Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
S618658 Zinkin Development Privately-Owned Business 5 River Park Place West Suite 203 Fresno, CA 93720 N/A N/A
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
S917772 Sugar Pine Square Shop A & B Fresno 5F Facility Discharger 11/22/2023 None
S894451 Park Crossing Phase 2 Fresno 5F Facility Discharger 06/02/2021 None
S857713 Zinkin 3 Story Fresno 5F Facility Discharger 07/28/2017 None
S832279 Building Pad E Fresno 5F Facility Discharger 10/16/2014 None
S816836 McCormick Barstow Fresno 5F Facility Discharger 05/14/2012 None
Total Related Places: 5
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
N/A Phil Andrews Contact Owner Contact N/A N/A N/A
N/A Phillip Andrews Contact Owner Contact N/A N/A N/A
N/A Thomas Hancock Contact Owner Contact N/A N/A N/A
Total Related Parties: 3
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
Total Regulatory Measures: 0
  
  
  
  
Expand/Contract Violations
Violations within the past five years
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
S894977 09/02/2025 SW - Failure to Obtain Permit Failure to obtain coverage under the 2022 CGP by 09/01/2025. Violation N Internal Report Park Crossing Phase 2 S536723 2009-0009-DWQ Y
S894698 09/02/2025 SW - Failure to Obtain Permit Failure to obtain coverage under the 2022 CGP by 09/01/2025. Violation N Internal Report Zinkin 3 Story S489437 2009-0009-DWQ Y
S888710 12/08/2023 SW - Late Report Violation 1. A review of the SMARTS database system shows that the Discharger failed to submit the following Annual Reports: ? Report ID: 1205989 (Report Period: 2022-23) ? Report ID: 1159208 (Report Period: 2021-22) ? Report ID: 1129065 (Report Period: 2020-21) ? Report ID: 1016618 (Report Period: 2018-19) Violation N Inspection Zinkin 3 Story S489437 2009-0009-DWQ Y
S885566 11/02/2022 SW - Deficient BMP Implementation Attachment D, Part E.6. Sediment Controls, which states: Additional Risk Level 2 Requirement: Risk Level 2 dischargers shall ensure that all storm drain inlets and perimeter controls, runoff control BMPs, and pollutant controls at entrances and exits (e.g. tire washoff locations) are maintained and protected from activities that reduce their effectiveness. Violation N Inspection Park Crossing Phase 2 S536723 2009-0009-DWQ Y
S885565 11/02/2022 SW - Deficient BMP Implementation Attachment D, Part E.1. Sediment Controls, which states: Risk Level 2 dischargers shall establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site. Violation N Inspection Park Crossing Phase 2 S536723 2009-0009-DWQ Y
S885564 11/02/2022 SW - Deficient Report Section VIII. Risk Determination, which states: The discharger shall calculate the site's sediment risk and receiving water risk during periods of soil exposure (i.e. grading and site stabilization) and use the calculated risks to determine a Risk Level(s) using the methodology in Appendix 1. For any site that spans two or more planning watersheds,13 the discharger shall calculate a separate Risk Level for each planning watershed. The discharger shall notify the State Water Board of the site?s Risk Level determination(s) and shall include this determination as a part of submitting the PRDs. If a discharger ends up with more than one Risk Level determination, the Regional Water Board may choose to break the project into separate levels of implementation. Violation N Internal Report Park Crossing Phase 2 S536723 2009-0009-DWQ Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 6
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
S459826 Notice of Violation None 5F10C395233 CONSTW 09/05/2025 Active
S459547 Notice of Violation None 5F10C384444 CONSTW 09/05/2025 Active
S453098 Notice of Violation None 5F10C384444 CONSTW 12/08/2023 Active
S450340 Notice of Violation None 5F10C395233 CONSTW 05/19/2023 Active
Total Enforcement Actions: 4
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
Total Regulatory Measures linked to Related Parties: 0
  
  
The current report was generated with data as of: 05/19/2026
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page