2023 Late Report This report was due on 4/15/23 but was not submitted until 4/27/23. Violation N Report Owens Valley Conser Camp WTF 147575 96-053 Y
1118480 05/01/2023 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.0295 MGD. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1118357 04/03/2023 Deficient Reporting Violations of Board Order No. 6-00-18, MRP II.A.1. and II.A.4. Discharger did not share any information regarding class III waste disposal during the reporting period. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1118356 04/03/2023 Failure to Notify Failure to include a transmittal letter with essential points pointed out, including a discussion of violations and actions taken or planned for correcting those violations. Violates Board Order 00-18 MRP Req. III. A. 2. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1118355 07/15/2022 Failure to Notify Failure to include a transmittal letter with essential points pointed out, including a discussion of violations and actions taken or planned for correcting those violations. Violates Board Order 00-18 MRP Req. III. A. 2. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1118354 07/15/2022 Deficient Reporting Violations of Board Order No. 6-00-18, MRP II.A.1. and II.A.4. Discharger did not share any information regarding class III waste disposal during the reporting period. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1118353 07/15/2021 Deficient Reporting Violations of Board Order No. 6-00-18, MRP II.A.1. and II.A.4. Discharger did not share any information regarding class III waste disposal during the reporting period. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1118352 12/31/2022 Order Conditions Concentrations for many constituents of concern in soil gas exceed the method detection limit from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order WDR MRP I.B.3 Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1118351 12/31/2022 Order Conditions Exceeded WQPS concentration limits for multiple inorganic and organic constituents in groundwater from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order 6-00-18 MRP I.A.3.a. and b. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1118350 07/15/2022 Order Conditions Exceeded WQPS concentration limits for multiple inorganic and organic constituents in groundwater from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order 6-00-18 MRP I.A.3.a. and b. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1118349 07/15/2022 Order Conditions Concentrations for many constituents of concern in soil gas exceed the method detection limit from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. . Violates Board Order WDR MRP I.B.3 Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1118348 07/15/2021 Order Conditions Concentrations for many constituents of concern in soil gas exceed the method detection limit from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. . Violates Board Order WDR MRP I.B.3 Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1118347 07/15/2021 Order Conditions Exceeded WQPS concentration limits for multiple inorganic and organic constituents in groundwater from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order 6-00-18 MRP I.A.3.a. and b. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1118242 03/30/2022 Late Report Submittal Periods, monitoring reports shall be submitted to the Regional Board by the 15th day of the month following each quarter. Violating Board order: 94-53 MRP section II.C. Violation N Report Salt Wells Propul. Labs 146498 94-053 N
1117947 01/01/2023 Deficient Monitoring Discharger failed to monitor influent flow, violating WDR R6V-99-033 section: MRP I.A.1-4. Unable to report influent flow due to power failure. Power failure erased the monitoring program and the calibration of the flow meter. January 1, 2023 ? March 31, 2023 Violation N Report Airforce Research Lab STP 146721 99-033 N
1117944 08/31/2022 Groundwater (1) Exceeded Concentration Limits of Total Organic Carbon during the 2022 2nd Half Monitoring Period. Violated R6V-2012-0042 WDR II.A.11 and MRP III.B.5.a. (2) Exceeded two-non-naturally occurring waste constituents above MDL, 1,1-Dichloroethane, cis-1, 2-Dichloroethene, Dichlorodifluoromethane during the 2022 2nd Half Monitoring Period. Violated R6V-2012-0042 WDR II.F.2. and MRP III.B.5. b. Violation N Report Antelope Valley Public Landfill 383527 R6V-2012-0042 N
1117943 02/14/2022 Deficient Monitoring (1) A sample of soil gas monitoring points with a gas concentration over 5% Methane were not collected during the 2022 1st quarter monitoring period. Violated R6V-2012-0042 MRP III.D. Violation N Report Antelope Valley Public Landfill 383527 R6V-2012-0042 N
1117942 02/16/2022 Groundwater (1) Exceeded Concentration Limits of Total Organic Carbon during the 2022 1st Half Monitoring Period. Violated R6V-2012-0042 WDR II.A.11 and MRP III.B.5.a. (2) Exceeded two-non-naturally occurring waste constituents above MDL, 1,1-Dichloroethane, cis-1, 2-Dichloroethene, Dichlorodifluoromethane during the 2022 1st Half Monitoring Period. Violated R6V-2012-0042 WDR II.F.2. and MRP III.B.5. b. Violation N Report Antelope Valley Public Landfill 383527 R6V-2012-0042 N
1117791 06/08/2023 BMP BMP Deficiencies Violation None Inspection Mountain County Bridge Rails 435202 R6T-2020-0034 Y
1117769 04/30/2023 Deficient Reporting The EDF laboratory data of the January 1, 2023 - March 31, 2023, sampling and reporting period was due on April 30, 2023, but it has not been turned in as of May 8, 2023. 8 Days Late. Violates Board Order R6V-2021-0020 MRP IV.A. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1117768 03/31/2023 Deficient Monitoring (1) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2023 Quarter 1 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A: (2) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2023 Quarter 1 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117767 03/16/2023 Groundwater Exceeded the concentration limits of Arsenic and Iron during the 2023 1st Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1117766 02/11/2023 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1117765 01/30/2023 Deficient Reporting The EDF laboratory data of the October 1, 2022 ¿ December 31, 2022, sampling and reporting period was due on January 30, 2023, but it has not been turned in as of May 8, 2023. 98 Days Late. Violates Board Order R6V-2021-0020 MRP IV.A. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1117764 12/31/2022 Deficient Monitoring (1) Surface Impoundment grab sample not sampled for field parameters Dissolved Oxygen and Turbidity during 2022 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.B.3. ¿ Attachment A; (2) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2022 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. ¿ Attachment A; (3) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2022 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. ¿ Attachment A; (4) Annual calibration documentation of instrument calibration and performance checks was not turned in. Violates Board Order R6V-2021-0020 MRP II.C.4 (LCRS), MRP II.D.4. (Unsaturated Zone), MRP II.E.7 (Groundwater) Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1117763 11/15/2022 Groundwater Exceeded the concentration limits of Arsenic, Iron, Lead, Mercury, and Total Dissolved Solids during the 2022 4th Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117762 11/10/2022 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117761 10/30/2022 Deficient Reporting The EDF laboratory data of the July 1, 2022 - September 30, 2022, sampling and reporting period was due on October 30, 2022, but it has not been turned in as of May 8, 2023. 190 Days Late. Violates Board Order R6V-2021-0020 MRP IV.A. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117760 09/30/2022 Deficient Monitoring (1) Surface Impoundment grab sample not sampled during 2022 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.B.2-3 Attachment A; (2) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2022 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A; (3) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2022 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117759 08/03/2022 Groundwater Exceeded the concentration limits of Arsenic and Iron during the 2022 3rd Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1117758 07/30/2022 Deficient Reporting The EDF laboratory data of the April 1, 2022 ¿ June 30, 2022 sampling and reporting period was due on July 30, 2022 but it has not been turned in as of May 8, 2023. 282 Days Late. Violates Board Order R6V-2021-0020 MRP IV.A. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117757 06/30/2022 Deficient Monitoring (1) Surface Impoundment grab sample not sampled for field parameters Dissolved Oxygen and Turbidity during 2022 Quarter 2 monitoring period. Violates Board Order R6V-2021-0020 MRP II.B.3. Attachment A; (2) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2022 Quarter 2 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A; (3) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2022 Quarter 2 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A; (4)Groundwater was not sampled during the 2nd Quarter 2022 monitoring period. Violates Board Order R6V-2021-0020 MRP II.E. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117756 06/14/2022 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117754 01/09/2022 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117752 07/15/2021 Groundwater Exceeded the concentration limits of Arsenic during the 2021 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117751 11/19/2021 Groundwater Exceeded the concentration limits of Arsenic during the 2022 1st Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117749 10/10/2021 Deficient Monitoring Grab sample not collected after one half of the ALR was exceeded or three consecutive liquid detections. Violates Board Order R6V-2021-0020 MRP II.C.6. Table 2 Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117736 12/31/2021 Deficient Monitoring (1) Surface Impoundment grab sample not sampled for field parameters Dissolved Oxygen and Turbidity during 2021 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.B.3. Attachment A (2) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2021 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A (3) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2021 Quarter 4 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117735 02/16/2022 Groundwater Exceeded the concentration limits of Arsenic, Iron, and Total Dissolved Solids during the 2022 1st Quarter monitoring period. Violates Board Order R6V-2021-0020 MRP I.C. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117734 09/30/2021 Deficient Monitoring (1) Surface Impoundment grab sample not sampled for field parameters Dissolved Oxygen and Turbidity during 2021 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.B.3. Attachment A (2) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2021 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. Attachment A (3) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2021 Quarter 3 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117278 03/30/2022 Deficient Monitoring (1) Surface Impoundment grab sample not sampled for field parameters Dissolved Oxygen and Turbidity during 2022 Quarter 1 monitoring period. Violates Board Order R6V-2021-0020 MRP II.B.3. ¿ Attachment A (2) LCRS grab samples were not sampled for monitoring parameters Arsenic, Copper, Iron, Lead, Mercury, Nitrate, Sulfate, Total Dissolved Solids during the 2022 Quarter 1 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.2. ¿ Attachment A (3) LCRS grab samples were not sampled for field parameters Dissolved Oxygen, Electrical Conductivity, pH, Temperature, and Turbidity during the 2022 Quarter 1 monitoring period. Violates Board Order R6V-2021-0020 MRP II.C.3. ¿ Attachment A Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1117212 01/17/2023 Groundwater Exceeded MCLs and SMCLs for the following constituents. Arsenic (0.010mg/L), Total Chromium (0.05 mg/L), Chloride(250/500mg/L), Nickle (0.1 mg/L), Nitrate (as N) (10mg/L), Selenium (0.001mg/L); Sulfate (250/500mg/L), Total Dissolved Solids (500/1000mg/L), Iron(0.3mg/L), Violating Board Order RV6-2002-0019 Section 2. B.1. d. Violation N Report Main Base Class III Landfill 132096 R6V-2002-0019 N
1115865 02/05/2023 CAT2 Copper, Total Recoverable Monthly Average (Mean) limit is 6.5 ug/L and reported value was 25 ug/L at EFF-001. Violation N eSMR Victor Valley Wastewater Reclamation Authority WTP 420359 R6V-2020-0028 N
1115864 02/05/2023 CAT2 Copper, Total Recoverable Monthly Average (Mean) limit is 0.76 lb/day and reported value was 1.2 lb/day at EFF-001. Violation N eSMR Victor Valley Wastewater Reclamation Authority WTP 420359 R6V-2020-0028 N
1115863 02/05/2023 CAT2 Copper, Total Recoverable Maximum Daily (MDEL) limit is 12.9 ug/L and reported value was 25 ug/L at EFF-001. Violation N eSMR Victor Valley Wastewater Reclamation Authority WTP 420359 R6V-2020-0028 N
1115754 12/29/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.034 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115753 12/28/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115752 12/27/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.033 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115751 12/19/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.048 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115750 12/12/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.034 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115749 12/11/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.037 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115748 12/07/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.032 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115747 11/26/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.038 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115746 11/25/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115735 11/23/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.032 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115734 11/21/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.035 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115733 11/19/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.032 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115732 11/15/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.034 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115731 09/11/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.039 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115730 08/30/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.154 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115729 08/29/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.669 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115727 07/25/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.045 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115726 07/03/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.036 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115725 07/01/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.033 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115724 06/23/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.037 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115723 05/09/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.05 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115722 05/21/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.038 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115721 04/21/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.037 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115720 04/18/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115718 04/15/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.05 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115717 04/11/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.04 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115716 04/08/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115715 04/01/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.041 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115556 09/13/2022 Deficient Monitoring Unsaturated zone moisture exceeded upper tolerance limits. Field verification testing and Water Board notification has not been completed. Violates Board Order R6V-2015-0057 MRP II.A.5.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115555 07/31/2022 Order Conditions Surface impoundment action leakage rates exceeded. Violates Board Order R6V-2015-0057-A1 MRP II.A.4.b. Table 1 Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115554 12/31/2022 Deficient Monitoring (1) Wastewater sample was not analyzed for annual constituents of concern in Attachment A. Violates Board Order R6V-2015-0057 MRP II.A.1.a. (2) List of all monitoring pairs that have exhibited a verified measurably significant increase was not included. Violates Board Order R6V-2015-0057 MRP IV.3.a. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115553 12/31/2022 Deficient Monitoring (1) Wastewater average daily flow, volume of flow, and cumulative flow to each surface impoundment was not reported. Violates Board Order R6V-2015-0057 MRP II.A.1.b-d (2) The Operation and Maintenance summary did not discuss the calibration of any wastewater flow measuring devices. Violates Board Order R6V-2015-0057 MRP II.F.3. (3) Failure to comment on whether there are any physical evidence indications of a release. Violates Board Order R6V-2015-0057 MRP III.B.1. (4) Failure to provide laboratory analytical results/reports for all laboratory analyses. Violates Board Order R6V-2015-0057 WDR III.F.2. MRP II. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115552 08/04/2022 Groundwater Exceeded the CUSUM limit of Antimony, Bicarbonate Alkalinity as CACO3, Boron, Calcium, Fluoride, Iron, Magnesium, Mercury, Sulfate, Total Dissolved Solids during the 2022 2nd Half monitoring period. Violates Board Order R6V-2015-0057 MRP I.3. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115550 12/31/2022 Order Conditions (1) Failure to maintain well 3M-71 in good working order. Violates Board Order R6V-2015-0057 WDR II.A.14. (2) Failure to maintain the following surface impoundments in good working order BAP-3, BAP-6, R-Pond Compartment 1, and R-Pond Compartment 2. Violates Board Order R6V-2015-0057 WDR II.A.14. (3) Daily freeboard measurements were not included in the 2022 2nd half monitoring report. MRP II.A.3.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115548 03/15/2022 Deficient Monitoring Unsaturated zone moisture exceeded upper tolerance limits. Field verification testing and Water Board notification has not been completed. Violates Board Order R6V-2015-0057 MRP II.A.5.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115547 01/31/2022 Order Conditions Surface impoundment action leakage rates exceeded. Violates Board Order R6V-2015-0057-A1 MRP II.A.4.b. Table 1 Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115546 06/30/2022 Deficient Monitoring (1) Wastewater sample was not analyzed for annual constituents of concern in Attachment A. Violates Board Order R6V-2015-0057 MRP II.A.1.a. (2) Wastewater average daily flow, volume of flow, and cumulative flow to each surface impoundment was not reported. Violates Board Order R6V-2015-0057 MRP II.A.1.b-d (3) Storm water sample from FCC catchments was not analyzed for Nitrate. Violates Board Order R6V-2015-0057 MRP II.E. (4) The Operation and Maintenance summary did not discuss the calibration of any wastewater flow measuring devices. Violates Board Order R6V-2015-0057 MRP II.F.3. (5) Failure to comment on whether there are any physical evidence indications of a release. Violates Board Order R6V-2015-0057 MRP III.B.1. (6) Failure to provide laboratory analytical results/reports for all laboratory analyses. Violates Board Order R6V-2015-0057 WDR III.F.2. MRP II. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115545 04/12/2022 Groundwater (1) Exceeded the CUSUM limit of Fluoride during the 2022 1st Half monitoring period. Violates Board Order R6V-2015-0057 MRP I.3. (2) Exceeds MDL of Chloroform, Benzene, and tert-Butyl alcohol during the 2022 1st Half monitoring period. Violates Board Order R6V-2015-0057 MRP I.3. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115544 06/30/2022 Order Conditions (1) Failure to maintain the following groundwater monitoring or extraction wells in good working order 3M-17, EXT-02, GWM-43, GWM-60, and GWM-107. Violates Board Order R6V-2015-0057 WDR II.A.14. (2) Failure to maintain the following surface impoundments in good working order BAP-3, BAP-6, R-Pond Compartment 1, and R-Pond Compartment 2. Violates Board Order R6V-2015-0057 WDR II.A.14. (3) Daily freeboard measurements were not included in the 2022 1st half monitoring report. MRP II.A.3.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115541 09/21/2021 Deficient Monitoring Unsaturated zone moisture exceeded upper tolerance limits. Field verification testing and Water Board notification has not been completed. Violates Board Order R6V-2015-0057 MRP II.A.5.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115539 07/31/2021 Order Conditions Surface impoundment action leakage rates exceeded. Violates Board Order R6V-2015-0057-A1 MRP II.A.4.b. Table 1 Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115538 12/31/2021 Deficient Monitoring (1) Wastewater sample was not analyzed for annual constituents of concern in Attachment A. Violates Board Order R6V-2015-0057 MRP II.A.1.a. (2) Annual documentation of instrument calibration and performance checks was not included in the 2021 2nd Half/Annual monitoring report. Violates Board Order R6V-2015-0057 MRP II.G.1.d. and MRP IV.A.3. (3) List of all monitoring pairs that have exhibited a verified measurably significant increase was not included. Violates Board Order R6V-2015-0057 MRP IV.3.a. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115537 12/31/2021 Deficient Monitoring (1) Wastewater average daily flow, volume of flow, and cumulative flow to each surface impoundment was not reported. Violates Board Order R6V-2015-0057 MRP II.A.1.b-d (2) Storm water sample from FCC catchments was not analyzed for Nitrate. Violates Board Order R6V-2015-0057 MRP II.E. (3) The Operation and Maintenance summary did not discuss the calibration of any wastewater flow measuring devices. Violates Board Order R6V-2015-0057 MRP II.F.3. (4) Failure to comment on whether there are any physical evidence indications of a release. Violates Board Order R6V-2015-0057 MRP III.B.1. (5) Failure to provide laboratory analytical results/reports for all laboratory analyses. Violates Board Order R6V-2015-0057 WDR III.F.2. MRP II. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115536 11/18/2021 Groundwater (1) Exceeded the CUSUM limit of Chloride, Mercury, and Sulfate during the 2021 2nd Half monitoring period. Violates Board Order R6V-2015-0057 MRP I.3. (2) Exceeded the MDL of Chloroform during the 2021 2nd half monitoring period. Violates Board Order R6V-2015-0057 MRP I.3. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115535 12/31/2021 Order Conditions (1) Failure to maintain the following groundwater monitoring or extraction wells in good working order EXT-06, EXT-12, GWM-32, GWM-43, GWM-43, GWM-60, and GWM-107. Violates Board Order R6V-2015-0057 WDR II.A.14. (2) Failure to maintain the following surface impoundments in good working order BAP-6,R-Pond Compartment 1, and R-Pond Compartment 2. Violates Board Order R6V-2015-0057 WDR II.A.14. (3) Daily freeboard measurements were not included in the 2020 1st half monitoring report. MRP II.A.3.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115534 03/16/2021 Deficient Monitoring Unsaturated zone moisture exceeded upper tolerance limits. Field verification testing and Water Board notification has not been completed. Violates Board Order R6V-2015-0057 MRP II.A.5.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115533 02/28/2021 Order Conditions Surface impoundment action leakage rates exceeded. Violates Board Order R6V-2015-0057-A1 MRP II.A.4.b. Table 1 Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115532 06/30/2021 Deficient Monitoring (1) Wastewater average daily flow, volume of flow, and cumulative flow to each surface impoundment was not reported. Violates Board Order R6V-2015-0057 MRP II.A.1.b-d (2) Storm water sample from FCC catchments was not analyzed for Nitrate. Violates Board Order R6V-2015-0057 MRP II.E. (3) The Operation and Maintenance summary did not discuss the calibration of any wastewater flow measuring devices. Violates Board Order R6V-2015-0057 MRP II.F.3. (4) Failure to comment on whether there are any physical evidence indications of a release. Violates Board Order R6V-2015-0057 MRP III.B.1. (5) Failure to provide laboratory analytical results/reports for all laboratory analyses. Violates Board Order R6V-2015-0057 WDR III.F.2. MRP II. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115531 06/03/2021 Groundwater (1) Exceeded the CUSUM limit of Bicarbonate Alkalinity as CACO3, Boron, Calcium, Chloride, Fluoride, Iron, Magnesium, Mercury, Sulfate, Total Dissolved Solids during the 2021 1st Half monitoring period. Violates Board Order R6V-2015-0057 MRP I.3. (2) Exceeded MDL of Chloroform and Trichloroethene during the 2021 1st half monitoring period. Violates Board Order R6V-2015-0057 MRP I.3. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115530 06/30/2021 Order Conditions (1) Failure to maintain the following groundwater monitoring or extraction wells in good working order EXT-02, EXT-04, EXT-05, EXT-06, EXT-12, GWM-32, GWM-43, GWM-60, and GWM-107. Violates Board Order R6V-2015-0057 WDR II.A.14. (2) Failure to maintain the following surface impoundments in good working order BAP-6, R-Pond Compartment 2, and R-Pond Compartment 2. Violates Board Order R6V-2015-0057 WDR II.A.14 (3) The freeboard of Surface Impoundments R-Pond 7 was less than 2 feet on one day the 2021 1st half monitoring period. Violates Board Order R6V-2015-0057 WDR II.B.3. (4) Daily freeboard measurements were not included in the 2020 1st half monitoring report. MRP II.A.3.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115528 08/17/2020 Deficient Monitoring Unsaturated zone moisture exceeded upper tolerance limits. Field verification testing and Water Board notification has not been completed. Violates Board Order R6V-2015-0057 MRP II.A.5.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115527 07/31/2020 Order Conditions Surface impoundment action leakage rates exceeded. Violates Board Order R6V-2015-0057-A1 MRP II.A.4.b. Table 1 Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115526 03/30/2021 Late Report The 2020 Annual Monitoring Report was due on March 30, 2021 and was turned in on May 7, 2021. The report was 38 Days Late. Violates Board Order R6V-2015-0057 MRP IV.A.1. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115525 12/31/2020 Deficient Reporting (1) Wastewater sample was not analyzed for annual constituents of concern in Attachment A. Violates Board Order R6V-2015-0057 MRP II.A.1.a. (2) Annual documentation of instrument calibration and performance checks was not included in the 2020 2nd Half/Annual monitoring report. Violates Board Order R6V-2015-0057 MRP II.G.1.d. and MRP IV.A.3. (3) List of all monitoring pairs that have exhibited a verified measurably significant increase was not included. Violates Board Order R6V-2015-0057 MRP IV.3.a. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115524 12/31/2020 Deficient Monitoring (1) Wastewater average daily flow, volume of flow, and cumulative flow to each surface impoundment was not reported. Violates Board Order R6V-2015-0057 MRP II.A.1.b-d (2) Storm water sample from FCC catchments was not analyzed for Nitrate. Violates Board Order R6V-2015-0057 MRP II.E. (3) The Operation and Maintenance summary did not discuss the calibration of any wastewater flow measuring devices. Violates Board Order R6V-2015-0057 MRP II.F.3. (4) Failure to comment on whether there are any physical evidence indications of a release. Violates Board Order R6V-2015-0057 MRP III.B.1. (5) Failure to provide laboratory analytical results/reports for all laboratory analyses. Violates Board Order R6V-2015-0057 WDR III.F.2. MRP II. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115523 10/29/2020 Groundwater (1) Exceeded the CUSUM limit of Fluoride during the 2020 2nd Half monitoring period. Violates Board Order R6V-2015-0057 MRP I.3. (2) Exceeded the MDL of Chloroform, Phenolics, and Trichloroethene during the 2020 2nd Half monitoring period. Violates Board Order R6V-2015-0057 MRP I.3. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115522 12/31/2020 Order Conditions (1) Failure to maintain LCRS metering equipment in good working order to achieve compliance with BO. WDR II.A.14. (2) Failure to maintain the following groundwater monitoring or extraction wells in good working order 3M-71, EXT-01, EXT-02, EXT-03, EXT-06, EXT-09, EXT-12, GWM-05, GWM-27, GWM-28, GWM-32, GWM-43, GWM-45, GWM-46, GWM-59A, GWM-60, and GWM-107. Violates Board Order R6V-2015-0057 WDR II.A.14. (3) Daily freeboard measurements were not included in the 2020 1st half monitoring report. MRP II.A.3.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115521 07/30/2020 Late Report The 2020 1st half Monitoring Report was due on July 30, 2020 and was turned in on October 10, 2020. The report was 72 Days Late. Violates Board Order R6V-2015-0057 MRP IV.A.1. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115517 06/30/2020 Deficient Monitoring (1) Wastewater average daily flow, volume of flow, and cumulative flow to each surface impoundment was not reported. Violates Board Order R6V-2015-0057 MRP II.A.1.b-d (2) Storm water sample from FCC catchments was not analyzed for Nitrate. Violates Board Order R6V-2015-0057 MRP II.E. (3) The Operation and Maintenance summary did not discuss the calibration of any wastewater flow measuring devices. Violates Board Order R6V-2015-0057 MRP II.F.3. (4) Failure to comment on whether there are any physical evidence indications of a release. Violates Board Order R6V-2015-0057 MRP III.B.1. (5) Failure to provide laboratory analytical results/reports for all laboratory analyses. Violates Board Order R6V-2015-0057 WDR III.F.2. MRP II. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115508 06/30/2020 Order Conditions (1) Failure to maintain LCRS metering equipment in good working order to achieve compliance with BO. WDR II.A.14. (2) Failure to maintain the following groundwater monitoring or extraction wells in good working order 3M-71, EXT-03, GWM-28, GWM-30, GWM-43, and GWM-60. Violates Board Order R6V-2015-0057 WDR II.A.14. (3) The freeboard of Surface Impoundments R-Pond 4 was less than 2 feet on two days throughout the 2020 1st half monitoring period. Violates Board Order R6V-2015-0057 WDR II.B.3. (4) Daily freeboard measurements were not included in the 2020 1st half monitoring report. MRP II.A.3.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1115298 03/30/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.035 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115296 03/26/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115295 03/24/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.033 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115294 03/21/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.032 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115293 03/12/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.032 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115292 03/04/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.044 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115291 03/01/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.045 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115289 02/27/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.043 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115288 02/24/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.033 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115285 02/21/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.041 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115284 02/20/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115282 02/19/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115281 02/18/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115280 02/17/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115279 02/16/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115278 02/09/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.032 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115277 02/07/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.032 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115276 02/06/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.063 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115274 02/05/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.044 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115273 02/04/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115272 02/02/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.037 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115270 02/01/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.074 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115269 01/31/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.074 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115268 01/29/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.035 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115267 01/28/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.039 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115266 01/27/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.042 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115265 01/24/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.036 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115264 01/23/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.035 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115263 01/21/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115262 01/18/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115260 01/17/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.031 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115258 01/16/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.033 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115257 01/15/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.037 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115256 01/14/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.036 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115255 01/13/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.041 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115254 01/12/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.051 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115203 10/07/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.035 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1115202 10/05/2022 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.029 MGD. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1115201 01/11/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.039 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115200 01/10/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.045 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115199 01/09/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.032 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115198 01/08/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.041 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115197 01/06/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.051 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115196 01/04/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.043 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115195 01/03/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.039 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115194 01/02/2022 OEV Flow Daily Maximum limit is 0.03 MGD and reported value was 0.056 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115193 01/01/2022 OEV Flow Daily Maximum limit is 0.003 MGD and reported value was 0.034 MGD. Violation N Report Stovepipe Wells Village 147582 96-161 N
1115192 06/12/2022 OEV Flow Daily Maximum limit is 0.021 GPD and reported value was 0.025 GPD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1115191 01/30/2023 Late Report Data for the calendar year is due on January 15th of the following year. The 3rd and 4th quarter 2022 data was due by January 15, 2023, but was submitted to GeoTracker 15 days late on January 30, 2023. Violation N Report Stovepipe Wells Village 147582 96-161 Y
1115190 06/13/2022 OEV Flow Daily Maximum limit is 0.021 GPD and reported value was 0.028 GPD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1115188 06/11/2022 OEV Flow Daily Maximum limit is 0.021 GPD and reported value was 0.026 GPD. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1115175 09/01/2021 Deficient Reporting WDR Section VII.D - Failure to issue a workplan for removal of sludge at the evaporation/oxidation ponds. A plan should be in place and be ready to take effect once the evaporation/oxidation ponds are dry and ready for solids removal. The workplan submittal date was granted an extension from March 1, 2021 to September 1, 2021. Violation N Inspection Rosamond WTF (Ponds) 425543 R6V-2019-0251 N
1115174 09/21/2021 Deficient Reporting MRP Sections IV.A.b, and c ? Failure to install the offsite monitoring wells and provide As-Built Plans of the wells. Violation N Inspection Rosamond WTF (Ponds) 425543 R6V-2019-0251 N
1115172 01/31/2023 Order Conditions WDR Attachment E, Standard Provisions Section 6 - Freeboard at aeration basins were below the freeboard limit of 24 inches. The District mentioned that they were exploring alternatives to address this issue. Violation N Inspection Rosamond WTF (Ponds) 425543 R6V-2019-0251 Y
1114704 12/15/2022 Order Conditions (1) Treated soil samples exceeded the limit of Total petroleum hydrocarbons Measures as diesel during the 2022 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 WDR I.C.1. (2) If soil sampled has contaminants at 12-inch depth, then a sample at 2-foot should be taken. The additional soil samples at 2-foot depth were not collected and analyzed during the 2022 2nd half monitoring period. Violates Board Order R6V-01-0034 WDR II.C.4 and the Sampling and Analysis Plan Violation N Report Bishop(Sunland)Class III LF 148395 01-034 Y
1114692 09/07/2022 Groundwater (1) Exceeded MCL of Nitrate and Tetrachloroethene (PCE) during the 2022 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 WDR I.A.2. b. (2) Exceeded Practical Quantitation Limit (0.5 ug/L) of 1,1-Dichloroethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane during the 2022 Semi-annual 2nd Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii. (3) Exceeded Intra-Well Control Limits of Chloride, Nitrate as N and Total Dissolved Solids during the 2022 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114625 05/16/2022 Order Conditions (1) Treated soil samples exceeded the limit of Total petroleum hydrocarbons Measures as diesel during the 2022 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 WDR I.C.1.; (2) If soil sampled has contaminants at 12-inch depth, then a sample at 2-foot should be taken. The additional soil samples at 2-foot depth were not collected and analyzed during the 2022 1st half monitoring period. Violates Board Order R6V-01-0034 WDR II.C.4 and the Sampling and Analysis Plan Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114624 02/28/2022 Groundwater (1) Exceeded MCL of Nitrate as N and Tetrachloroethene (PCE) during the 2022 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 WDR I.A.2. b.; (2) Exceeded Practical Quantitation Limit (0.5 ug/L) of 1,1-Dichloroethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane during the 2022 Semi-annual 1st Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii.; (3) Exceeded Intra-Well Control Limits of Chloride, Nitrate as N, and Total Dissolved Solids during the 2022 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114622 11/16/2021 Order Conditions (1) Treated soil samples exceeded the limit of Total petroleum hydrocarbons Measures as diesel during the 2021 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 WDR I.C.1.; (2) If soil sampled has contaminants at 12-inch depth, then a sample at 2-foot should be taken. The additional soil samples at 2-foot depth were not collected and analyzed during the 2021 2nd half monitoring period. Violates Board Order R6V-01-0034 WDR II.C.4 and the Sampling and Analysis Plan; (3) 150 cubic yards of treated soil was moved to the landfill for cover. Lab results that show the soil is below concentration limits was not provided in the 2021 2nd Half monitoring report. Violates Board Order R6V-01-0034 WDR I.C.1.; (4) Pond liner should be replaced before liquids migrate through 75% of the clay liner. Pond liner liquid migration not verified during the 2021 2nd half monitoring period. Violates Board Order R6V-01-003 WDR Finding 7. Description of Ponds; (5) The pond liner was not replaced during the sludge removal event of the 2021 2nd half monitoring period. Violates Board Order WDR I.E.5. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114621 08/31/2021 Groundwater (1) Exceeded MCL of Nitrate as N and Tetrachloroethene (PCE) during the 2021 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 WDR I.A.2. b. (2) Exceeded Practical Quantitation Limit (0.5 ug/L) of 1,1-Dichloroethane, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane during the 2021 Semi-annual 1st Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii. (3) Exceeded Intra-Well Control Limits of Nitrate as N and Total Dissolved Solids during the 2021 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114619 06/25/2021 Order Conditions (1) Treated soil samples exceeded the limit of Total petroleum hydrocarbons Measures as diesel and gasoline during the 2021 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 WDR I.C.1. (2) If soil sampled has contaminants at 12-inch depth, then a sample at 2-foot should be taken. The additional soil samples at 2-foot depth were not collected and analyzed during the 2021 1st half monitoring period. Violates Board Order R6V-01-0034 WDR II.C.4 and the Sampling and Analysis Plan. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114618 02/23/2021 Groundwater (1) Exceeded MCL of Nitrate as N and Tetrachloroethene (PCE) during the 2021 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 WDR I.A.2. b. (2) Exceeded Practical Quantitation Limit (0.5 ug/L) of 1,1-Dichloroethane, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane during the 2021 Semi-annual 1st Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii. (3) Exceeded Intra-Well Control Limits of Chloride, Nitrate as N, and Total Dissolved Solids during the 2021 Semi-annual 1st Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114612 03/10/2023 Order Conditions Ponding on the southern and western roadways and site boundaries of the site is inconsistent with the site drainage plan and Stormwater Pollution and Prevention Plan and is a violation of Section III.A.13 & Section V.E.e.II.2 of the Board Order. Observations of ponding water were observed on January 3, 2023 and March 10, 2023. Violation N Inspection Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1114611 03/10/2023 Order Conditions Palm trees observed growing in Landfill cover in January 3, 2023 and on March 10th, 2023. Water Board staff commented to WM trees should not be growing in interim cover. March 2023 inspection palm trees were observed to concentrate storm water flow and runoff and resulted in erosion of interim cover, which is a violation of Section III.A.12 of Board Order. Violation N Inspection Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1114610 03/10/2023 Order Conditions Windblown litter off site is a violation of Section III.A.4 of the Board Order. While conducting inspection a significant amount of windblown trash was piling up along fence line and was blowing to adjacent properties. Violation N Inspection Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 Y
1114514 12/01/2020 Order Conditions (1) Treated soil samples exceeded the limit of Total petroleum hydrocarbons Measures as diesel during the 2020 Semi-annual 2nd half monitoring period. Violates Board Order R6V-01-0034 WDR I.C.1. (2) If soil sampled has contaminants at 12-inch depth, then a sample at 2-foot depth should be taken. The additional soil samples at 2-foot depth were not collected and analyzed during the 2020 2nd half monitoring period. Violates Board Order R6V-01-0034 WDR II.C.4 and SAP. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114512 08/27/2020 Groundwater (1) Exceeded MCL of Nitrate as N and Tetrachloroethene (PCE) during the 2020 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 WDR I.A.2. b. (2) Exceeded Practical Quantitation Limit (0.5 ug/L) of 1,1-Dichloroethane, Dichlorodifluoromethane, Methylene chloride, Tetrachloroethene (PCE), Trichloroethene (TCE), and Trichlorofluoromethane during the 2020 Semi-annual 2nd Half monitoring Period. Violates Board Order R6V-01-0034 MRP I.A.b.ii. (3) Exceeded Intra-Well Control Limits of Chloride, Nitrate as N, and Total Dissolved Solids during the 2020 Semi-annual 2nd Half monitoring period. Violates Board Order R6V-01-0034 MRP III.B. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1114191 03/02/2022 Late Report Annual SMR ( PRETRPT ) (Annual Pretreatment Report) report for 2021 (2697119) was due on 01-MAR-22 Violation None Report Victor Valley Wastewater Reclamation Authority WTP 420359 R6V-2020-0028 N
1113989 12/31/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.138 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113988 12/28/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.169 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113985 12/21/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.097 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113982 12/20/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.135 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113981 12/11/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.225 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113979 12/12/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.225 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113978 12/26/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.142 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113975 12/10/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.388 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113973 12/05/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.085 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113972 12/02/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.238 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113965 12/01/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.099 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113964 11/29/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.155 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113957 11/28/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.106 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113956 11/27/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.118 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113953 11/26/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.136 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113951 11/24/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.260 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113950 11/21/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.201 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113949 11/19/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.095 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113947 11/18/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.083 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113945 11/16/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.143 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113943 11/15/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.173 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113941 11/12/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.211 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113931 11/11/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.211 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113930 11/10/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.082 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113927 11/06/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.196 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113926 11/05/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.106 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113907 11/04/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.082 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113906 11/03/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.164 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113905 11/02/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.164 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113904 11/01/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.097 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113902 10/30/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.117 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113901 10/27/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.083 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113900 10/24/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.096 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113899 10/23/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.111 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113898 10/21/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.199 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113881 10/19/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.091 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113880 10/05/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.085 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113879 10/03/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.083 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113878 10/01/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.086 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113877 01/30/2023 Late Report This report was due on 1/15/2023 but was not submitted until 1/30/2023. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 Y
1113875 01/30/2023 Late Report This report was due on 10/15/2022 but was not submitted until 1/30/2023. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 Y
1113870 09/17/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.093 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113869 09/15/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.103 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113868 09/13/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.101 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113867 09/11/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.100 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113866 09/07/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.083 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113865 09/05/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.096 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113864 09/03/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113863 08/12/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.084 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113862 08/06/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.093 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113861 08/05/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.093 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113860 08/01/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.097 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113859 07/24/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.096 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113858 07/14/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.082 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113857 07/12/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.086 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113850 06/26/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.086 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113849 06/06/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.103 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113848 06/05/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.088 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113846 06/03/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.093 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113845 05/31/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.101 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113844 05/29/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.093 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113843 05/28/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.109 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113840 05/27/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.091 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113839 05/22/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.115 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113838 05/19/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.144 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113837 05/17/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.106 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113836 05/16/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.093 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113826 05/15/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.081 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113825 05/13/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.092 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113824 05/12/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.089 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113823 05/11/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.088 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113822 05/10/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.120 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113821 05/06/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.085 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113819 05/04/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.101 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113818 05/03/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.084 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113817 05/01/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.097 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113736 04/25/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.096 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113735 04/24/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.096 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113734 04/20/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.121 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113733 04/18/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.125 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113732 04/14/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.095 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113731 04/13/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.125 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113730 04/11/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.081 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113728 04/08/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.106 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113727 04/06/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.091 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113726 04/05/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.111 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113725 04/03/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.108 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113724 03/27/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.084 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113723 03/31/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.114 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113722 03/30/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.083 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113721 03/29/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.081 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113720 03/24/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.106 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113719 03/18/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.224 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113717 03/17/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.352 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113716 03/16/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.095 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113715 03/15/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.185 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113711 03/14/2022 OEV Flow Daily Maximum limit is 0.08 MGD and reported value was 0.130 MGD. Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113706 05/02/2022 Late Report This report was due on 4/15/2022 but was not submitted until 5/2/2022 Violation N Report DVNM HDQ Furnace Creek WWTF 146098 86-084 N
1113600 11/22/2022 OEV Dissolved Oxygen Instantaneous Minimum limit is 1.0 mg/L and reported value was 0.97 mg/L. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 Y
1113599 11/10/2022 OEV Dissolved Oxygen Instantaneous Minimum limit is 1.0 mg/L and reported value was 0.91 mg/L. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 Y
1113598 11/01/2022 OEV pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.18 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 Y
1113597 11/10/2022 OEV pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.19 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 Y
1113596 09/09/2022 OEV pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.56 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1113595 09/09/2022 OEV pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.24 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1113594 09/29/2022 OEV pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.08 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1113575 01/19/2023 Order Conditions During a site inspection on 1/19/23, ponding was observed in some corrals, as well as elevated levels of manure in corrals following a storm event. Muddy tracks with ponding were observed and not following best management practices after a storm event. Violation N Inspection Dutch Dairy 146544 95-002 Y
1113250 06/23/2021 Order Conditions Exceedance of Water Quality Protection Standards (WQPS) specific conductance. Well VCF-2 specific conductance 1150 (WQPS (1095). Violation of WDR WQ-2015-0121-DWQ, NOA Violation None Report Victor Valley Materials Recovery Facility & Transfer Station 424977 2015-0121-DWQ Y
1113249 09/20/2021 Order Conditions Exceedance of Water Quality Protection Standards (WQPS) specific conductance, turbidity, TDS, and chloride. Well VCF-2 specific conductance 1000 (WQPS 1095), TDS 710 mg/L (WQPS 705.7 mg/L), chloride 140 mg/L (WQPS 130 mg/L). Violation of WDR WQ-2015-0121-DWQ, NOA Violation None Report Victor Valley Materials Recovery Facility & Transfer Station 424977 2015-0121-DWQ Y
1113248 11/11/2021 Order Conditions Exceedance of Water Quality Protection Standards (WQPS) specific conductance, turbidity, TDS, and chloride. Well VCF-1 specific conductance 1100 (WQPS 1091). Well VCF-2 specific conductance 1270 (WQPS (1095), TDS 780 mg/L (WQPS 705.7 mg/L), chloride 150 mg/L (WQPS 130 mg/L). Violation of WDR WQ-2015-0121-DWQ, NOA Violation N Report Victor Valley Materials Recovery Facility & Transfer Station 424977 2015-0121-DWQ Y
1113116 05/20/2022 Order Conditions During this quarter testing was conducted, all requirements were met for effluent besides; Biochemical Oxygen Demand, Chemical Oxygen Demand, Methylene Blue Active Substances, Dissolved Oxygen, and Oil & Grease. During this quarter testing was conducted, all requirements were met for influent besides; Biochemical Oxygen Demand. Violation N Report Jack in The Box Restaurant No 3588 204383 97-010-DWQ N
1113115 12/12/2022 Late Report Section II.B.1 states, ¿Quarterly monitoring reports containing the above requires information shall be submitted to the Regional Board beginning on October 15, 2002. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following the end of each quarter.¿ The Q3 2022 monitoring report was due 10/15/2022 but was not submitted until 12/12/2022 making the report 58 days late. Violation N Report Jack in The Box Restaurant No 3588 204383 97-010-DWQ Y
1113112 04/28/2022 Late Report Section II.B.1 states, ¿Quarterly monitoring reports containing the above requires information shall be submitted to the Regional Board beginning on October 15, 2002. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following the end of each quarter.¿ The Q1 2022 monitoring report was due 4/15/2022 but was not submitted until 4/28/2022 making the report 13 days late.*" Violation N Report Jack in The Box Restaurant No 3588 204383 97-010-DWQ N
1113111 04/28/2022 Late Report Section II.B.1 states, ¿Quarterly monitoring reports containing the above requires information shall be submitted to the Regional Board beginning on October 15, 2002. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following the end of each quarter.¿ The Q4 2021 monitoring report was due 1/15/2022 but was not submitted until 4/28/2022 making the report 103 days late. Violation N Report Jack in The Box Restaurant No 3588 204383 97-010-DWQ N
1113110 12/27/2021 Late Report Section II.B.1 states, ¿Quarterly monitoring reports containing the above requires information shall be submitted to the Regional Board beginning on October 15, 2002. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following the end of each quarter.¿ The Q3 2021 monitoring report was due 10/15/2021 but was not submitted until 12/27/2021 making the report 73 days late. Violation N Report Jack in The Box Restaurant No 3588 204383 97-010-DWQ N
1113109 08/19/2021 Late Report Section II.B.1 states, ¿Quarterly monitoring reports containing the above requires information shall be submitted to the Regional Board beginning on October 15, 2002. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following the end of each quarter.¿ The Q2 2021 monitoring report was due 7/15/2021 but was not submitted until 8/19/2021 making the report 35 days late. Violation N Report Jack in The Box Restaurant No 3588 204383 97-010-DWQ N
1113108 05/18/2021 Late Report Section II.B.1 states, "Quarterly monitoring reports containing the above requires information shall be submitted to the Regional Board beginning on October 15, 2002. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following the end of each quarter." The Q1 2021 monitoring report was due 4/15/2021 but was not submitted until 5/18/2021 making the report 33 days late. Violation N Report Jack in The Box Restaurant No 3588 204383 97-010-DWQ N
1111873 11/30/2021 Deficient Reporting For the 2021 4th Quarter Monitoring Report, the month of November was not submitted. Violation N Report Willow Springs MHP 132105 02-021 N
1111872 12/31/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average (Mean) limit is 30.0 mg/L and reported value was 46.32 mg/L. Violation N Report Willow Springs MHP 132105 02-021 N
1111871 12/14/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Single Sample Maximum limit is 45.0 mg/L and reported value was 65.0 mg/L. Violation N Report Willow Springs MHP 132105 02-021 N
1111864 02/17/2022 Late Report This quarterly monitoring report was due on 1/15/2022 but was not submitted until 2/17/2022, making this report 33 days late. Violation N Report Willow Springs MHP 132105 02-021 N
1111863 10/31/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average (Mean) limit is 30.0 mg/L and reported value was 93.0 mg/L. Violation N Report Willow Springs MHP 132105 02-021 N
1111862 10/25/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Single Sample Maximum limit is 45.0 mg/L and reported value was 200.0 mg/L. Violation N Report Willow Springs MHP 132105 02-021 N
1111852 07/31/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average (Mean) limit is 30.0 mg/L and reported value was 57.0 mg/L. Violation N Report Willow Springs MHP 132105 02-021 N
1111851 07/26/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Single Sample Maximum limit is 45.0 mg/L and reported value was 120.0 mg/L. Violation N Report Willow Springs MHP 132105 02-021 N
1109905 11/09/2022 Sanitary Sewer Overflow/Spill/ Type: Category 2. Air Relief Valve (ARV)/Blow-Off Valve (BOV) Failure caused 21000.0 gallons of sewage to spill from Other sewer system structure;Vault for air release valve at Hwy 173 just North of Shooting range to Unpaved surface. No surface water body affected. Violation N SSO Lake Arrowhead Community Services District Collection Sytem 367835 R6V-2009-0037 N
1109859 11/05/2022 Sanitary Sewer Overflow/Spill/ Type: Category 3. Root Intrusion;The spill cause was due to root intrusion and FOG. caused 700.0 gallons of sewage to spill from Lateral Clean Out (Private) at 12990 Clallam Road to Unpaved surface. No surface water body affected. Violation N SSO Town of Apple Valley Wastewater Dept. CS 322255 2022-0103-DWQ Y
1109148 10/10/2022 Unauthorized Discharge Significant wind blow trash piled up against fencing/litter fencing. Primarily on the north, northeastern extent of landfill fencing. Violation N Inspection Benton Crossing Landfill 147577 96-156 Y
1108672 06/29/2021 Late Report Section II.B.1 states, ¿The monthly report shall be submitted to the Water Board by the first working day of the second month following each monthly monitoring period.¿ This April monitoring report was due on June 1st, 2021, and was not submitted until June 29th, 2021, making the report 28 days late. Violation N Report VVWRA- Sub-Regional Plant-Hesperia 377320 R6V-2013-0005 N
1108671 08/26/2022 Late Report Section II.A states submittal period requirements. These requirements state, ¿Beginning on the 15th of the month following the first quarter after the adoption for this permit, a monitoring report including the preceding information shall be submitted to the Board. Subsequent monitoring reports shall be submitted to the Board by the 15th day month following each quarter.¿ This report was due on 4/15/2022 and has yet to be submitted. Quarterly monitoring report was submitted 133 days late from the due date to the submission date. Violation N Report Rock Creek Area WTP 146146 92-107 Y
1108670 08/26/2022 Late Report Section II.A states submittal period requirements. These requirements state, ¿Beginning on the 15th of the month following the first quarter after the adoption for this permit, a monitoring report including the preceding information shall be submitted to the Board. Subsequent monitoring reports shall be submitted to the Board by the 15th day month following each quarter.¿ This report was due on 7/15/2022 and was not submitted until 8/26/2022. Quarterly monitoring report was submitted 42 days late from the due date to the submission date. Violation N Report Rock Creek Area WTP 146146 92-107 Y
1108669 01/31/2022 CAT1 Nitrogen, Total (as N) Monthly Mean limit is 8.0 mg/L and reported value was 8.6 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108668 03/26/2022 CAT1 Nitrogen, Total (as N) Daily Maximum limit is 10.0 mg/L and reported value was 11.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108667 01/05/2022 CAT1 Nitrogen, Total (as N) Daily Maximum limit is 10.0 mg/L and reported value was 11.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108666 01/01/2022 CAT1 Nitrogen, Total (as N) Daily Maximum limit is 10.0 mg/L and reported value was 11.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108664 10/31/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average limit is 20.0 mg/L and reported value was 21.7 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108663 10/13/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Daily Maximum limit is 30.0 mg/L and reported value was 34.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108662 10/02/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Daily Maximum limit is 30.0 mg/L and reported value was 35.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108661 12/31/2021 CAT1 Nitrogen, Total (as N) Monthly Mean limit is 8.0 mg/L and reported value was 8.8 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108660 12/28/2021 CAT1 Nitrogen, Total (as N) Daily Maximum limit is 10.0 mg/L and reported value was 14.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108659 12/22/2021 CAT1 Nitrogen, Total (as N) Daily Maximum limit is 10.0 mg/L and reported value was 15.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108658 09/30/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average (Mean) limit is 20.0 mg/L and reported value was 21.2 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108657 08/31/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average (Mean) limit is 20.0 mg/L and reported value was 23.5 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108653 09/25/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Daily Maximum limit is 30.0 mg/L and reported value was 37.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108652 07/31/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average limit is 20.0 mg/L and reported value was 28.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108651 08/21/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Daily Maximum limit is 30.0 mg/L and reported value was 31.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108649 08/14/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Daily Maximum limit is 30.0 mg/L and reported value was 47.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108648 07/17/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Daily Maximum limit is 30.0 mg/L and reported value was 41.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108647 07/14/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Daily Maximum limit is 30.0 % and reported value was 40.0 %. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108646 07/03/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Daily Maximum limit is 30.0 mg/L and reported value was 35.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108644 07/31/2021 CAT1 Nitrogen, Total (as N) Monthly Mean limit is 8.0 mg/L and reported value was 9.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108643 07/31/2021 CAT1 Nitrogen, Total (as N) Daily Maximum limit is 10.0 mg/L and reported value was 12.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108642 07/17/2021 CAT1 Nitrogen, Total (as N) Daily Maximum limit is 10.0 mg/L and reported value was 11.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108641 07/03/2021 CAT1 Nitrogen, Total (as N) Daily Maximum limit is 10.0 mg/L and reported value was 15.0 mg/L. Violation N Report Lake Arrowhead CSD WTFS 367835 R6V-2009-0037 N
1108640 08/03/2022 Late Report Section II.F states, ¿Semi-annual monitoring reports including the preceding information shall be submitted to the Regional Board by the 15th day of the month following each semi-annual period.¿ This report was due 10/15/2021 but was not submitted until 8/3/2022, making this report 292 days late. Violation N Report June Mtn Ski Area Chalet 146723 99-035 Y
1108639 04/19/2021 Late Report Section II.F states, ¿Semi-annual monitoring reports including the preceding information shall be submitted to the Regional Board by the 15th day of the month following each semi-annual period.¿ This report was due 10/15/2020 but was not submitted until 4/19/2021, making this report 186 days late. Violation N Report June Mtn Ski Area Chalet 146723 99-035 N
1108330 11/01/2021 Late Report : Section II.B. states, ¿Beginning on the 15th day of the month following the adoption of this Order, a monitoring report including the preceding information shall be submitted to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day of the month following each quarter.¿ The Q3 2021 monitoring report was due 10/15/2021 but was not submitted until 11/1/2021. Making this report 17 days late. Violation N Report Barstow/Daggett Airport WTF 146725 99-037 N
1108329 02/23/2021 Late Report : Section II.B. states, ¿Beginning on the 15th day of the month following the adoption of this Order, a monitoring report including the preceding information shall be submitted to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day of the month following each quarter.¿ The Q4 2020 monitoring report was due 1/15/2021 but was not submitted until 2/23/2021. Making this report 39 days late. Violation N Report Barstow/Daggett Airport WTF 146725 99-037 N
1108279 10/29/2021 Late Report Section II.C states, ¿Beginning on January 15, 1997, a monitoring report including the preceding information shall be submitted to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day of the month following each quarter.¿ This report was due 10/15/2021 but was not submitted until 10/29/2021, making it 14 days late. Violation N Report Owens Valley Conser Camp WTF 147575 96-053 N
1108278 07/22/2021 Late Report Section II.C states, ¿Beginning on January 15, 1997, a monitoring report including the preceding information shall be submitted to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day of the month following each quarter.¿ This report was due 4/15/2021 but was not submitted until 7/22/2021, making it 98 days late. Violation N Report Owens Valley Conser Camp WTF 147575 96-053 N
1108277 07/22/2021 Late Report Section II.C states, ¿Beginning on January 15, 1997, a monitoring report including the preceding information shall be submitted to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day of the month following each quarter.¿ This report was due 4/15/2020 but was not submitted until 7/22/2021, making it 463 days late. Violation N Report Owens Valley Conser Camp WTF 147575 96-053 N
1108276 03/02/2022 CAT1 Nitrate, Total (as NO3) Monthly Maximum limit is 10.0 mg/L and reported value was 15.0 mg/L. Violation N Report Rovana Housing Package STP 146107 86-111 N
1108275 01/07/2022 Late Report According to the WDRs, Pg. 9 Section II states reporting requirements. These requirements state, ¿Beginning on January 15, 1987, quarterly monitoring reports including the preceding information shall be submitted to the Board by the 15th day of the month following each quarter.¿ This report was due on 10/15/2021 but not submitted until 1/7/2022. Violation N Report Rovana Housing Package STP 146107 86-111 N
1108271 01/07/2022 Late Report Section II states reporting requirements. These requirements state, ¿Beginning on January 15, 1987, quarterly monitoring reports including the preceding information shall be submitted to the Board by the 15th day of the month following each quarter.¿ This report was due on 7/15/2021 but not submitted until 1/7/2022. Violation N Report Rovana Housing Package STP 146107 86-111 N
1108269 04/07/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 45.0 mg/L and reported value was 57.2 mg/L. Violation N Report Rovana Housing Package STP 146107 86-111 N
1108266 03/03/2021 CAT1 Nitrate, Total (as NO3) Monthly Maximum limit is 10.0 mg/L and reported value was 12.0 mg/L. Violation N Report Rovana Housing Package STP 146107 86-111 N
1108264 01/07/2022 Late Report Section II states reporting requirements. These requirements state, ¿Beginning on January 15, 1987, quarterly monitoring reports including the preceding information shall be submitted to the Board by the 15th day of the month following each quarter.¿ This report was due on 1/15/2021 but not submitted until 1/7/2022 Violation N Report Rovana Housing Package STP 146107 86-111 N
1108080 06/21/2022 Deficient Monitoring Soil gas not tested for Carbon Dioxide, Nitrogen, and Methane during the 2022 1st half Semi-annual monitoring period. Violates Board Order R6V-2009-0018 WDR Provision IV.D and MRP I.C.1. Violation N Report Chalfant Class III Landfill 366583 R6V-2009-0018 Y
1108076 06/21/2022 Groundwater Exceeded PQL for Tetrachloroethene (PCE) and Trichlorofluoromethane during the 2022 1st half Semi-annual monitoring period. Violates Board Order R6V-2009-0018 WDR Requirements II.A.10, II.A.11, MRP I.B.3.d. ii. Violation N Report Chalfant Class III Landfill 366583 R6V-2009-0018 Y
1108075 12/06/2021 Deficient Monitoring Soil gas not tested for Carbon Dioxide, Nitrogen, and VOCs during the 2021 2nd half Semi-annual monitoring period. Violates Board Order R6V-2009-0018 WDR Provision IV.D and MRP I.C.1. Violation N Report Chalfant Class III Landfill 366583 R6V-2009-0018 N
1108074 12/06/2021 Groundwater Exceeded MDL for Tetrachloroethene (PCE) and Trichlorofluoromethane during the 2021 2nd half Semi-annual monitoring period. Violates Board Order R6V-2009-0018 WDR Requirements II.A.10, II.A.11, MRP I.B.3.d. ii. Violation N Report Chalfant Class III Landfill 366583 R6V-2009-0018 N
1107939 08/18/2020 Groundwater (1) Exceeded background limits of 1,1-Dichloroethane and Dichlorodifluoromethane during the 2020 2nd Half Semi-Annual monitoring period. Violated R6V-2012-0042 MRP III.B.5. b (2) Exceeded MCL for Nitrate as N and SMCL for Chloride, Iron, Manganese, Sulfate, Total Dissolved Solids during the 2020 2nd Half Semi-Annual monitoring period. Violated R6V-2012-0042 WDR II.A.13 Violation N Report Antelope Valley Public Landfill 383527 R6V-2012-0042 N
1107283 03/29/2022 OEV Total Coliform Not to exceed a specific limit more than once within any 30-day period. limit is 23 MPN/100 mL and reported value was 79 MPN/100 mL. Violation N Report Fort Irwin WTF 132500 04-005 N
1107169 03/20/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 190.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107168 03/02/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 120.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107167 03/30/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 240.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107162 03/30/2022 Deficient Reporting Section I.A.1 states, ¿The following shall be recorded: The average flowrate, in gallons per day, of wastewater to the treatment facility calculated for each month.¿ The monthly flow rate was not given in the quarterly monitoring reports. Violation N Report Bear Valley Firestone 146391 88-001 N
1107146 12/22/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 200.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107145 11/17/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 300.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107144 10/27/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 240.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107143 01/04/2022 Deficient Reporting Section I.A.1 states, ¿The following shall be recorded: The average flowrate, in gallons per day, of wastewater to the treatment facility calculated for each month.¿ The monthly flow rate was not given in the quarterly monitoring reports. Violation N Report Bear Valley Firestone 146391 88-001 N
1107142 10/03/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 160.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107141 08/18/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 290.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107140 08/03/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 140.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107139 10/15/2021 Deficient Reporting Section I.A.1 states, ¿The following shall be recorded: The average flowrate, in gallons per day, of wastewater to the treatment facility calculated for each month.¿ The monthly flow rate was not given in the quarterly monitoring reports. Violation N Report Bear Valley Firestone 146391 88-001 N
1107138 06/16/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 233.3 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107136 04/07/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 220.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107135 06/22/2021 Deficient Reporting Section I.A.1 states, ¿The following shall be recorded: The average flowrate, in gallons per day, of wastewater to the treatment facility calculated for each month.¿ The monthly flow rate was not given in the quarterly monitoring reports. Violation N Report Bear Valley Firestone 146391 88-001 N
1107134 03/10/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 190.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107133 02/09/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 50.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107132 12/29/2020 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 34.0 mg/L. Violation N Report Bear Valley Firestone 146391 88-001 N
1107131 03/16/2021 Deficient Reporting Section I.A.1 states, ¿The following shall be recorded: The average flowrate, in gallons per day, of wastewater to the treatment facility calculated for each month.¿ The monthly flow rate was not given in the quarterly monitoring reports. Violation N Report Bear Valley Firestone 146391 88-001 N
1107130 05/20/2021 OEV Dissolved Oxygen Instantaneous Minimum limit is 1.0 mg/L and reported value was 0.97 mg/L. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1107129 08/19/2021 OEV Dissolved Oxygen Instantaneous Minimum limit is 1.0 mg/L and reported value was 0.87 mg/L. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1107128 09/08/2021 OEV Dissolved Oxygen Instantaneous Minimum limit is 1.0 mg/L and reported value was 0.96 mg/L. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1107127 08/12/2021 OEV Dissolved Oxygen Instantaneous Minimum limit is 1.0 mg/L and reported value was 0.78 mg/L. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1107126 06/24/2021 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.61 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1107125 09/30/2021 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.18 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1107097 06/24/2021 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.75 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1107096 06/30/2021 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.1 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1107095 08/03/2022 Late Report Section II.B states, ¿By January 30, 2001 and each year thereafter, the Discharger shall submit an annual report summarizing the previous year¿s monitoring data using graphs and tables.¿ This Annual Report was due 1/30/2022 but was not submitted until 8/3/2022, making this report 185 days late. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1107094 05/17/2022 Late Report Section III.A states, ¿Quarterly reports must be submitted to the Water board in accordance with the following schedule¿¿ The First Quarterly Monitoring Report, January 1 ¿ March 31, is due May 1st. This monitoring report was due 5/1/2022 but was not submitted until 5/17/2022, making this report 16 days late. Violation N Report Helendale Silverlakes STP 403017 R6V-2018-0015 N
1107093 05/25/2021 Late Report Section III.A states, ¿Quarterly reports must be submitted to the Water Board in accordance with the following schedule¿¿ The First Quarterly Monitoring Report, January 1 ¿ March 31, is due May 1st. This monitoring report was due 5/1/2021 but was not submitted until 5/25/2021, making this report 24 days late. Violation N Report Helendale Silverlakes STP 403017 R6V-2018-0015 N
1106967 02/15/2022 Deficient Reporting According to the WDRs, Pg. 12 Section I.B. states effluent reporting requirements. These requirements state, ¿Grab samples of the effluent discharged to the first pond from which percolation can occur, shall be collected and analyzed to determine the magnitude of the following parameters.¿ pH and Dissolved Oxygen must be recorded weekly according to the Board Order. The lab reports for Ponds A ¿ D, during the month of November, do not include the required pH and Dissolved Oxygen as required by the Board Order. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1106966 02/15/2022 Late Report According to the WDRs, Pg. 14 Section II.B. states submittal period requirements. These requirements state, ¿Quarterly Monitoring Reports containing the above-required information shall be submitted to the Regional Board by the 15th day following the end of each quarter.¿ This report was due on 1/15/2022 but not submitted until 2/15/2022. For the late report violation, monitoring report was submitted 31 days late from the due date to the submission date. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1106861 03/11/2022 Late Report Section II.A states submittal period requirements. These requirements state, ¿Beginning on the 15th of the month following the first quarter after the adoption for this permit, a monitoring report including the preceding information shall be submitted to the Board. Subsequent monitoring reports shall be submitted to the Board by the 15th day month following each quarter.¿ This report was due on 1/15/2022 but not submitted until 3/11/2022. Quarterly monitoring report was submitted 55 days late from the due date to the submission date. Violation N Report Rock Creek Area WTP 146146 92-107 N
1106860 03/11/2022 Late Report Section II.A states submittal period requirements. These requirements state, ¿Beginning on the 15th of the month following the first quarter after the adoption for this permit, a monitoring report including the preceding information shall be submitted to the Board. Subsequent monitoring reports shall be submitted to the Board by the 15th day month following each quarter.¿ This report was due on 10/15/2021 but not submitted until 3/11/2022. Quarterly monitoring report was submitted 147 days late from the due date to the submission date. Violation N Report Rock Creek Area WTP 146146 92-107 N
1106859 07/27/2021 Late Report Section II.A states submittal period requirements. These requirements state, ¿Beginning on the 15th of the month following the first quarter after the adoption for this permit, a monitoring report including the preceding information shall be submitted to the Board. Subsequent monitoring reports shall be submitted to the Board by the 15th day month following each quarter.¿ This report was due on 7/15/2021 but not submitted until 7/27/2021. Quarterly monitoring report was submitted 12 days late from the due date to the submission date. Violation N Report Rock Creek Area WTP 146146 92-107 N
1106858 07/27/2021 Late Report Section II.A states submittal period requirements. These requirements state, ¿Beginning on the 15th of the month following the first quarter after the adoption for this permit, a monitoring report including the preceding information shall be submitted to the Board. Subsequent monitoring reports shall be submitted to the Board by the 15th day month following each quarter.¿ This report was due on 4/15/2021 but not submitted until 7/27/2021. Quarterly monitoring report was submitted 103 days late from the due date to the submission date. Violation N Report Rock Creek Area WTP 146146 92-107 N
1106796 09/16/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 45.0 mg/L and reported value was 70.0 mg/L. Violation N Report Phelan Shopping Center 146404 89-001 N
1106795 05/07/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 45.0 mg/L and reported value was 110.0 mg/L. Violation N Report Phelan Shopping Center 146404 89-001 N
1106794 08/20/2021 Late Report Section II. states submittal period requirements. These requirements state, ¿Beginning on April 15, 1989, quarterly monitoring reports including the preceding information shall be submitted to the Board by the 15th day of the month following each quarter.¿ This report was due on 7/15/2021 but not submitted until 8/20/2021. Quarterly monitoring report was submitted 36 days late from the due date to the submission date. Violation N Report Phelan Shopping Center 146404 89-001 N
1106793 10/30/2021 Late Report According to WDRs, pg. 15 section II.B states submittal period requirements. This section states, ¿By not later April 15, 1995, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter.¿ This quarterly monitoring report was submitted on 10/30/2021, which is 15 days late from the due date of 10/15/2021. Violation N Report Big Pine STP 146559 95-035 N
1106684 01/01/2022 Deficient Monitoring Failed to provide results for several parameters related to flow monitoring, effluent quality, and surface water quality. Violated Board Order No. RV6-01-41 section I.C.1,2,3,4,5,6. Reported Values - Daily and Total Flows Estimated. Title 22 Recycled Water Monitoring Failure Instrumentation for continual monitoring of Title 22 Compliance is offline. 1. Continual CT is not available 2. Continual Chlorine Residual is not available 3. Continual Turbidity Monitoring is not available 4. Automatic Bypass system is not operational Violation N Report Edwards AFB WTF 148405 01-041 N
1106627 01/13/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 30.0 mg/L and reported value was 73.0 mg/L. Violation N Report Rolling Green Terrace WTF 146117 87-010 N
1106626 01/23/2022 Deficient Reporting Section I.A.2 states discharge specifications requirements. These requirements state, ¿The average flowrate, in million gallons per day (mgd), of wastewater to the treatment facility calculated for each quarter.¿ Flow monitoring was not given in this monitoring report. Violation N Report Rolling Green Terrace WTF 146117 87-010 N
1106624 01/16/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 30.0 mg/L and reported value was 73.0 mg/L. Violation N Report Rolling Green Terrace WTF 146117 87-010 N
1106623 01/16/2022 Deficient Reporting Section I.A.2 states discharge specifications requirements. These requirements state, ¿The average flowrate, in million gallons per day (mgd), of wastewater to the treatment facility calculated for each quarter.¿ Flow monitoring was not given in this monitoring report. Violation N Report Rolling Green Terrace WTF 146117 87-010 N
1106620 09/29/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 30.0 mg/L and reported value was 40.0 mg/L. Violation N Report Rolling Green Terrace WTF 146117 87-010 N
1106619 01/16/2022 Late Report Section II. states submittal period requirements. These requirements state, ¿Beginning on April 15, 1987, quarterly monitoring reports including the preceding information shall be submitted to the Board by the 15th day of the month following each quarter.¿ This report was due on 10/15/2021 but not submitted until 1/16/2022. Quarterly monitoring report was submitted 93 days late from the due date to the submission date. Violation N Report Rolling Green Terrace WTF 146117 87-010 N
1106618 01/16/2021 Deficient Reporting Section I.A.2 states discharge specifications requirements. These requirements state, ¿The average flowrate, in million gallons per day (mgd), of wastewater to the treatment facility calculated for each quarter.¿ Flow monitoring was not given in this monitoring report. Violation N Report Rolling Green Terrace WTF 146117 87-010 N
1106617 01/16/2022 Late Report Section II. states submittal period requirements. These requirements state, ¿Beginning on April 15, 1987, quarterly monitoring reports including the preceding information shall be submitted to the Board by the 15th day of the month following each quarter.¿ This report was due on 7/15/2021 but not submitted until 1/16/2022. Quarterly monitoring report was submitted 185 days late from the due date to the submission date. Violation N Report Rolling Green Terrace WTF 146117 87-010 N
1106616 01/16/2022 Deficient Reporting Section I.A.2 states discharge specifications requirements. These requirements state, ¿The average flowrate, in million gallons per day (mgd), of wastewater to the treatment facility calculated for each quarter.¿ Flow monitoring was not given in this monitoring report. Violation N Report Rolling Green Terrace WTF 146117 87-010 N
1106615 01/14/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 30.0 mg/L and reported value was 60.0 mg/L. Violation N Report Rolling Green Terrace WTF 146117 87-010 N
1106614 07/07/2021 Deficient Reporting Section I.A.2 states discharge specifications requirements. These requirements state, ¿The average flowrate, in million gallons per day (mgd), of wastewater to the treatment facility calculated for each quarter.¿ Flow monitoring was not given in this monitoring report. Violation N Report Rolling Green Terrace WTF 146117 87-010 N
1106613 07/07/2021 Deficient Reporting Section I.A.2 states discharge specifications requirements. These requirements state, ¿The average flowrate, in million gallons per day (mgd), of wastewater to the treatment facility calculated for each quarter.¿ Flow monitoring was not given in this monitoring report. Violation N Report Rolling Green Terrace WTF 146117 87-010 N
1106467 07/26/2021 Groundwater (1) Exceeded the Upper Tolerance Limits Alkalinity as CaCO3, Bicarbonate as HCO3, Calcium, Chloride, Magnesium, Nitrogen, Nitrate (as N), Sodium, Sulfate, Total Dissolved Solids during the 2021 2nd Half Semi Annual monitoring period. Violates Board Order R6V-2006-0026 MRP I.B.3.(2) Exceeded MDL of 1,1-Dichloroethane, 1,4-Dichlorobenzene, Benzene, Chlorobenzene, Chloroform, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Phenol, Tetrachloroethene (PCE), Toluene, Trichloroethene (TCE), Trichlorofluoromethane, and Vinyl chloride during the 2021 2nd Half Semi Annual monitoring period. Violates Board Order R6V-2006-0026 MRP I.B.3. c. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 N
1106465 01/08/2021 Groundwater (1) Exceeded the Upper Tolerance Limits Alkalinity as CaCO3, Bicarbonate as HCO3, Calcium, Chloride, Magnesium, Nitrogen, Nitrate (as N), Sodium, Sulfate, Total Dissolved Solids during the 2021 1st Half Semi Annual monitoring period. Violates Board Order R6V-2006-0026 MRP I.B.3. (2) Exceeded MDL of 1,1-Dichloroethane, 1,4-Dichlorobenzene, Benzene, Chlorobenzene, Chloroform, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Phenol, Styrene, Tetrachloroethene (PCE), Trichloroethene (TCE), Trichlorofluoromethane, Vinyl chloride during the 2021 1st Half Semi Annual monitoring period. Violates Board Order R6V-2006-0026 MRP I.B.3. c. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 N
1106463 07/27/2020 Groundwater (1) Exceeded the Upper Tolerance Limits Alkalinity as CaCO3, Bicarbonate as HCO3, Calcium, Chloride, Magnesium, Nitrogen, Nitrate (as N), Sodium, Sulfate, Total Dissolved Solids during the 2020 2nd Half Semi Annual monitoring period. Violates Board Order R6V-2006-0026 MRP I.B.3. (2) Exceeded MDL of 1,1-Dichloroethane,1,4-Dichlorobenzene, 2,4-Dimethylphenol, Acetone, Chlorobenzene, Chloroform, Chloromethane, cis-1,2-Dichloroethene, Dichlorodifluoromethane, Phenol, Styrene, Tetrachloroethene (PCE), Trichloroethene (TCE), Trichlorofluoromethane during the 2020 2nd Half Semi Annual monitoring period. Violates Board Order R6V-2006-0026 MRP I.B.3. c. Violation N Report Lenwood-Hinkley-Landfill 306708 R6V-2006-0026 N
1106353 01/31/2022 Late Report 2021 Annual SMR was due on 1/30/2022, but was not turned in. Violated Board Order No. R6V-97-95 MRP II. Violation None Inspection Baker WTF 147595 97-095 N
1106311 07/15/2022 CAT1 Methylene Blue Active Substances (MBAS) Monthly Maximum limit is 2.0 mg/L and reported value was 10.0 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 Y
1106310 07/15/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 45.0 mg/L and reported value was 427.0 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 Y
1106309 04/16/2022 Deficient Reporting Discharger stated in their monitoring report that the quarterly reporting requirements were omitted from the quarter 1 report of 2022 but did not state why. Discharger also missed sampling for the month of February. Violation N Report Downtown Burger, Phelan 146149 93-016 N
1106307 04/16/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 45.0 mg/L and reported value was 560.0 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 N
1106302 10/18/2021 CAT1 Methylene Blue Active Substances (MBAS) Monthly Maximum limit is 2.0 mg/L and reported value was 7.4 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 N
1106301 01/15/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 45.0 mg/L and reported value was 1396.667 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 N
1106298 07/19/2021 CAT1 Methylene Blue Active Substances (MBAS) Monthly Maximum limit is 2.0 mg/L and reported value was 69.0 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 N
1106297 10/15/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 45.0 mg/L and reported value was 593.0 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 N
1106296 04/19/2021 CAT1 Methylene Blue Active Substances (MBAS) Monthly Maximum limit is 2.0 mg/L and reported value was 48.0 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 N
1106294 07/15/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 45.0 mg/L and reported value was 877.0 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 N
1106292 04/15/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 45.0 mg/L and reported value was 816.67 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 N
1106074 05/01/2022 Late Report According to the WDR, Pg. 14 Section II.B. states submittal period requirements. These requirements state, ¿Quarterly Monitoring Reports containing the above-required information shall be submitted to the Regional Board by the 15th day following the end of each quarter.¿ This report was due on 4/15/2022 but not submitted until 5/1/2022. monitoring report was submitted 16 days late from the due date to the submission date. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1106073 10/19/2021 OEV Dissolved Oxygen Instantaneous Minimum limit is 1.0 mg/L and reported value was 0.78 mg/L. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1106072 10/19/2021 OEV pH Single Sample Maximum limit is 9.0 SU and reported value was 9.75 SU. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1106071 10/19/2021 Late Report According to the WDR, Pg. 14 Section II.B. states submittal period requirements. These requirements state, ¿Quarterly Monitoring Reports containing the above-required information shall be submitted to the Regional Board by the 15th day following the end of each quarter.¿ This report was due on 7/15/2021 but not submitted until 10/19/2021. Monitoring report was submitted 96 days late from the due date to the submission date. Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1106070 05/19/2021 Late Report This report was due on 1/30/2021 but not submitted until 5/19/2021, making it 109 days late from the due date to the submission date Violation N Report Mammoth Mtn Ski Area WTF 147525 00-017 N
1106069 11/12/2020 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average (Mean) limit is 30.0 mg/L and reported value was 36.0 mg/L. Violation N Report Los Ranchos MHP 145807 85-038 N
1106068 10/30/2020 OEV Dissolved Oxygen Daily Minimum limit is 1.0 mg/L and reported value was 0.67 mg/L. Violation N Report Los Ranchos MHP 145807 85-038 N
1105975 05/26/2022 Unauthorized Discharge unpermitted cannabis cultivation site Violation None Inspection Arturo Medina Property 448121 None Y
1105974 05/26/2022 Unauthorized Discharge unpermitted cannabis cultivation site Violation None Inspection Trudream Properties LLC Property 448122 None Y
1105973 05/26/2022 Unauthorized Discharge unpermitted cannabis cultivation site Violation None Inspection Cruz Urrutia Property 448123 None Y
1105972 05/25/2022 Unauthorized Discharge unpermitted cannabis cultivation site Violation None Inspection PNW Holdings LLC Property 448124 None N
1105971 05/25/2022 Unauthorized Discharge unpermitted cannabis cultivation site Violation None Inspection PNW Holdings LLC Property 448125 None Y
1105955 05/26/2022 Unauthorized Discharge unpermitted cannabis cultivation site Violation None Inspection Sigifredo Diaz Property 448120 None Y
1105948 05/26/2022 Unauthorized Discharge unpermitted cannabis cultivation site Violation None Inspection Farahmand Shamouil Property 448118 None Y
1105947 05/24/2022 Unauthorized Discharge Unpermitted cannabis cultivation site Violation None Inspection Caldera Property 448117 None Y
1105946 05/24/2022 Unauthorized Discharge Unpermitted cannabis cultivation site. Violation None Inspection Mario Villa Property 448114 None Y
1105933 11/12/2021 Groundwater Exceeded the MCL of Chromium, Nitrate, and Nitrate as NO3 and exceeded background concentrations for Hexavalent Chromium during the 2019 2nd Half monitoring period. Violates Board Order 6-01-54 WDR I.A. Violation N Report Mojave Plant-Calif Portland 148479 01-054 N
1105932 06/01/2021 Groundwater Exceeded the MCL of Chromium, Nitrate as NO3 and SMCL Chloride, Sulfate, Total Dissolved Solids during the 2021 1st Half monitoring period. Violates Board Order 6-01-54 WDR I.A. Violation N Report Mojave Plant-Calif Portland 148479 01-054 N
1105931 10/19/2020 Groundwater Exceeded the MCL of Chromium, Nitrate as NO3, and pH and SMCL Chloride, Sulfate, Total Dissolved Solids during the 2020 2nd Half monitoring period. Violates Board Order 6-01-54 WDR I.A. Violation N Report Mojave Plant-Calif Portland 148479 01-054 N
1105930 05/24/2022 Unauthorized Discharge Unpermitted cannabis cultivation site. Violation None Inspection Avila and Coronado Property 448093 None Y
1105895 03/01/2022 Order Conditions A low volume spill occurred by a blockage to one of the plants motors. This is a violation of Board Order No. 6-84-58 Section I.C.1: "There shall be no discharge, bypass, or diversion of raw or partially treated sewage, sewage sludge, grease or oils from the collection, transport, treatment or disposal facilities to adjacent land areas or surface waters." Violation N Inspection Bear Valley MHP WTF 145753 84-058 N
1105894 03/08/2022 Order Conditions 500-800 gallons of sewer waste spilled over at the package treatment plant. Spill was caused by faulty pit valves. This is a violation of Board Order No. 6-84-58 Section I.C.1: "There shall be no discharge, bypass, or diversion of raw or partially treated sewage, sewage sludge, grease or oils from the collection, transport, treatment or disposal facilities to adjacent land areas or surface waters." Violation N Inspection Bear Valley MHP WTF 145753 84-058 N
1105738 06/16/2022 Order Conditions During an inspection that occurred on June 16th, 2022, by TJ Middlemis-Clark, TJ observed that the irrigation site did not have fencing. Section I.B.4. states reclamation requirements. These requirements state, "The irrigation sites shall be properly fenced and posted to restrict public access and warn of the presence of sewage." Violation N Inspection Convict Lake Campground WTF 146807 95-037 Y
1105736 01/18/2022 Late Report According to the WDR, Pg. 16 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 1/15/2022 but not submitted until 3/11/2022. Violation N Report Convict Lake Campground WTF 146807 95-037 N
1105735 10/18/2021 Late Report According to the WDRs, Pg. 16 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 10/15/2021 but not submitted until 3/11/2022. Violation N Report Convict Lake Campground WTF 146807 95-037 N
1105734 11/02/2021 Late Report According to the WDR, Pg. 17 Section II.B. states submittal period requirements. These requirements state, ¿Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter.¿ This report was due on 10/30/2021 but not submitted until 3/11/2022. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1105720 11/02/2021 Deficient Reporting According to the WDRs, Pg. 4 Section I.A.1-4 & Pg. 15 Section I.B. states effluent reporting requirements. These requirements state, ¿Grab samples of the effluent discharged to the first pond from which percolation can occur, shall be collected and analyzed to determine the magnitude of the following parameters.¿ Monitoring samples were not given in the report as required by WDRs. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1105717 02/01/2022 Deficient Reporting According to the WDRs, Pg. 4 Section I.A.1-4 & Pg. 15 Section I.B. states effluent reporting requirements. These requirements state, "Grab samples of the effluent discharged to the first pond from which percolation can occur, shall be collected and analyzed to determine the magnitude of the following parameters." Monitoring samples were not given in the report as required by WDRs. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1105716 03/11/2022 Late Report According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 1/30/2022 but not submitted until 3/11/2022. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1105715 11/02/2021 Deficient Reporting According to the WDRs, Pg. 4 Section I.A.1-4 & Pg. 15 Section I.B. states effluent reporting requirements. These requirements state, ¿Grab samples of the effluent discharged to the first pond from which percolation can occur, shall be collected and analyzed to determine the magnitude of the following parameters.¿ Monitoring samples were not given in the report as required by WDRs. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1105714 11/02/2021 Late Report According to the WDRs, Pg. 17 Section II.B. states submittal period requirements. These requirements state, "Quarterly monitoring reports containing the above-required information shall be submitted to the Regional Board by the 30th day following the end of each quarter." This report was due on 10/30/2021 but not submitted until 3/11/2022. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1105712 06/30/2021 Deficient Reporting According to the WDRs, Pg. 4 Section I.A.1-4 & Pg. 15 Section I.B. states effluent reporting requirements. These requirements state, "Grab samples of the effluent discharged to the first pond from which percolation can occur, shall be collected and analyzed to determine the magnitude of the following parameters." Monitoring samples were not given in the report as required by WDR Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1105711 03/31/2021 Deficient Reporting According to the WDRs, Pg. 4 Section I.A.1-4 & Pg. 15 Section I.B. states effluent reporting requirements. These requirements state, "Grab samples of the effluent discharged to the first pond from which percolation can occur, shall be collected and analyzed to determine the magnitude of the following parameters." Monitoring samples were not given in the report and as required by WDR. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1105680 11/30/2021 Deficient Reporting Failed to provide results for several parameters related to effluent quality Violated Board Order No.R6V-99-033MRP Section I.B1,2. Violation N Report Airforce Research Lab STP 146721 99-033 N
1105499 05/25/2022 Unauthorized Discharge Unauthorized Discharges of Waste in Violation of Water Code section 13264 and Basin Plan Regionwide Prohibition 3: Violation None Inspection WPL Holdings LLC Property 448092 None Y
1105363 01/26/2022 Groundwater Exceeded Upper Water Quality Objectives for Gross Alpha, Gross Beta, Nitrate as N, Radium, Strontium, Total Dissolved Solids, and Uranium during the 2022 1st Quarter monitoring period. Violates Board Order CAO 6-98-20 3.b and WDR I.B.1.c. Violation N Report New Ivanpah Dry Lake Evap Pond 147169 90-041 Y
1105362 10/27/2021 Groundwater Exceeded Upper Water Quality Objectives for Gross Alpha, Gross Beta, Nitrate as N, Radium, Strontium, Total Dissolved Solids, and Uranium during the 2021 4th Quarter monitoring period. Violates Board Order CAO 6-98-20 3.b and WDR I.B.1.c. Violation N Report New Ivanpah Dry Lake Evap Pond 147169 90-041 Y
1105361 07/27/2021 Groundwater Exceeded Upper Water Quality Objectives for Gross Alpha, Gross Beta, Nitrate as N, Radium, Strontium, Total Dissolved Solids, and Uranium during the 2021 3rd Quarter monitoring period. Violates Board Order CAO 6-98-20 3.b and WDR I.B.1.c. Violation N Report New Ivanpah Dry Lake Evap Pond 147169 90-041 Y
1105360 04/28/2021 Groundwater Exceeded Upper Water Quality Objectives for Gross Alpha, Gross Beta, Nitrate as N, Radium, Strontium, Total Dissolved Solids, and Uranium during the 2021 2nd Quarter monitoring period. Violates Board Order CAO 6-98-20 3.b and WDR I.B.1.c. Violation N Report New Ivanpah Dry Lake Evap Pond 147169 90-041 Y
1105358 02/10/2021 Groundwater Exceeded Upper Water Quality Objectives for Gross Alpha, Gross Beta, Nitrate as N, Radium, Strontium, Total Dissolved Solids, and Uranium during the 2021 1st Quarter monitoring period. Violates Board Order CAO 6-98-20 3.b and WDR I.B.1.c. Violation N Report New Ivanpah Dry Lake Evap Pond 147169 90-041 Y
1105357 10/27/2020 Groundwater Exceeded Upper Water Quality Objectives for Gross Alpha, Gross Beta, Nitrate as N, Radium, Strontium, Total Dissolved Solids, and Uranium during the 2020 4th Quarter monitoring period. Violates Board Order CAO 6-98-20 3.b and WDR I.B.1.c. Violation N Report New Ivanpah Dry Lake Evap Pond 147169 90-041 Y
1105351 07/28/2020 Groundwater Exceeded Upper Water Quality Objectives for Gross Alpha, Gross Beta, Nitrate as N, Radium, Strontium, and Uranium during the 2020 3rd Quarter monitoring period. Violates Board Order CAO 6-98-20 3.b and WDR I.B.1.c. Violation N Report New Ivanpah Dry Lake Evap Pond 147169 90-041 Y
1105293 05/26/2022 Unauthorized Discharge Recovery well water is collected and stored in a tank near P-16. The tank has an effluent line that runs to the 204 and then out to the evaporation ponds. A valve in the effluent line was inadvertently closed causing a release of 50-100 gallons of recovery water. Violation N Complaint Onsite Evaporation Ponds 133369 R6V-2005-0011 Y
1105292 05/25/2022 Unauthorized Discharge Unauthorized release from DE sump overflow. Barren solution. 25 gallons to ground. Violation of Board Order R6V-2021-0020, Section II., A.,3. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 Y
1104646 03/31/2022 Order Conditions Exceeded Action Leakage Rates and/or Rapid and Large Leak Rates for West Pregnant Pond and East Pregnant Pond during the 2022 Q1 monitoring period. Violates Board Order R6V-2020-0031 MRP II.B.6. Table 1 Violation N Report Briggs Mine Project 438638 R6V-2020-0031 N
1104500 12/02/2020 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Maximum limit is 60.0 mg/L and reported value was 75.0 mg/L. Violation N Report Mojave STP 148398 01-036 N
1104492 04/30/2022 Deficient Reporting (1) Groundwater Elevation Data was not included in the 1st Quarter 2022 report and the resulting maps illustrating groundwater elevation, direction, velocity, and isocontours are also missing. Violates Board Order R6V-2020-0031 MRP IV.1.d. (2) Copies of field monitoring and well sampling data sheets were not included in the 1st Quarter 2022 report. Violates Board Order R6V-2020-0031 MRP IV.1.h. (3) The 1st Quarter 2022 report is missing a letter transmitting the essential points of each report, including a discussion of any violations found since the last report was submitted and describing actions taken or planned for correcting those violations. Violates Board Order R6V-2020-0031 MRP IV.A.1.J. (4) Surface Impoundment sludge was not sampled during the 1st Quarter 2022 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.2. ¿ Attachment A (5) Incomplete EDF Laboratory data uploaded to Geotracker during the 1st Quarter 2022 monitoring period. Violates Board Order R6V-2020-0031 MRP IV.A. (6) Wetland Wells Piezometer Data missing during the 1st Quarter 2022 Violates Board Order R6V-2020-0031 MRP II.F. (7) Barren pond and Detoxification Pond not sampled or reported as dry during the 2022 1st Quarter monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.1 Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1104491 02/16/2022 Groundwater Exceeded WQPS of Copper, Iron, Mercury, and WAD Cyanide during the 1st Quarter 2022 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1104478 05/19/2022 Order Conditions Failure to maintain total arsenic concentrations below 500 parts per million (ppm). BAP 5 arsenic sampling result 672 ppm. Arsenic exceedance caused because tailings sump flow that was directed to BAP 5 was moved to another pond for dust control. The tailings sump flow does not contain arsenic. Violation of Board Order R6V-2015-0057, Section II.B.6 Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1104381 08/10/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Weekly Average limit is 45.0 % and reported value was 58.0 %. Violation N Report SCLA Central WWTP-Victorville Water Dist 394630 R6V-2014-0002 N
1104380 04/26/2021 OEV Total Coliform 7-Day Median limit is 2.2 MPN/100 mL and reported value was 4.5 MPN/100 mL. Violation N Report SCLA Central WWTP-Victorville Water Dist 394630 R6V-2014-0002 N
1104374 05/23/2022 Sanitary Sewer Overflow/Spill/ Type: Category 1. Air Relief Valve (ARV)/Blow-Off Valve (BOV) Failure caused 1200.0 gallons of sewage to spill from Force Main at 8-inch Diameter Force Main Serving Stoddard Wells Pump Station to Unpaved surface. Surface water body affected (Un-named tributary to Mojave River). Violation N SSO Victorville SD CS 318545 2022-0103-DWQ N
1104146 08/11/2021 CAT1 Total Dissolved Solids (TDS) Monthly Maximum limit is 181.0 mg/L and reported value was 185.0 mg/L. Violation N Report Crystal Geyser Roxane Cabin Bar Water Bottling Plant 392194 R6V-2017-0006 N
1104029 08/13/2021 CAT1 Total Dissolved Solids (TDS) Monthly Maximum limit is 256.0 mg/L and reported value was 290.0 mg/L. Violation N Report Crystal Geyser Roxane Olancha Water Bottling Facility 389564 R6V-2017-0005 N
1103991 05/09/2022 Sanitary Sewer Overflow/Spill/ Type: Category 1. Vandalism;A homeless person pitched a tent by manholes 16 and 17, eyewitness accounts and evidence surrounding these manholes show that he gained access to several secured manholes and dumped a variety of objects in them including tents, tires, trash, and rocks. this large debris created several obstructions in downstream pipes and manholes and cause the spill. the Victorville sheriff was called and based on eyewitness accounts sheriff deputies arrested this person. Sheriff deputy present: T.Esquivel Phone# 7602412911, Email: tesquivel@sbcsd.org Police report#172205466 At the time of drafting this report, the arrest report is not yet available caused 254370.0 gallons of sewage to spill from Manhole;These four manholes are downstream of manholes 16,17 and 18 where the vandalism occurred at Hesperia Interceptor to Drainage Channel;When the spill occurred, it come out of these manholes covers and ended up in a nearby wash. Surface water body affected (Mojave River). Violation N SSO Victor Valley Wastewater CS 301077 2022-0103-DWQ Y
1103987 04/05/2022 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Not to exceed a specific limit more than once within any 30-day period. limit is 45.0 % and reported value was 51.0 %. Violation N Report Ridgecrest WTF 140415 00-056 N
1103981 12/02/2021 Order Conditions Failed to comply with 12/1/2021 deadline to have new treatment facilities operational. Violation None Report Rosamond WTF (Ponds) 425543 R6V-2019-0251 Y
1103980 09/02/2021 Order Conditions Failed to complete construction of wastewater treatment facility improvements by 9/1/2021. Violation None Report Rosamond WTF (Ponds) 425543 R6V-2019-0251 Y
1103792 04/13/2022 Unauthorized Discharge Unpermitted Cannabis Cultivation site Violation None Inspection Diaz Property 447559 None Y
1103791 04/13/2022 Unauthorized Discharge Unpermitted Cannabis cultivation Violation None Inspection Kings Adventure Farm and Ranch LLC Property 447558 None Y
1103328 01/04/2022 OEV pH Monthly Minimum limit is 6.0 SU and reported value was 3.01 SU. Violation N Report Ridgecrest WTF 140415 00-056 N
1103267 05/12/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 30-Day Average limit is 45.0 mg/L and reported value was 80.0 mg/L. Violation N Report Ridgecrest WTF 140415 00-056 N
1102864 03/01/2022 Unauthorized Discharge Jacket Water/Closed Loop System unauthorized release. A valve on the system that is automated has been broken so the valve has been manually operated (opened and closed). Wind blow debris (cardboard) got trapped onto a drain because of the suction caused by the drain in the basin. That seems to have resulted in overflow or release of closed loop system water to the ground/paved surface surrounding the drain basin. 20 to 40 gallons. The water has evaporated or infiltrated into the soil areas around the compressor building. A sample was collected of the water. Violation of WDRs, Section II, 9. Violation N Report PG&E Hinkley Compressor Station 436283 R6V-2019-0275 Y
1102689 03/22/2022 Sanitary Sewer Overflow/Spill/ Type: Category 2. Vandalism caused 2550.0 gallons of sewage to spill from Manhole;Two manholes at Easement South of Main ST. and East of the Aqueduct to Unpaved surface. No surface water body affected. Violation N SSO City of Hesperia CS 318549 2022-0103-DWQ Y
1102628 02/17/2022 Deficient Reporting Violations of Board Order No. 6-00-18, MRP II.A.1. and II.A.4. Discharger did not share any information regarding class III waste disposal during the reporting period. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1102627 02/17/2022 Order Conditions Concentrations for many constituents of concern in soil gas exceed the method detection limit from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. . Violates Board Order WDR MRP I.B.3 Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1102626 02/17/2022 Order Conditions Exceeded WQPS concentration limits for multiple inorganic and organic constituents in groundwater from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order 6-00-18 MRP I.A.3.a. and b. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1102532 10/26/2021 CAT1 Oil and Grease Daily Maximum limit is 6.2 mg/L and reported value was 8.0 mg/L. Violation N Report Trona Plant 140411 00-053 Y
1102531 10/11/2021 CAT1 Oil and Grease Daily Maximum limit is 6.2 mg/L and reported value was 9.2 mg/L. Violation N Report Trona Plant 140411 00-053 Y
1102530 10/10/2021 CAT1 Oil and Grease Daily Maximum limit is 6.2 mg/L and reported value was 7.1 mg/L. Violation N Report Trona Plant 140411 00-053 Y
1102499 12/31/2021 Deficient Reporting Failure to report the results of the 2021 Five-Year COC Program to the Water Board within 45 days following the end of the monitoring period (February 14, 2022) Board Order No. R6V-2015-0057, III.F and MRP, Section IV.A.4. Violation None Report Boron Mine Facility 403003 R6V-2015-0057 Y
1102498 12/31/2021 Deficient Monitoring Failure to conduct the required sampling for the Five-Year COC Program during the 2021 calendar year. Board Order No. R6V-2015-0057, III.F and MRP, Section II.G.2.b. Violation N Report Boron Mine Facility 403003 R6V-2015-0057 Y
1102419 12/31/2021 Deficient Monitoring In October 2020 PG&E implemented remedial actions for chromium cleanup east of the surface impoundments. Those actions resulted in a change in groundwater flow direction from the north, north-west to the east. The Point of Compliance, therefore, was changed. PG&E failed to add monitoring points to adequately monitor the changed Point of Compliance. Violation of WDRs III.H.1., MRP II. Violation None Report PG&E Hinkley Compressor Station 436283 R6V-2019-0275 N
1102418 12/31/2021 Deficient Monitoring Failure to maintain in good working order any control system or monitoring device installed to achieve compliance with WDRs. Multiple lysimeters not functioning properly. P8-LY-2E - not functional since May 2016, P8-LY-5W - not functional since July 2018, P8-LY-1E - not functional since October 2019, P8-LY-3E - not functional since second half 2021. Violation of WDRs II.A.15. Violation N Report PG&E Hinkley Compressor Station 436283 R6V-2019-0275 N
1102379 07/15/2020 Groundwater (1) Exceeded MDL of 1,1-Dichloroethane, 1,2-Dichloropropane, 1,4-Dichlorobenzene, Chloroform, Dichlorodifluoromethane, Tetrachloroethene, Trichloroethene, and Trichlorofluoromethane during the 2020 2nd Half Semi-annual monitoring period. Violates Board Order 6-00-13 MRP II.C.2. (2) Exceeded Prediction Limits for Total Dissolved Solids during the 2020 2nd Half Semi-Annual monitoring period. Violates Board Order 6-00-13 MRP II.C. Violation N Report Adelanto Class III Landfill 147245 00-013 N
1102378 07/21/2021 Groundwater (1) Exceeded MDL of 1,1-Dichloroethane,1,2-Dichloroethane,1,2-Dichloropropane,1,4-Dichlorobenzene, Chloroform, Dichlorodifluoromethane, Tetrachloroethene (PCE), Trichloroethene (TCE), Trichlorofluoromethane, and Trichlorofluoromethane during the 2021 2nd Half Semi-annual monitoring period. Violates Board Order 6-00-13 MRP II.C.2. (2) Exceeded Prediction Limits for Total Dissolved Solids during the 2021 2nd Semi-Annual monitoring period. Violates Board Order 6-00-13 MRP II.C. Violation N Report Adelanto Class III Landfill 147245 00-013 N
1102377 01/08/2021 Groundwater (1) Exceeded MDL of 1,1-Dichloroethane, 1,2-Dichloropropane, 1,4-Dichlorobenzene, Chloroform, Dichlorodifluoromethane, Tetrachloroethene, Trichloroethene, and Trichlorofluoromethane during the 2021 1st Half Semi-annual monitoring period. Violates Board Order 6-00-13 MRP II.C.2. (2) Exceeded Prediction Limits for Total Dissolved Solids during the 2021 1st Semi-Annual monitoring period. Violates Board Order 6-00-13 MRP II.C. Violation N Report Adelanto Class III Landfill 147245 00-013 N
1101978 01/15/2022 Late Report Report not submitted. Violates Requirement II. Reporting of the monitoring and reporting program for Board Order No. R6V-2002-0022. Violation N Report Hein Hettinga/A & H Dairy 1&2 132106 R6V-2002-0022 Y
1101977 07/15/2021 Late Report Report not submitted. Violates Requirement II. Reporting of the monitoring and reporting program for Board Order No. R6V-2002-0022. Violation N Report Hein Hettinga/A & H Dairy 1&2 132106 R6V-2002-0022 Y
1101945 04/20/2021 Groundwater The April 2021 samples for nitrate in groundwater wells B and C contained nitrate as nitrogen concentrations of 11 and 14 milligrams per liter, respectively. These concentrations are greater than the primary MCL for nitrate as nitrogen of 10 milligrams per liter. Causing a concentration of a chemical constituent in the receiving water to be in excess of the maximum contaminant levels constitutes a violation of Board Order No. R6V-2004 00018 requirement I. Discharge Specifications, B. Receiving Water Limitations, 5. (page 4 of the order). Violation N Report Hilton Creek CSD Package STP 133595 04-018 Y
1101844 01/15/2022 Deficient Reporting Noncompliance with I. Monitoring, A. Disposal Monitoring, 2. and 3. No information was provided for the acreage on which manure was intended to be disposed, and no map was provided to illustrate offsite manure disposal locations. Violation N Report Desert Oasis Dairy 146874 96-009 Y
1101842 07/15/2021 Deficient Reporting Noncompliance with I. Monitoring, A. Disposal Monitoring, 1., 4., and 5. No information was given for the estimated manure disposed on site, the estimated volume of dairy wash water disposed of onsite or nearby, and the average number of cows, heifers, and calves during the period. Noncompliance with I. Monitoring, B. Ground Water Monitoring, 1. depth to groundwater. The depth to groundwater was not found in the report. Violation N Report Desert Oasis Dairy 146874 96-009 Y
1101822 01/15/2021 Late Report Report not received on time to GeoTracker database Violation N Report Desert Oasis Dairy 146874 96-009 Y
1101647 01/16/2022 Late Report The 2021 annual monitoring report was due on January 15, 2021. The report has not been uploaded to GeoTracker. Violation N Report Stovepipe Wells Village 147582 96-161 Y
1101635 01/16/2021 Late Report The 2020 annual monitoring report was due on January 15, 2021. The report has not been uploaded to GeoTracker. Violation N Report Stovepipe Wells Village 147582 96-161 Y
1101204 09/30/2021 CAT1 Nitrogen, Total (as N) Monthly Average limit is 10.3 mg/L and reported value was 11.5 mg/L at EFF-001. Violation N eSMR Victor Valley Wastewater Reclamation Authority WTP 420359 R6V-2020-0028 N
1101203 09/30/2021 CAT1 Ammonia, Total (as N) Monthly Average limit is 0.55 mg/L and reported value was 0.75 mg/L at EFF-001. Violation N eSMR Victor Valley Wastewater Reclamation Authority WTP 420359 R6V-2020-0028 N
1100919 02/09/2022 Deficient Reporting (1) Missing a list of all monitoring point/monitoring parameter pairs (pairs), by medium, which have exhibited a verified measurably significant increase. Violates Board Order R6V-2020-0031 MRP IV.A.2.c. (2) Missing four maps, for each quarter, that show groundwater elevation isocontours, monitoring points, surface trace for each waste management unit, observation stations, and the surface trace of the facility¿s point of compliance. Violates Board Order R6V-2020-0031 MRP IV.A.2.d. (3) Missing graphical data for all constituents during the 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP IV.A.2.e. (4) Missing calibration methods of any meters used for field parameters. Violates Board Order R6V-2020-0031 MRP IV.A.2.f. (5) Missing an evaluation of the effectiveness of the groundwater and unsaturated zone monitoring programs. Violates Board Order R6V-2020-0031 MRP IV.A.2.g. (6) Missing a brief summary of dates of any operational problems and maintenance activities. Violates Board Order R6V-2020-0031 MRP IV.A.2.h. (7) Missing the compliance record and corrective actions taken or planned. Violates Board Order R6V-2020-0031 MRP IV.A.2.i. (8) Missing Financial Assurance. Violates Board Order R6V-2020-0031 MRP IV.A.2.j. and k. (9) Missing a review of the preliminary closure plan and corrective action plan for all known or reasonably foreseeable releases. Violates Board Order R6V-2020-0031 MRP IV.A.2.l. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1100918 10/11/2021 Groundwater Exceeded WQPS of Iron, Mercury, and WAD Cyanide during the 4th Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1100917 01/31/2022 Deficient Reporting (1) Nitrate was not sampled in all wells during the 4th Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP I.B. - Attachment A (2) Monitoring well MW-5 was not sampled during the 4th Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP I.D. (3) Groundwater Elevation Data was not included in the 4th Quarter 2021 report and the resulting maps illustrating groundwater elevation, direction, velocity, and isocontours are also missing. Violates Board Order R6V-2020-0031 MRP IV.1.d. (4) Copies of field monitoring and well sampling data sheets were not included in the 4th Quarter 2021 report. Violates Board Order R6V-2020-0031 MRP IV.1.h. (5) The 4th Quarter 2021 report is missing a letter transmitting the essential points of each report, including a discussion of any violations found since the last report was submitted and describing actions taken or planned for correcting those violations. Violates Board Order R6V-2020-0031 MRP IV.A.1.J. (6) Surface Impoundment sludge was not sampled during the 4th Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.2. ¿ Attachment A Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1100896 07/15/2021 Late Report 2nd Quarter 2021 Report was due on July15, 2021. The report was submitted on August 20, 2021 to the GeoTracker website, 36 days late. This is a violation of MRP Section III.A.1. Violation N Report Phelan Towne Square 146144 92-105 N
1099843 12/31/2021 Deficient Monitoring Failed to sample and analyze for the following constituents; Ammonia, Boron, Chloride, Fluoride, Total Nitrate, Total Nitrogen, Sulfate, and Total Dissolved Solids. Violation N eSMR Mojave River Fish Hatchery NPDES 413407 R6V-2017-0025 N
1099842 12/31/2021 Deficient Monitoring Failed to sample and analyze for the following constituents: [INF-001]-Boron, Chloride, Fluoride, Total Nitrate, Total Nitrogen, Total Sulfate, Total Dissolved Solids; [EFF-001]-Ammonia, Boron, Chloride, Fluoride, Total Nitrate, Total Nitrogen, Sulfate, and Total Dissolved Solids. Violation N eSMR Mojave River Fish Hatchery NPDES 413407 R6V-2017-0025 N
1099776 08/29/2021 Order Conditions Freeboard Daily Minimum limit is 24 inches and reported value was 22 inches. Violation N Report Fort Irwin Waterworks 398263 R6V-2015-0004 N
1099209 07/21/2021 Groundwater Exceeded the MCL of Antimony and Arsenic during the 2020 2nd Half semi-annual monitoring period. Violates Board Order R6V-2002-0020 WDR I. B. 2. Violation N Report Hesperia Class III Landfill 132104 02-020 N
1098923 11/01/2021 Deficient Reporting Revised Waste Discharge Requirements No. 6-95-64 with Reg Meas ID 146811 in CIWQS (see Relevant board orders and other requirements) Monitoring and Reporting Program No. 95-64 Requirement D. Sludge Monitoring, 2. Noncompliance with reporting the total quantity of sludge generated, stockpiled, and removed during each monitoring period. Violation None Inspection Independence WWTF 146811 95-064 Y
1098922 12/09/2020 Deficient Reporting MRP Amendment for GeoTracker with Reg Meas ID 146811 in CIWQS (see Relevant board orders and other requirements) Enclosure 1. Amended Monitoring and Reporting Program ? GeoTracker requirement I. General Requirements C. GeoTracker Noncompliance due to the following: ? Missing field sampling points (FSPs) to GeoTracker ? Missing electronic water quality data (EDF) to FSPs ? Missing boring logs for the groundwater monitoring wells Violation None Inspection Independence WWTF 146811 95-064 Y
1098781 12/08/2021 Unauthorized Discharge Unpermitted cannabis cultivation Violation N Report Juan Antonio Hernandez Property 446220 None Y
1098593 07/15/2021 Deficient Reporting Discharger did not include the depth to groundwater for groundwater monitoring well samples. Violation N Report Dutch Dairy 146544 95-002 N
1098591 11/30/2021 Failure to Notify Bear Valley MHP did not notify Lahontan Water Board staff of a discharge that was discovered on December 1, 2021. This violates Board Order No. 6-84-58 Section II.3. Violation N Complaint Bear Valley MHP WTF 145753 84-058 Y
1098123 12/15/2021 Unauthorized Discharge OES Call (#21-7175) was made to report a 20,000-gallon spill due to a sewer main blockage. The spill occurred on 15 December 2021 caused by a combination of a heavy rain event and improper disposal of foreign materials on the sewer collections system such as ammo, grease, grit, sand, rags, clothing, tools and alike. Excess sewage was taken to the Fort Irwin Waste Water Treatment facility - ponds onsite and routed through the system. Violation None Report Fort Irwin WTF 132500 04-005 Y
1097664 08/31/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097663 07/20/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097662 07/19/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.025 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097661 09/30/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.030 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097660 09/29/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.030 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097659 09/28/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.029 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097658 09/27/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.031 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097657 09/26/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.029 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097656 09/25/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.029 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097655 09/24/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.030 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097654 09/23/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.028 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097653 09/22/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097652 09/21/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.022 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097651 09/20/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.022 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097650 09/19/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.022 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097649 09/18/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097648 09/16/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.026 MGD. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1097647 09/15/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097646 09/14/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097645 09/13/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.025 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097644 09/12/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.025 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097643 09/11/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097642 09/10/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.025 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097641 09/08/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.026 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097640 09/09/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.025 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097639 09/07/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097638 09/06/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097636 09/05/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.022 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097635 09/04/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.022 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097634 09/03/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097633 09/02/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097631 07/16/2020 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.0215 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097630 07/15/2020 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.0261 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097629 07/14/2020 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.0262 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097628 07/13/2020 OEV Flow 24-hour Average limit is 0.021 MGD and reported value was 0.0272 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097627 07/12/2020 OEV Flow 24-hour Average limit is 0.021 MGD and reported value was 0.0262 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097626 07/10/2020 OEV Flow 24-hour Average limit is 0.021 MGD and reported value was 0.0254 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097625 07/11/2020 OEV Flow 24-hour Average limit is 0.021 MGD and reported value was 0.0264 MGD. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1097624 07/09/2020 OEV Flow 24-hour Average limit is 0.021 MGD and reported value was 0.0252 MGD. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1097608 04/29/2021 Late Report Revised Waste Discharge Requirements No. 6-84-90 MRP requirement Reporting. Violation N Report Lee Vining WTF 145756 84-090 Y
1097555 09/01/2021 OEV Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1097060 08/13/2020 Groundwater Exceeded Water Quality Protection Standard of Dichlorodifluoromethane, Nitrate as N, Sulfate, Tetrachloroethene during the 2nd half semi-annual 2020 monitoring period. Violates Board Order R6V-2007-0035 WDR II.A.7 and MRP III.B.1. Violation N Report Mojave/Rosamond Landfill 360948 R6V-2007-0035 Y
1097059 02/04/2021 Groundwater Exceeded Water Quality Protection Standard of Dichlorodifluoromethane, Nitrate as N, Sulfate, Tetrachloroethene during the 1st half semi-annual 2021 monitoring period. Violates Board Order R6V-2007-0035 WDR II.A.7 and MRP III.B.1. Violation N Report Mojave/Rosamond Landfill 360948 R6V-2007-0035 Y
1096676 12/07/2020 Order Conditions Exceeded PQL or UCL 95 of Carbonate, Nitrate as N, Sulfate, Fecal Coliform, and Total Coliform during the 2020 Annual Soil Sampling. Violates Board Order R6V-2016-0031 WDR II.A.10. Violation N Report Victor Valley Regional Compost 406819 R6V-2016-0031 N
1096672 08/17/2021 Groundwater (1) Exceeded MCL or SMCL of Arsenic, Manganese, and Odor during the 2021 3rd Quarter monitoring period. Violates Board Order R6V-2016-0031 WDR I.B. (2) Exceeded Coliform Organisms during the 2021 3rd Quarter monitoring period. Violates Board Order R6V-2016-0031 WDR I.A. Violation N Report Victor Valley Regional Compost 406819 R6V-2016-0031 N
1096671 05/19/2021 Groundwater (1)Exceeded MCL or SMCL of Arsenic, Iron, Manganese, and Odor during the 2021 2nd Quarter monitoring period. Violates Board Order R6V-2016-0031 WDR I.B. (2) Exceeded Coliform Organisms during the 2021 2nd Quarter monitoring period. Violates Board Order R6V-2016-0031 WDR I.A. Violation N Report Victor Valley Regional Compost 406819 R6V-2016-0031 N
1096669 03/22/2021 Groundwater (1) Exceeded MCL or SMCL of Arsenic, Lead, and Manganese during the 2021 1st Quarter monitoring period. Violates Board Order R6V-2016-0031 WDR I.B. (2) Exceeded Coliform Organisms during the 2021 1st Quarter monitoring period. Violates Board Order R6V-2016-0031 WDR I.A. Violation N Report Victor Valley Regional Compost 406819 R6V-2016-0031 N
1096667 12/02/2020 Groundwater (1) Exceeded MCL or SMCL of Antimony, Arsenic, Beryllium, Chromium, Lead, Manganese, during the 2020 4th Quarter monitoring period. Violates Board Order R6V-2016-0031 WDR I.B. (2) Exceeded Coliform Organisms during the 2020 4th Quarter monitoring period. Violates Board Order R6V-2016-0031 WDR I.A. Violation N Report Victor Valley Regional Compost 406819 R6V-2016-0031 N
1096666 12/02/2020 Deficient Reporting (1) Missing Annual 2020 Sludge Monitoring. Violates Board Order R6V-2016-0031 MRP II.A.4. (2) Evidence that adequate financial assurances for closure and corrective action for all known or reasonably foreseeable releases is missing for the 2020 Annual monitoring period. Violates Board Order R6V-2016-0031 MRP IV.E.7. (3) Evidence that the financial assurance amount is adequate is missing for the 2020 Annual monitoring period. Violates Board Order R6V-2016-0031 MRP IV.E.7. Violation N Report Victor Valley Regional Compost 406819 R6V-2016-0031 N
1096314 10/29/2021 Deficient Reporting (1) Water quality graphs are missing an identification that a sample exceeded the concentration limit by a significant amount during the 3rd Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP IV.1.a.1.b. (2) Groundwater Elevation Data was not included in the 3rd Quarter 2021 report and the resulting maps illustrating groundwater elevation, direction, velocity, and isocontours are also missing. Violates Board Order R6V-2020-0031 MRP IV.1.d. (3) Copies of field monitoring and well sampling data sheets were not included in the 3rd Quarter 2021 report. Violates Board Order R6V-2020-0031 MRP IV.1.h. (4) The 3rd Quarter 2021 report is missing a letter transmitting the essential points of each report, including a discussion of any violations found since the last report was submitted and describing actions taken or planned for correcting those violations. Violates Board Order R6V-2020-0031 MRP IV.A.1.J. (5) Surface Impoundment sludge was not sampled during the 3rd Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.2. ¿ Attachment A (6) Surface Impoundments were not sampled for all Quarterly Monitoring Parameters during the 3rd Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.2. ¿ Attachment A Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1096313 07/28/2021 Groundwater Exceeded WQPS of Iron, Mercury, and WAD Cyanide during the 3rd Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 N
1096312 07/29/2021 Deficient Reporting (1) Water quality graphs are missing an identification that a sample exceeded the concentration limit by a significant amount during the 2nd Quarter 2021monitoring period. Violates Board Order R6V-2020-0031 MRP IV.1.a.1.b. (2) Groundwater Elevation Data was not included in the 2nd Quarter 2021 report and the resulting maps illustrating groundwater elevation, direction, velocity, and isocontours are also missing. Violates Board Order R6V-2020-0031 MRP IV.1.d. (3) Copies of field monitoring and well sampling data sheets were not included in the 2nd Quarter 2021 report. Violates Board Order R6V-2020-0031 MRP IV.1.h. (4) The 2nd Quarter 2021 report is missing a letter transmitting the essential points of each report, including a discussion of any violations found since the last report was submitted and describing actions taken or planned for correcting those violations. Violates Board Order R6V-2020-0031 MRP IV.A.1.J. (5) Surface Impoundment sludge was not sampled during the 2nd Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.2. ¿ Attachment A (6) Unsaturated Zone monitoring not completed during the 2nd Quarter 2021 monitoring period. Lysimeters equipment malfunctioned. Violates Board Order R6V-2020-0031 MRP II.C. (7) Surface Impoundments were not sampled during the 2nd Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.1. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 N
1096311 04/22/2021 Groundwater Exceeded WQPS of Iron, Mercury, and WAD Cyanide during the 2nd Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 N
1095775 02/05/2021 Deficient Reporting 2020 annual report failed to provide parameters related to flow and effluent monitoring. Violated Board Order No. R6V-1997-0096 MRP I.A.1-4, and I.B, respectively. Violation N Report Desert Oasis Safety Rdside RES 147596 97-096 Y
1095774 02/05/2021 Late Report 2020 annual report submitted late, violating Board Order MRP No. II.B. Violation N Report Desert Oasis Safety Rdside RES 147596 97-096 Y
1095700 06/07/2021 Groundwater Exceeded MDL for Benzene, Dichlorodifluoromethane, Ethylbenzene, Tetrachloroethene, Toluene, Trichlorofluoromethane, and Xylenes during the 2021 1st half Semi-annual monitoring period. Violates Board Order R6V-2009-0018 MRP I.B.3.d. ii. Violation N Report Chalfant Class III Landfill 366583 R6V-2009-0018 N
1095699 11/10/2020 Groundwater Exceeded MDL for Benzene, Ethylbenzene, Tetrachloroethene, Toluene, and Trichlorofluoromethane, and Xylenes during the 2020 2nd half Semi-annual monitoring period. Violates Board Order R6V-2009-0018 MRP I.B.3.d. ii. Violation N Report Chalfant Class III Landfill 366583 R6V-2009-0018 N
1095693 04/07/2021 Groundwater Exceeded PQL (0.5 ug/L) for Tetrachloroethene during the 2021 1st half semi-annual monitoring period. Violates Board Order 6-95-70 MRP I.A.3.b. Violation N Report Lone Pine Class III Landfill 146816 95-070 N
1095463 07/15/2021 Late Report Report was 18 days late, due July 15th as per MRP. Violating board order R6V-1995-0064 MRP. Section II.B. Violation N Report Independence WWTF 146811 95-064 N
1095356 10/14/2021 Sanitary Sewer Overflow/Spill/ Type: Category 1. Debris from Construction caused 6500.0 gallons of sewage to spill from Manhole at Main Street West of G Avenue to Drainage Channel;Separate Storm Drain;Unpaved surface. Surface water body affected (Un-named tributary to the Mojave River.). Violation N SSO City of Hesperia CS 318549 2022-0103-DWQ Y
1095309 08/03/2021 Groundwater Exceeded MCL for Total Nitrogen (10mg/L) and TDS upper limit (1000mg/L). Violates Board Order R6V-2019-0251 WDR III.B.2. Violation N Report Rosamond WTF (Ponds) 425543 R6V-2019-0251 N
1095308 10/05/2021 Deficient Reporting Failed to provide a scaled groundwater iso-contour elevation map. Violates Board Order R6V-2015-0251 MRP II.F.7. Violation N Report Rosamond WTF (Ponds) 425543 R6V-2019-0251 N
1095306 05/04/2021 Groundwater Exceeded MCL for Total Nitrogen (10mg/L) and TDS upper limit (1000mg/L). Violates Board Order R6V-2019-0251 WDR III.B.2. Violation N Report Rosamond WTF (Ponds) 425543 R6V-2019-0251 N
1095305 07/08/2021 Deficient Reporting (1) Failed to provide results for several parameters related to effluent quality. Violates Board Order R6V-2015-0251 MRP II. C.1. (2)Failed to provide a scaled groundwater iso-contour elevation map. Violates Board Order R6V-2015-0251 MRP II.F.7. Violation N Report Rosamond WTF (Ponds) 425543 R6V-2019-0251 N
1095303 02/02/2021 Groundwater Exceeded MCL for Total Nitrogen (10mg/L) and TDS upper limit (1000mg/L). Violates Board Order R6V-2019-0251 WDR III.B.2. Violation N Report Rosamond WTF (Ponds) 425543 R6V-2019-0251 N
1095297 04/05/2021 Deficient Reporting (1) Failed to provide results for several parameters related to effluent quality. Violates Board Order R6V-2015-0251 MRP II. C.1. (2) Failed to provide a scaled groundwater iso-contour elevation map. Violates Board Order R6V-2015-0251 MRP II.F.7. Violation N Report Rosamond WTF (Ponds) 425543 R6V-2019-0251 N
1095189 08/19/2021 CAT1 Oil and Grease Daily Maximum limit is 6.2 mg/L and reported value was 105.1 mg/L. Violation N Report Trona Plant 140411 00-053 Y
1095187 08/19/2021 OEV TPH as Kerosene Daily Maximum limit is 4.2 mg/L and reported value was 54.7 mg/L. Violation N Report Trona Plant 140411 00-053 Y
1095185 07/15/2021 Deficient Reporting Missing Flow Data for the 2021 Quarter 2 monitoring period. Violates Board Order R6V-2000-54 MRP B. Violation N Report West End Plant 140413 00-054 Y
1095182 07/15/2021 Deficient Reporting Missing Flow Data for the 2021 Quarter 2 monitoring period. Violates Board Order R6V-2005-24 MRP B. Violation N Report Argus Plant 297044 R6V-2005-0024 Y
1095038 07/16/2021 Late Report Discharger did not submit monitoring reports for 1st Semiannual 2021 reporting period. Violates Board Order No. 97-10-DWQ-03, MRP sections II.B. Violation N Report Eastern Sierra College Center 203900 97-010-DWQ N
1095033 01/16/2021 Late Report Discharger did not submit monitoring reports for Annual 2020 reporting period. Violates Board Order No. 97-10-DWQ-03, MRP sections II.D. Violation N Report Eastern Sierra College Center 203900 97-010-DWQ N
1095032 01/16/2021 Late Report Discharger did not submit monitoring reports for 2nd Semiannual 2020 reporting period. Violates Board Order No. 97-10-DWQ-03, MRP sections II.B. Violation N Report Eastern Sierra College Center 203900 97-010-DWQ N
1095031 07/16/2020 Late Report Discharger did not submit monitoring reports for 1st Semiannual 2020 reporting period. Violates Board Order No. 97-10-DWQ-03, MRP sections II.B. Violation N Report Eastern Sierra College Center 203900 97-010-DWQ N
1094365 09/16/2021 Order Conditions Septic tank from the Bear Valley Ranchos Mobile Home Park treatment system spilled over causing 350-400 gallons of sewer waste to overflow to Bonato Lane and Sioux Road. Violates Board Order No. 6-84-58 C.2. Violation N Report Bear Valley MHP WTF 145753 84-058 N
1093977 04/30/2021 Late Report Reports submitted 91 days late. Violating Board Order R6V-2000-0016 MRP section II. B Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1093914 07/16/2021 Late Report Quarter 2 2021 monitoring report was due on 7/15/2021, but was not turned in. Violated Board Order No. R6V-02-039 MRP II. Violation N Report Big Pine Indian RES WTF 131472 02-039 N
1093608 06/23/2021 Failure to Notify The City failed to provide an updated and approved copy of the City''s SSMP in CIWQS and during the inspection, and/or submit an electronic copy of the SSMP to the State Water Board. Violation N Inspection Ridgecrest WWTF CS 336218 2022-0103-DWQ N
1093506 05/18/2021 Groundwater Exceeded Sulfate Concentration Limits in Well MW-4 and West Well during the 2021 Quarter 2 monitoring period. Violates Board Order 6-96-11 MRP I.A.1. b. Violation N Report Colosseum Gold Mine 146876 96-011 N
1093462 06/09/2021 Order Conditions Failing to convey wastewater on the pad to the oil/water separator, and then to the City of Ridgecrests wastewater treatment plant violates Board Order No. 6-01-59, WDR I. D.1. Violation N Inspection Fire Fighting Training Facilty 141173 01-059 Y
1093447 06/09/2021 Failure to Notify Failing to notify Water Board staff of changes in the operation of the facility, such as in the manner of discharge and in the materials used during firefighting exercise, violates Board Order No. 6-01-59, WDR II.C. Violation N Inspection Fire Fighting Training Facilty 141173 01-059 Y
1093431 11/30/2020 CAT1 Settleable Solids Monthly Average limit is 0.1 ml/L and reported value was 0.27 ml/L at M-003. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1093306 04/09/2021 Late Report Discharger submitted Report over 90 days late. Violating Board Order R6V-2000-0018 MRP section IV.5. Violation N Report Fort Irwin Class III Landfill 148187 00-018 N
1093302 08/03/2020 Late Report Discharger submitted Report 62 days late. Violating Board Order R6V-2000-0018 MRP section IV.5. Violation N Report Fort Irwin Class III Landfill 148187 00-018 N
1093069 07/12/2021 Late Report The Monitoring Well Installation Work Plan, due on July 12, 2021, 60 Days after the adoption of the R6V-2021-0020 Board Order, has not been submitted to date. 30 Days late as of August 11, 2021. Violates Board Order R6V-2021-0020 WDR V.G. Violation N Report Soledad Mountain Project 443566 R6V-2021-0020 N
1093016 01/14/2021 Groundwater Exceeded Primary MCL¿s and SMCL¿s for the following constituents. Arsenic (0.010mg/L), Chromium ( 0.05mg/L), Chloride(250/500mg/L), Nitrate (as N) (10mg/L), Sulfate (250/500mg/L), Total Dissolved Solids (1000mg/L), Iron (0.3 mg/L), Nickel (0.1 mg/L), Selenium (0.001mg/L) Violating Board Order RV6-2002-0019 Section 2. B.1. d. Violation N Report Main Base Class III Landfill 132096 R6V-2002-0019 N
1092841 06/09/2021 Unauthorized Discharge Unauthorized discharge of noncontact cooling water to two domestic wastewater evaporation-percolation ponds Violating Board Order 6-94-53 WDR section I.C.6. Violation N Inspection Salt Wells Propul. Labs 146498 94-053 N
1092758 06/30/2021 Deficient Reporting Failure to provide results for 2nd Qtr. effluent monitoring. Analytical values were not received with the report for May or June 2021, Violated Board Order No. R6V-1999-033 Section I.B.1 & 2 Violation N Report Airforce Research Lab STP 146721 99-033 N
1092747 07/15/2021 Late Report Wrong report was uploaded at the time. Violation N Report Main Base Class III Landfill 132096 R6V-2002-0019 N
1092272 03/16/2021 Groundwater Exceeded Sulfate Concentration Limits in Well MW-4 and West Well during the 2021 Quarter 1 monitoring period. Violates Board Order 6-96-11 MRP I.A.1. b. Violation N Report Colosseum Gold Mine 146876 96-011 N
1092271 12/15/2020 Groundwater Exceeded Sulfate Concentration Limits in Well MW-4 and West Well during the 2020 Quarter 4 monitoring period. Violates Board Order 6-96-11 MRP I.A.1. b. Violation N Report Colosseum Gold Mine 146876 96-011 N
1092270 09/22/2020 Groundwater Exceeded Sulfate Concentration Limits in Well MW-4 and West Well during the 2020 Quarter 3 monitoring period. Violates Board Order 6-96-11 MRP I.A.1. b. Violation N Report Colosseum Gold Mine 146876 96-011 N
1092127 06/08/2021 Deficient Reporting The discharger has failed to provide and maintain a Sampling and Analysis Plan (SAP) at all times within the facility. Violation N Inspection Ridgecrest WTF 140415 00-056 N
1092126 07/14/2021 Deficient Reporting After past discussions with the discharger, the Field Sampling Points (FSPs) are not entered in the Geotracker map. Violation N Report USNWC Golf Course CL2 Recl Fac 147203 84-036 N
1092124 05/22/2021 OEV Total Coliform 7-Day Median limit is 23.0 MPN/100 mL and reported value was 79.0 MPN/100 mL. Violation N Report USNWC Golf Course CL2 Recl Fac 147203 84-036 N
1091999 07/14/2021 Sanitary Sewer Overflow/Spill/ Type: Category 1. Other (specify below);Rebar was driven through top of sewer pipe causing debris to collect on rebar and caused overflow from upstream Manhole. caused 2875.0 gallons of sewage to spill from Manhole at 482 State Hwy 173 to Drainage Channel;Surface Water;Unpaved surface. Surface water body affected (Lake Arrowhead). Violation N SSO Lake Arrowhead Community Services District Collection Sytem 301020 2022-0103-DWQ N
1091922 02/17/2021 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average (Mean) limit is 30 mg/L and reported value was 36 mg/L. Violation N Report Bear Valley MHP WTF 145753 84-058 N
1091644 09/30/2020 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average limit is 30.0 mg/L and reported value was 31.9 mg/L. Violation N Report Mammoth CWD STP 145892 91-022 N
1091570 09/18/2020 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Daily Maximum limit is 45 mg/L and reported value was 76.3 mg/L. Violation N Report Mammoth CWD STP 145892 91-022 N
1091569 09/09/2020 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Daily Maximum limit is 45 mg/L and reported value was 54.9 mg/L. Violation N Report Mammoth CWD STP 145892 91-022 N
1091528 04/30/2021 Deficient Reporting total volumes and average flow as required by I.A.1. and I.A.2. Flow Monitoring and sludge monitoring data as required by I.D.2. Sludge Monitoring Violation N Report Independence WWTF 146811 95-064 Y
1091526 01/15/2021 Deficient Reporting No report submitted to GeoTracker Violation N Report Independence WWTF 146811 95-064 Y
1091466 01/15/2021 Deficient Reporting Missing annual report for 2020 as required by II.C. Annual Report Violation N Report Convict Lake Campground WTF 146807 95-037 Y
1091464 04/15/2021 Late Report Missing first quarter report for 2021 as required by II.B. Submittal Periods Violation N Report Convict Lake Campground WTF 146807 95-037 Y
1091463 01/01/2021 Deficient Reporting Missing sludge monitoring data for fourth quarter report of 2020 as required by I.C. Sludge Monitoring Violation N Report Convict Lake Campground WTF 146807 95-037 Y
1091420 04/26/2021 Late Report Quarterly monitoring reports are due on the 15th day of the month following each quarter, but was not turned in. Violated Board Order No. R6V-1987-0010 MRP II. Violation N Report Rolling Green Terrace WTF 146117 87-010 Y
1091418 01/26/2021 Late Report Quarterly monitoring reports are due on the 15th day of the month following each quarter, but was not turned in. Violated Board Order No. R6V-1987-0010 MRP II. Violation N Report Rolling Green Terrace WTF 146117 87-010 Y
1091263 06/18/2021 Order Conditions Effluent line actuator valve failed causing unauthorized discharge of .620 MG of treated tertiary effluent to on-site stormwater basin. Violates Board Order No. 6-91-22, I.D.2. Violation N Report Mammoth CWD STP 145892 91-022 Y
1091064 10/21/2020 Groundwater Exceeded SMCL of Sulfate during the 2020 2nd Semi-Annual monitoring period. Violates Board Order 6-95-72 WDR I.A.3. Violation N Report Tecopa Class III Landfill 146818 95-072 N
1090899 07/30/2020 Late Report The 2020 Annual Storm Water Report was due on 07/30/2020 but was not turned in. Violates Board Order R6V-2020-0031 MRP IV.A.3. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1090889 10/07/2020 Groundwater Exceeded PQL (0.5 ug/L) for Tetrachloroethene during the 2020 2nd half semi-annual monitoring period. Violates Board Order 6-95-70 MRP I.A.3.b. Violation N Report Lone Pine Class III Landfill 146816 95-070 N
1090832 09/24/2020 Groundwater (1) Exceeded the WQPS of Chloride, Nitrate, and Total Dissolved Solids during the 1st Half 2020 semi-annual monitoring period. Violates Board Order 6-95-118 WDR I.A.3. (2) Exceed MDL of 1,1-Dichloroethane, Tetrachloroethene, and Trichloroethene during the 1st Half 2020 semi-annual monitoring period. Violates Board Order 6-95-118 WDR I.A.3. Violation N Report Goldstone-Echo Landfill 146863 95-118 N
1090831 03/03/2021 Groundwater (1) Exceeded the WQPS of Chloride, Nitrate, Sulfate, and Total Dissolved Solids during the 2nd Half 2020 semi-annual monitoring period. Violates Board Order 6-95-118 WDR I.A.3. (2) Exceed MDL of 1,1-Dichloroethane, Dichlorodifluoromethane, Tetrachloroethene, and Trichloroethene during the 2nd Half 2020 semi-annual monitoring period. Violates Board Order 6-95-118 WDR I.A.3. Violation N Report Goldstone-Echo Landfill 146863 95-118 N
1090750 04/09/2021 Unauthorized Discharge The Army continues to operate Cell 1A over capacity while Cell 1B is built and operable. Violation of Board Order 00-18, WDR Item IV.G. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1090749 04/09/2021 Order Conditions Exceeded WQPS concentration limits for multiple inorganic and organic constituents in groundwater from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order 6-00-18 MRP I.A.3.a. and b. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1090748 04/09/2021 Order Conditions Concentrations for many constituents of concern in soil gas exceed the method detection limit from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. . Violates Board Order WDR MRP I.B.3 Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1090744 04/09/2021 Failure to Notify Failure to include a transmittal letter with essential points pointed out, including a discussion of violations and actions taken or planned for correcting those violations. Violates Board Order 00-18 MRP Req. III. A. 2. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1090743 08/03/2020 Failure to Notify Failure to include a transmittal letter with essential points pointed out, including a discussion of violations and actions taken or planned for correcting those violations. Violates Board Order 00-18 MRP Req. III. A. 2. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1090737 08/03/2020 Order Conditions Exceeded WQPS concentration limits for multiple inorganic and organic constituents in groundwater from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. Violates Board Order 6-00-18 MRP I.A.3.a. and b. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1090732 08/03/2020 Order Conditions Concentrations for many constituents of concern in soil gas exceed the method detection limit from a historical discharge of the former unlined landfill FTIR-01. No known discharges from the active cell. . Violates Board Order WDR MRP I.B.3 Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1090730 08/03/2020 Unauthorized Discharge The Army continues to operate Cell 1A over capacity while Cell 1B is built and operable. Violation of Board Order 00-18, WDR Item IV.G. Violation N Report Fort Irwin Class III Landfill 148187 00-018 Y
1090362 01/14/2021 Groundwater Exceeded MCLs and SMCLs for the following constituents. Chloride(250/500mg/L), Nitrate (as N) (10mg/L), Sulfate (250/500mg/L), Total Dissolved Solids (500/1000mg/L), Arsenic (0.010mg/L), Total Chromium(0.05 mg/L), Iron(0.3mg/L), Nickel (0.1 mg/L), Selenium (0.001mg/L) Violating Board Order RV6-2002-0019 Section 2. B.1. d. Violation N Report Main Base Class III Landfill 132096 R6V-2002-0019 N
1089803 10/30/2020 Late Report The 2020 Quarter 3 Monitoring Report was due on 10/30/2020 and was turned in on 12/8/2020. 39 Days Late. Violates Board Order R6V-2020-0031 MRP IV.A. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 N
1089802 09/28/2020 Groundwater Exceeded WQPS of Iron, Mercury, and WAD Cyanide during the 2020 Quarter 3 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 N
1089801 09/28/2020 Deficient Reporting (1) Groundwater Elevation Data was not included in the 2020 Quarter 3 report and the resulting maps illustrating groundwater elevation, direction, velocity, and isocontours are also missing. Violates Board Order R6V-2020-0031 MRP IV.1.d. (2) Copies of field monitoring and well sampling data sheets were not included in the 2020 Quarter 3 report. Violates Board Order R6V-2020-0031 MRP IV.1.h. (3) Surface Impoundments were not sampled during the 2020 Quarter 3 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.1. (4) Surface Impoundment sludge was not sampled during the 2020 Quarter 3 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.2. ¿ Attachment A (5) Missing a letter transmitting the essential points of each report, including a discussion of any violations found since the last report was submitted and describing actions taken or planned for correcting those violations. Violates Board Order R6V-2020-0031 MRP IV.A.1.J. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 N
1089797 01/25/2021 Groundwater Exceeded WQPS of Iron and WAD Cyanide during the 1st Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1089796 01/25/2021 Deficient Reporting (1) Groundwater Elevation Data was not included in the 1st Quarter 2021 report and the resulting maps illustrating groundwater elevation, direction, velocity, and isocontours are also missing. Violates Board Order R6V-2020-0031 MRP IV.1.d. (2) Copies of field monitoring and well sampling data sheets were not included in the 1st Quarter 2021 report. Violates Board Order R6V-2020-0031 MRP IV.1.h. (3) Surface Impoundment sludge was not sampled during the 1st Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.2. ¿ Attachment A (4) Missing a letter transmitting the essential points of each report, including a discussion of any violations found since the last report was submitted and describing actions taken or planned for correcting those violations. Violates Board Order R6V-2020-0031 MRP IV.A.1.J. (5) Surface Impoundments were not sampled for all Quarterly Monitoring Parameters during the 1st Quarter 2021 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.2. ¿ Attachment A Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1089791 01/30/2021 Order Conditions The Discharger failed to submit a report indicating that the know or reasonably foreseeable release plan is in conformance with existing Facility Conditions by January 30,2021. Violates Board Order No. R6V-2020-0031, Provisions, Section IV.E Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1089790 01/30/2021 Order Conditions The Discharger failed to submit a report indicating the Preliminary Closure and Post-closure Maintenance plan report is in conformance with existing Facility operations by January 30,2021. Violates Board Order No. R6V-2020-0031, Provisions, Section IV.D Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1089789 10/30/2020 Order Conditions The Discharger failed to submit a separate Financial Assurance Instrument providing adequate funding for corrective action of a known and reasonably foreseeable release by October 30, 2020. Violates Board Order No. R6V-2020-0031, Provisions, Section V.B.3 Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1089788 10/30/2020 Order Conditions The Discharger failed to submit a separate Financial Assurance Instrument providing adequate funding for post-closure monitoring and maintenance activities by October 30, 2020. Violates Board Order No. R6V-2020-0031, Provisions, Section V.B.2 Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1089786 10/30/2020 Order Conditions The Discharger failed to submit a separate Financial Assurance Instrument providing adequate funding for closure activities by October 30, 2020. Violates Board Order No. R6V-2020-0031, Provisions, Section V.B.1 Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1089785 09/01/2020 Order Conditions The Discharger failed to submit a technical report proposing an EMP by September 1, 2020. Violates Board Order No. R6V-2020-0031, Provisions, Section V.A Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1088951 01/04/2021 CAT1 Nitrite Plus Nitrate (as N) Monthly Average (Mean) limit is 0.23 mg/L and reported value was 0.41 mg/L at M-004. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1088948 01/04/2021 CAT1 Nitrite Plus Nitrate (as N) Monthly Average (Mean) limit is 0.23 mg/L and reported value was 0.49 mg/L at M-002. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1088944 01/04/2021 CAT1 Nitrite Plus Nitrate (as N) Monthly Average (Mean) limit is 0.23 mg/L and reported value was 0.43 mg/L at M-003. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1088943 01/04/2021 CAT1 Nitrite Plus Nitrate (as N) Monthly Average (Mean) limit is 0.23 mg/L and reported value was 0.47 mg/L at M-001. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1088924 03/01/2021 OEV Flow Daily Maximum limit is 3.8 MGD and reported value was 4.1 MGD at M-003. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1088340 01/31/2021 Late Report 2020 Annual SMR was due on 1/30/2021, but was not turned in. Violated Board Order No. R6V-97-95 MRP II. Violation N Report Baker WTF 147595 97-095 N
1088171 03/02/2021 Late Report The 2020 Annual Monitoring Report was due on 3/1/2021 but was not turned in. Violates Board Order WQ 2014-0153-DWQ MRP III. Violation N Report Antelope Acres Commercial Center 415718 2014-0153-DWQ N
1088170 02/02/2021 Late Report The Quarter 4 2020 Monitoring Report was due on 2/1/2021 but was not turned in. Violates Board Order WQ 2014-0153-DWQ MRP III. Violation N Report Antelope Acres Commercial Center 415718 2014-0153-DWQ N
1088169 08/02/2020 Late Report The Quarter 2 2020 Monitoring Report was due on 8/1/2020 but was not turned in. Violates Board Order WQ 2014-0153-DWQ MRP III. Violation N Report Antelope Acres Commercial Center 415718 2014-0153-DWQ N
1088166 08/02/2020 Late Report The Quarter 3 2020 Monitoring Report was due on 11/1/2020 but was not turned in. Violates Board Order WQ 2014-0153-DWQ MRP III. Violation N Report Antelope Acres Commercial Center 415718 2014-0153-DWQ N
1088069 01/16/2021 Late Report Quarter 4 2020 monitoring report was due on 1/15/2021, but was not turned in. Violated Board Order No. R6V-02-039 MRP II. Violation N Report Big Pine Indian RES WTF 131472 02-039 Y
1088066 01/16/2021 Late Report Annual 2020 monitoring report was due on 1/1/2021, but was not turned in. Violated Board Order No. R6V-02-039 MRP II. Violation N Report Big Pine Indian RES WTF 131472 02-039 Y
1087930 07/13/2020 Groundwater Exceeded MCL limits for Arsenic (0.010mg/L or 10 µg/L), Violating Board Order R6V-2015-0004 Section WDR I.4.B.1.a.&b. Violation N Report Fort Irwin Waterworks 398263 R6V-2015-0004 N
1087929 09/23/2020 Order Conditions LCRS readings exceeded the Permit action rate for Chloride (>10,000), Sodium (>10,000), and Specific Conductance (>12,500 μmhos/cm). Violating Board order R6V-2015-0004, WDR section II.D. Table 6. Violation N Report Fort Irwin Waterworks 398263 R6V-2015-0004 Y
1087915 11/04/2020 Deficient Reporting (1) Wells MW-2B, MW-3, MW-4, MW-5, and MW-6 were not sampled for all Quarterly Monitoring Parameters during the 4th Quarter 2020 monitoring period. Violates Board Order R6V-2020-0031 MRP I.A. Attachment A (2) The Pregnant Pond - Surface Impoundment was not sampled for all Quarterly Monitoring Parameters during the 4th Quarter 2020 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.2. Attachment A (3) The Make Up Pond Surface Impoundment was not sampled during the 4th Quarter 2020 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.1. (4) Surface Impoundment sludge was not sampled during the 4th Quarter 2020 monitoring period. Violates Board Order R6V-2020-0031 MRP II.A.2. Attachment A Violation N Report Briggs Mine Project 438638 R6V-2020-0031 N
1087914 11/04/2020 Groundwater Exceeded WQPS of Iron and WAD Cyanide during the 4th Quarter 2020 monitoring period. Violates Board Order R6V-2020-0031 MRP I.C.1. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 N
1087911 01/30/2021 Deficient Reporting The 2020 Annual Monitoring Report was due on 01/30/2021 but was not turned in. 52 days late as of 03/23/2021. Violates Board Order R6V-2020-0031 MRP IV.A. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1087872 01/14/2021 Order Conditions Failed to enter Project into EcoAtlas within 30 days of permit issuance. Violation of Board Order R6T-20003-0004, condition 1. Violation N Report Eland Solar 439918 R6T-2003-0004 Y
1087868 02/19/2021 OEV Flow Daily Maximum limit is 3.8 MGD and reported value was 3.9 MGD at M-003. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1087391 01/31/2021 Deficient Reporting (1) Groundwater Elevation Data was not included in the 2020 Quarter 4 report and the resulting maps illustrating groundwater elevation, direction, velocity, and isocontours are also missing. Violates Board Order R6V-2020-0031 MRP IV.1.d. (2) Copies of field monitoring and well sampling data sheets were not included. Violates Board Order R6V-2020-0031 MRP IV.1.h. Violation N Report Briggs Mine Project 438638 R6V-2020-0031 Y
1086966 07/29/2020 Deficient Monitoring Effluent analysis of chromium VI and receiving water analyses of chromium VI and cyanide did not occur in the annual sample collected in July 2020 for priority pollutant monitoring. Violation N eSMR Victor Valley Wastewater Reclamation Authority WTP 420359 R6V-2020-0028 N
1086345 01/21/2021 OEV Flow Daily Maximum limit is 3.8 MGD and reported value was 4.6 MGD at M-003. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1085821 08/19/2020 CAT1 Iron, Total Single Sample Maximum limit is 300 ug/L and reported value was 730 ug/L. Violation N Report Airforce Research Lab STP 146721 99-033 N
1085820 08/19/2020 CAT2 Arsenic, Total Single Sample Maximum limit is 10 ug/L and reported value was 13 ug/L. Violation N Report Airforce Research Lab STP 146721 99-033 N
1085816 12/31/2020 Deficient Monitoring Failed to report several parameters for BOD, dissolved oxygen, MBAS, and pH values. Violating Board Order 6-99-033 3 I. Monitoring B. Facility, Effluent Monitoring Violation N Report Airforce Research Lab STP 146721 99-033 Y
1084240 10/15/2020 Late Report Submitted 3rd Qtr. Report 60 days Late Violating Board Order R6V-2015-0004 MRP IV. B. Violation N Report Fort Irwin Waterworks 398263 R6V-2015-0004 Y
1083180 11/24/2020 OEV Flow Daily Maximum limit is 3.8 MGD and reported value was 4.3 MGD at M-003. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1082421 05/26/2020 Groundwater Exceed WQPS of Chloride, pH, Total Dissolved Solids (TDS), and Trichlorofluoromethane (CFC-11) during the 2020 1st Half Semi Annual monitoring period. Violates Board Order R6T-2010-0025 WDR II.A.12 Violation N Report Walker Landfill 374652 R6T-2010-0025 N
1082414 05/26/2020 Groundwater Exceeded the MDL for 1,1-Dichloroethane, 1,4-Dichlorobenzene, Benzene, Dichlorodifluoromethane, Ethylbenzene, Tetrachloroethene, Toluene, Total Xylenes, Trichloroethene, and Trichlorofluoromethane during the 2020 1st half Semi-annual monitoring period. Violates R6T-2009-0019 WDR II.A.12. Violation N Report Bridgeport SWDS 365968 R6T-2009-0019 N
1082314 09/25/2020 Order Conditions On September 25, 2020, Water Board staff were notified of a BAP 6 release. U.S. Borax representatives observed airborne waste material (dust) above BAP 6 during a windy afternoon. Upon closer inspection of BAP 6, waste material was observed to have been deposited outside the WMU on the access road adjacent to the BAP 6 surface impoundment embankment. Violation of Requirements and Prohibitions, Section II.A.3. Violation N Inspection Boron Mine Facility 403003 R6V-2015-0057 Y
1082292 10/15/2020 Late Report No SMR submitted.Violates Board Order 6-95-37 MRP II.B. Violation N Report Convict Lake Campground WTF 146807 95-037 Y
1082291 07/15/2020 Late Report Quarterly monitoring reports shall be submitted by the 15th day of the following quarter. The 2020 2nd Quarter Monitoring Report was due on 7/15/2020 but was not turned in. Violates Board Order 6-95-37 MRP II.B. Violation N Report Convict Lake Campground WTF 146807 95-037 N
1082287 10/15/2020 CAT1 Methylene Blue Active Substances (MBAS) Instantaneous Maximum limit is 2.0 mg/L and reported value was 9.6 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 N
1082286 10/15/2020 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 30-Day Average limit is 30.0 mg/L and reported value was 507.0 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 N
1082284 07/23/2020 Deficient Reporting Failed to provide results for parameters related to monitoring. Violated Board Order No. R6V-1994-0025 I.A.3. Violation N Report Bishop Sewage Treatment Plant 148110 94-025 N
1082283 07/23/2020 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 30-Day Average limit is 50.0 mg/L and reported value was 54.0 mg/L. Violation N Report Bishop Sewage Treatment Plant 148110 94-025 N
1082282 07/09/2020 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) 30-Day Average limit is 50.0 mg/L and reported value was 61.0 mg/L. Violation N Report Bishop Sewage Treatment Plant 148110 94-025 N
1082281 06/05/2020 Groundwater Exceeded MCL for TDS (1,000 mg/L) in one well during the first quarter of 2020. Violated Board Order No. R6V-1994-0025 I.B. Violation N Report Bishop Sewage Treatment Plant 148110 94-025 N
1082280 06/05/2020 Late Report The Quarter 1 2020 monitoring report was due on 4/15/2020 but was turned in late. Violated Board Order No. R6V-1994-0025 MRP II. Violation N Report Bishop Sewage Treatment Plant 148110 94-025 N
1082278 06/05/2020 Late Report The Quarter 4 2019 monitoring report was due on 1/15/2020 but was turned in late. Violated Board Order No. R6V-1994-0025 MRP II. Violation N Report Bishop Sewage Treatment Plant 148110 94-025 N
1082271 10/15/2020 Late Report Submitted 3rd Quarter SMR 63 days late. Violated Board Order No. R6V-1995-0035 MRP II.B. Violation N Report Big Pine STP 146559 95-035 Y
1082270 07/15/2020 Late Report No SMR submitted. Violated Board Order No. R6V-1995-0035 MRP II.B. Violation N Report Big Pine STP 146559 95-035 Y
1082263 10/15/2020 Late Report No SMR submitted. Violated Board Order No. R6V-2002-0039 MRP II.B Violation N Report Big Pine Indian RES WTF 131472 02-039 Y
1082262 07/15/2020 Late Report No SMR submitted. Violated Board Order No. R6V-2002-0039 MRP II.B Violation N Report Big Pine Indian RES WTF 131472 02-039 N
1082219 06/30/2020 Groundwater Exceeded practical quantitation limit (PQL) of 1,1-Dichloroethane, Dichlorodifluoromethane, Tetrachloroethene, and Trichloroethene during the 2019 2nd Half Semi-annual monitoring period. Violates Board Order R6V-2016-0037 MRP II.A.3.b.ii. Violation N Report Lancaster Sanitary LF & Recycling Center 404698 R6V-2016-0037 N
1082218 08/26/2020 Groundwater (1) Exceeded MCL or SMCL of Arsenic, Beryllium, Chromium, Lead, Manganese, and Total Dissolved Solids during the 2020 3rd Quarter monitoring period. Violates Board Order R6V-2016-0031 WDR I.B. (2) Exceeded Coliform Organisms during the 2020 3rd Quarter monitoring period. Violates Board Order R6V-2016-0031 WDR I.A. Violation N Report Victor Valley Regional Compost 406819 R6V-2016-0031 N
1082216 06/17/2020 Groundwater (1) Exceeded MCL or SMCL of Arsenic, Lead, Nitrate as N, Iron, and Manganese during the 2020 2nd Quarter monitoring period. Violates Board Order R6V-2016-0031 WDR I.B (2) Exceeded Coliform Organisms during the 2020 2nd Quarter monitoring period. Violates Board Order R6V-2016-0031 WDR I.A. Violation N Report Victor Valley Regional Compost 406819 R6V-2016-0031 N
1081354 11/11/2020 Sanitary Sewer Overflow/Spill/ Type: Category 2. Other (specify below);planned solar project tie in with all power to the facility being unavailable causing a surcharge in the collection system caused 6138.0 gallons of sewage to spill from Manhole;surcharging at lower manhole elevations at Adelanto Auburn & Bellflower St to Paved Surface;Unpaved surface. No surface water body affected. Violation N SSO Adelanto CS 301308 2022-0103-DWQ Y
1081352 10/05/2020 OEV Flow Daily Maximum limit is 3.8 MGD and reported value was 4.7 MGD at M-003. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1081208 10/07/2020 Deficient Reporting Failed to provide flow monitoring and effluent data for month of August 2020. Violated Board Order No. R6V-84-058 MRP. Violation N Report Bear Valley MHP WTF 145753 84-058 Y
1081206 07/15/2020 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Mean limit is 30.0 mg/L and reported value was 110.0 mg/L. Violation N Report Bear Valley MHP WTF 145753 84-058 N
1081040 10/30/2020 Other Codes Quarterly monitoring reports shall be submitted to the Regional Board by the 30th day following the end of each quarter via GeoTracker. Violates Board Order 6-00-16 MRP II.B and Amendment to MRP. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1081034 07/30/2020 Late Report Quarterly monitoring reports shall be submitted to the Regional Board by the 30th day following the end of each quarter. The 2020 2nd Quarter Monitoring Report was not turned in. Violates Board Order No. 6V-00-16 MRP II.B. Violation N Report Bishop Creek Camp Ground WTF 147527 00-016 N
1080603 07/20/2020 Deficient Monitoring Iron, manganese, and E. coli were not analyzed in effluent with the routine quarterly sampling performed July 20, 2020. The omission occurred due to following the Sampling and Analysis Plan (SAP) developed under the 2013 NPDES permit Monitoring & Reporting Program (MRP) (Order No. R6V-2013-0038). Under the 2013 MRP, iron, manganese, and E. coli were not required quarterly analyses in effluent. As the revised 2020 SAP had not been developed (it was due and submitted in September 2020) when 3rd quarter sampling was performed in July, analyses for iron, manganese, and E. coli were not requested. Violation of MRP R6V-2013-0038, section IV. EFFLUENT MONITORING REQUIREMENTS, Table E-3 , page E-4. Violation N eSMR Victor Valley Wastewater Reclamation Authority WTP 420359 R6V-2020-0028 Y
1080553 07/15/2020 Deficient Reporting The 2020 Semi-Annual 1st Half Monitoring Report was due on 7/15/2020 but was not turned in. Violates Board Order 83-104 MRP Reporting Violation N Report Calico Ghost Town REC Fac WTF 147184 83-104 Y
1080550 07/15/2020 Deficient Reporting The 2020 Quarter 2 Monitoring Report was due on 7/15/2020 but was not turned in. Violates Board Order 6-88-21 MRP II. Violation N Report Melina Square 146395 88-021 N
1080541 09/29/2020 OEV Flow Daily Maximum limit is 3.8 MGD and reported value was 4.5 MGD at M-003. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1080516 07/21/2020 Deficient Reporting Failed to provide Groundwater Monitoring data and parameters. Violates Board Order No. 6-99-037 MRP I.C. Violation N Report Barstow/Daggett Airport WTF 146725 99-037 Y
1080374 08/20/2020 Pretreatment The City permits require that the permittees to maintain records for three years, but do not specify that the record-retention period may be extended when requested by the state or EPA. Violation N Report SCLA Central WWTP-Victorville Water Dist 394630 R6V-2014-0002 N
1080316 07/15/2020 Deficient Reporting (1) Missing Sludge Monitoring for 2020 2nd quarter monitoring period. Violates Board Order 97-10-DWQ-08 MRP I.H. (2) Missing Operation and Maintenance Statement for 2020 2nd quarter monitoring period. Violates Board Order 97-10-DWQ-08 MRP I.I. Violation N Report RND Enterprises 347263 97-010-DWQ Y
1080314 07/13/2020 Deficient Monitoring (1) Violation Description: Missing Flow Monitoring Data for the 2020 Quarter 2 monitoring period. Violates Board Order R6V-2004-0018 MRP I.A. (2) Violation Description: Missing Groundwater Monitoring Semi-annual Parameters for the 2020 Quarter 2 monitoring period. Violates Board Order R6V-2004-0018 MRP I.C. Violation N Report Hilton Creek CSD Package STP 133595 04-018 Y
1080177 09/08/2020 Order Conditions Exceeded secondary (SMCL) MCL for TDS (500 mg/L) in one well during Q3 2020. Exceeding SMCL is due to elevated TDS in the effluent, violating Board Order R6V-01-32 WDR Section I.B.1.b. Violation N Report Baymont Inn Yermo Package WWTP 148382 01-032 N
1079939 08/20/2020 Pretreatment Board Order No. R6V-2014-0002, section No. II.F.1 requires that the Discharger submit a pretreatment program to the Water Board for approval. The content of the program submission must contain the information specified in the Federal regulations 40 CFR 403.9(b). The submitted pretreatment program by the Discharger is deficient in that it does not include adequate information required to comply with the requirements specified in 40 CFR 403.9(b). Violation N Report SCLA Central WWTP-Victorville Water Dist 394630 R6V-2014-0002 Y
1079894 07/16/2020 CAT1 Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C) Monthly Average limit is 30.0 mg/L and reported value was 1057.0 mg/L. Violation N Report Downtown Burger, Phelan 146149 93-016 Y
1079704 06/30/2020 OEV Flow Daily Maximum limit is 21000 gallons and reported value was 21666 gallons. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1079703 06/29/2020 OEV Flow Daily Maximum limit is 21000 gallons and reported value was 21942 gallons. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1079702 06/28/2020 OEV Flow Daily Maximum limit is 21000 gallons and reported value was 26214 gallons. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1079701 06/27/2020 OEV Flow Daily Maximum limit is 21000 gallons and reported value was 28084 gallons. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1079700 06/26/2020 OEV Flow Daily Maximum limit is 21000 gallons and reported value was 27096 gallons. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1079699 06/25/2020 OEV Flow Daily Maximum limit is 21000 gallons and reported value was 27884 gallons. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1079698 06/24/2020 OEV Flow Daily Maximum limit is 21000 gallons and reported value was 27741 gallons. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1079697 06/23/2020 OEV Flow Daily Maximum limit is 21000 gallons and reported value was 25900 gallons. Violation None Report Salt Wells Propul. Labs 146498 94-053 Y
1079696 06/22/2020 OEV Flow Daily Maximum limit is 21000 gallons and reported value was 25900 gallons. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1079695 06/21/2020 OEV Flow Daily Maximum limit is 21000 gallons and reported value was 25439 gallons. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1079694 06/20/2020 OEV Flow Daily Maximum limit is 21000 gallons and reported value was 21751 gallons. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1079693 06/04/2020 OEV Flow Daily Maximum limit is 21000 gallons and reported value was 22405 gallons. Violation N Report Salt Wells Propul. Labs 146498 94-053 Y
1079583 07/29/2020 Unauthorized Discharge During the inspection, a leaking gate valve was noticed at former oxidation ponds, resulting in unauthorized discharge of recycled water. Violates Order R6V-2-11-0012, General Requirements and Prohibitions, Sections I.F.1., 7. and 8. Violation N Inspection Palmdale Water Reclamation Plant 382094 R6V-2011-0012 Y
1078955 06/24/2020 Deficient Reporting (1) Missing the average flow rate of wastewater to the treatment facility calculated for each month for the 2020 2nd Quarter monitoring period. Violates Board Order 6-88-1 MRP I.A.1. (2) Missing Operation and Maintenance summary for the 2020 2nd Quarter monitoring period. Violates Board Order 6-88-1 MRP I.C.1-5. Violation N Report Bear Valley Firestone 146391 88-001 N
1078949 07/15/2020 Late Report The 2020 1st Half Semi-annual Monitoring Report was due on 7/15/2020 and was turned in on 8/5/2020. 21 Days Late. Violates Board Order 6-01-56 MRP IV.D. Violation N Report Pumice Valley Class III LF 148481 01-056 Y
1078497 05/26/2020 Groundwater (1) Exceeded Practical Quantitation Limit (0.5 ug/L): 1,1-Dichloroethane, Dichlorodifluoromethane, Tetrachloroethene, Trichloroethene (TCE), and Trichlorofluoromethane during the 2020 Semi-annual 1st Half monitoring Period. Violates Board Order 6-01-34 MRP I.A.b.ii. (2) Exceeded the Primary MCL of Nitrate and Total Dissolved Solids during the 2020 Semi-annual 1st Half monitoring Period. Violates Board Order 6-01-34 WDR I.A.2. b. Violation N Report Bishop(Sunland)Class III LF 148395 01-034 N
1078013 07/07/2020 OEV Flow Daily Maximum limit is 3.8 MGD and reported value was 4.1 MGD at M-003. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1077697 08/03/2020 OEV Total Coliform 7-Day Median limit is 2.2 MPN/100 mL and reported value was 4.5 MPN/100 mL at EFF-001. *** Dismissed:Duplication of violation 1074976 Violation N eSMR Victor Valley Wastewater Reclamation Authority WTP 420359 R6V-2020-0028 N
1077696 08/04/2020 OEV Total Coliform 7-Day Median limit is 2.2 MPN/100 mL and reported value was 4.5 MPN/100 mL at EFF-001. *** Dismissed:Duplication of violation 1074977 Violation N eSMR Victor Valley Wastewater Reclamation Authority WTP 420359 R6V-2020-0028 N
1077695 08/16/2020 OEV Total Coliform 7-Day Median limit is 2.2 MPN/100 mL and reported value was 4.5 MPN/100 mL at EFF-001. *** Dismissed:Duplication of violation 1074976. Violation N eSMR Victor Valley Wastewater Reclamation Authority WTP 420359 R6V-2020-0028 N
1077598 06/29/2020 OEV Flow Daily Maximum limit is 3.8 MGD and reported value was 4 MGD at M-003. Violation N eSMR Hot Creek Hatchery NPDES 306644 R6V-2006-0027 Y
1076794 06/22/2020 Deficient Reporting Monitoring reports do not contain the "Calculation of Concentration" information required as part of the Quarterly Drug Use and Chemical Report (MRP Section IX.A). Violation N Inspection Fish Springs Fish Hatch NPDES 401623 R6V-2015-0034 N
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 1325
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
Total Enforcement Actions: 0
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 05/23/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page