Violation ID |
Occurrence Date |
Violation Type |
Violation Description(+) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
1134816 |
10/17/2024 |
Other Codes |
Illicit cannabis cultivation w/o enrollment (WC violation 13260), discharges of |
Violation |
None |
Inspection |
Arturo Medina Property |
448121 |
None |
Y |
1137700 |
04/15/2024 |
Late Report |
Q1 2024 Report was submitted late |
Violation |
None |
Report |
Fort Cady Borate |
146400 |
88-063 |
Y |
1131541 |
08/20/2024 |
Sanitary Sewer Overflow/Spill/ |
Type: Category 1 Spill; Damage by Others Not Related to Collection System Constr |
Violation |
None |
SSO |
June Lake PUD CS |
301016 |
2022-0103-DWQ |
N |
1136174 |
03/31/2024 |
CAT2 |
Tetrachloroethene Monthly Maximum limit is 0.5 ug/L and reported value was 1.41 |
Violation |
None |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1131720 |
08/20/2024 |
Sanitary Sewer Overflow/Spill/ |
Type: Category 1 Spill; Debris from Construction,Damage by Others Not Related to |
Violation |
None |
SSO |
June Lake PUD CS |
301016 |
2022-0103-DWQ |
N |
1125983 |
04/03/2024 |
Order Conditions |
Violation of Board Order 6-01-34, Section I.B.1, Section II.A.7, Section II.A.4, |
Violation |
None |
Inspection |
Bishop(Sunland)Class III LF |
148395 |
01-034 |
Y |
1131504 |
08/20/2024 |
Sanitary Sewer Overflow/Spill/ |
Type: Category 1 Spill; Damage by Others Not Related to Collection System Constr |
Violation |
None |
SSO |
June Lake PUD CS |
301016 |
2022-0103-DWQ |
N |
1131742 |
08/28/2024 |
Sanitary Sewer Overflow/Spill/ |
Type: Category 1 Spill; Root Intrusion caused 457 gallons of sewage to spill fro |
Violation |
None |
SSO |
Barstow CS |
301313 |
2022-0103-DWQ |
N |
1136178 |
06/30/2024 |
CAT2 |
Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value |
Violation |
None |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1136177 |
06/30/2024 |
CAT2 |
Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value w |
Violation |
None |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1136172 |
03/31/2024 |
CAT2 |
Tetrachloroethene Monthly Maximum limit is 0.5 ug/L and reported value was 1.4 u |
Violation |
None |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1134607 |
09/26/2024 |
Order Conditions |
Water Board staff observed standing water in a corral flowing from a drinking wa |
Violation |
None |
Inspection |
Desert Oasis Dairy |
146874 |
96-009 |
Y |
1135572 |
10/24/2024 |
Order Conditions |
Trash/litter observed out of containment, Violated BO 6-01-34, Section II.A.1 an |
Violation |
None |
Inspection |
Bishop(Sunland)Class III LF |
148395 |
01-034 |
N |
1134605 |
09/26/2024 |
Order Conditions |
Wastewater surrounding sump pump #2. The area requires maintenance to assess the |
Violation |
None |
Inspection |
Desert Oasis Dairy |
146874 |
96-009 |
Y |
1132808 |
04/15/2024 |
Deficient Reporting |
Q1 2024 Monitoring Report never submitted, no data available |
Violation |
None |
Report |
Fort Cady Borate |
146400 |
88-063 |
Y |
1136176 |
03/31/2024 |
CAT2 |
Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value w |
Violation |
None |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1134817 |
10/17/2024 |
Basin Plan Prohibition |
Discharges of hazardous materials, R6 BPP#3 |
Violation |
None |
Inspection |
Arturo Medina Property |
448121 |
None |
Y |
1125985 |
04/03/2024 |
Order Conditions |
Violation of Board Order 6-01-34, Standard Provisions 2.b - Pursuant to Californ |
Violation |
None |
Inspection |
Bishop(Sunland)Class III LF |
148395 |
01-034 |
Y |
1139771 |
01/21/2025 |
Deficient Monitoring |
Lysimeter B01-01 failed to hold vacuum during sampling, both under the new propo |
Violation |
None |
Inspection |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1136173 |
03/31/2024 |
CAT2 |
Arsenic, Total Recoverable Monthly Maximum limit is 10 ug/L and reported value w |
Violation |
None |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1137695 |
04/15/2024 |
Deficient Monitoring |
Q1 2024 Required sampling was not performed. |
Violation |
None |
Report |
Fort Cady Borate |
146400 |
88-063 |
Y |
1131592 |
09/04/2024 |
Order Conditions |
Violation of BO 6-91-95 Section, I.D.1 |
Violation |
None |
Inspection |
Soil Safe-Adelanto Soil Recycling Center |
146138 |
91-935 |
Y |
1136180 |
09/30/2024 |
CAT2 |
Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value |
Violation |
None |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1134446 |
09/09/2024 |
Unauthorized Discharge |
Soil Safe is in violation for failure to obtain a 401 certification or dredge an |
Violation |
None |
Complaint |
Mojave Drive west of Fremontia Road |
458757 |
None |
Y |
1136179 |
09/30/2024 |
CAT2 |
Arsenic, Total Recoverable Monthly Maximum limit is 10.0 ug/L and reported value |
Violation |
None |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1139767 |
01/21/2025 |
Unauthorized Discharge |
Discharge of windblown litter around perimeter fencing. Violates Board Order R6V |
Violation |
None |
Inspection |
Boron Class III Landfill |
404752 |
R6V-2016-0004 |
Y |
1138182 |
04/01/2024 |
Deficient Monitoring |
All analyses shall be performed in accordance with the current edition(s) of the |
Violation |
N |
Report |
Airforce Research Lab STP |
146721 |
99-033 |
N |
1139210 |
06/30/2024 |
Deficient Reporting |
The total volume of wastewater flow to the facility for each day and maximum ins |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1138645 |
12/10/2024 |
Late Report |
Draft 2Q24 domestic well sampling report received 9/23/24; revised report reques |
Violation |
N |
Report |
Green Valley Foods |
416725 |
None |
N |
1137154 |
12/10/2024 |
Late Report |
SEL email sent 10/10/24 re late report violation (Sept 2024 report was due 10/15 |
Violation |
N |
Report |
Green Valley Foods |
383647 |
R6V-2012-0006 |
N |
1131257 |
04/24/2024 |
Surface Water |
General requirements and Prohibitions, there shall be no discharge, grease, or o |
Violation |
N |
Report |
Airforce Research Lab STP |
146721 |
99-033 |
N |
1131256 |
04/17/2024 |
Deficient Monitoring |
Eight-hour composite samples of the effluent from the Facility shall be collecte |
Violation |
N |
Report |
Airforce Research Lab STP |
146721 |
99-033 |
N |
1139209 |
03/30/2024 |
Deficient Reporting |
The total volume of wastewater flow to the facility for each day, total volume o |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1139211 |
04/30/2024 |
Order Conditions |
Freeboard Instantaneous Minimum limit is 24 inches and reported value was 20 inc |
Violation |
N |
Report |
Bishop Creek Camp Ground WTF |
147527 |
00-016 |
N |
1136465 |
11/21/2024 |
Late Report |
Report 2 30-day periods late |
Violation |
N |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1136420 |
11/21/2024 |
Late Report |
Late for 31 30-day periods as of 11/21/2024 |
Violation |
N |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1136447 |
11/21/2024 |
Late Report |
Report 15 30-day periods late |
Violation |
N |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1135714 |
06/30/2024 |
Deficient Monitoring |
Failed to sample required wells, determine direction of flow and gradient, and m |
Violation |
N |
Report |
Segs 8&9 Three Surface Impoundments & Land Treatment Unit |
146719 |
98-074 |
Y |
1131254 |
04/01/2024 |
Deficient Monitoring |
Failed to provide results for several parameters related to flow monitoring. Vio |
Violation |
N |
Report |
Airforce Research Lab STP |
146721 |
99-033 |
N |
1136451 |
11/21/2024 |
Late Report |
Report 12 30-day periods late |
Violation |
N |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1136437 |
11/21/2024 |
Late Report |
Report 22 30-day periods late as of 11/21/2024 |
Violation |
N |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1136855 |
09/30/2024 |
Deficient Monitoring |
Sampling for Q3 2024 not performed |
Violation |
N |
Report |
NuWay Former Dry Cleaners |
450938 |
R6-2022-0020 |
Y |
1136440 |
11/21/2024 |
Late Report |
Report 18 30-day periods late |
Violation |
N |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1137701 |
07/15/2024 |
Deficient Monitoring |
Q2 2024 Samples were not collected and report submitted late without data. |
Violation |
N |
Report |
Fort Cady Borate |
146400 |
88-063 |
Y |
1137108 |
10/20/2024 |
Unauthorized Discharge |
Spill occurred on October 20, 2024. The spill volume ranged between 15,000 to 20 |
Violation |
N |
Complaint |
Furn Crk Inn & Ranch Pack STP |
404755 |
2014-0153-DWQ |
Y |
1136458 |
11/21/2024 |
Late Report |
Report 8 30-day period late |
Violation |
N |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1136436 |
11/21/2024 |
Late Report |
Report 25 30-day periods late as of 11/21/2024 |
Violation |
N |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1136435 |
11/21/2024 |
Late Report |
Report 28 30-day periods late as of 11/21/2024 |
Violation |
N |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
1136463 |
11/21/2024 |
Late Report |
Report 5 30-day period late |
Violation |
N |
Report |
Plant GW Treatment System - National Cement |
445491 |
R6T-2016-0011 |
Y |
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
|