Failure to implement construction entrance BMPs, maintenance of storm water conveyance system, properly manage waste, failure to protect construction materials, failure to implement erosion controls, and failure to provide correct information in SWPPP.
Violation
N
Inspection
Pure Water Program Morena Conveyance South & Middle
S555446
2009-0009-DWQ
Y
S890668
11/17/2024
SW - Effluent
Citizen complaint documented unauthorized trench dewatering discharge to the City of San Diego's MS4.
Violation
N
Inspection
Pure Water Program Morena Conveyance South & Middle
S555446
2009-0009-DWQ
Y
S890667
11/18/2024
SW - Incomplete/Insufficient SWPPP
CGP Attachment A. section K. Failure to provide necessary and correct information.
Violation
N
Inspection
Pure Water Program Morena Conveyance South & Middle
S555446
2009-0009-DWQ
Y
S890666
11/18/2024
SW - Deficient BMP Implementation
1. CGP Attachment A, section J.1.ii. Failure to implement Best Management Practices (BMPs) to minimize or prevent pollutants in storm water discharges. 2. CGP Attachment A, section J.2.a.iv. Failure to minimize exposure of construction materials to precipitation. 3. CGP Attachment A, section J.2.a.v. Failure to implement BMPs to control off-site tracking of loose construction and landscape materials. 4. CGP Attachment A, section J.2.b.v. Failure to prevent discharges from waste disposal containers to the storm water drainage system or receiving water. 5. CGP Attachment A, section J.2.c.i. and ii. Failure to implement BMPs to prevent vehicle oil, grease, or fuel from leaking into the ground, storm drains or surface waters. 6. CGP Attachment A, section J.4.b. Failure to provide effective soil cover. 7. CGP Attachment A. section J.5.a. Failure to implement perimeter control BMPs. 8. CGP Attachment A. section J.5.c. Failure to implement linear sediment control BMPs.
Violation
N
Inspection
Pure Water Program Morena Conveyance South & Middle
S555446
2009-0009-DWQ
Y
S877971
11/04/2021
SW - Deficient BMP Implementation
CCTV inspection. Sediment is discharging onto the parking lot pavement - See attached pics. Area that needs additional perimeter controls installed is depicted in red in attachment. Corrective action required.
Violation
N
Inspection
NCWRP Expansion Pkg 4 Early Site Work & Ozone BAC Relocation and NCWRPE & Influent PS & Pipeline
S495654
2009-0009-DWQ
Y
S877421
08/13/2021
SW - Deficient BMP Implementation
CCTV inspection. Sunny at time of insp. Track out seen at west entrance. And rock needs replenishing inside of entrance (50 feet in distance) to prevent track out at west entrance. See attached pics.Piggyback trucks taking soil offsite. Const activity going on at the time of the insp. BMPs (fiber rolls) removed across site. Pile of broken up asphalt seen at south west end of site. Crane seen onsite near middle of site working in excavation. Concrete pipe seen near excavation.
Violation
N
Inspection
North City Pure Water Mass Grading & Clearing and Pure Water Facility & Pure Water Pump Station
S496392
2009-0009-DWQ
N
S877220
07/30/2021
SW - Deficient BMP Implementation
CCTV inspection. Track out seen at west entrance. Sunny at time of insp. Const activity going on at the time of the insp. Const office trailers are onsite at the south end. BMPs (fiber rolls) removed across site. Lots of covered (blue tarps) piles assumed to be lumber since they are rectangular in shape. Crane seen onsite near middle of site working in excavation. Concrete pipe seen near excavation.
Violation
N
Inspection
North City Pure Water Mass Grading & Clearing and Pure Water Facility & Pure Water Pump Station
S496392
2009-0009-DWQ
N
S876796
04/16/2021
SW - Deficient BMP Implementation
Inspection in response to a complaint. I observed two construction site entrances that were not stabilized. There were multiple areas/locations along the construction project alignment that were not stabilized. I observed lack of implementation of erosion controls, linear sediment controls. and perimeter controls per CGP Risk Level 1 requirements. City of SD has issued a Stop Work Order. See attached photos.
Violation
N
Inspection
Market St 47th to Euclid Ave Street Water & Sewer Replacement Project
S525178
2009-0009-DWQ
Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 8
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
Total Regulatory Measures linked to Related Parties: 0
The current report was generated with data as of: 05/23/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.