Gravel was placed in seven stream channels to facilitate traffic without permits
Violation
N
Inspection
PG&E Ukiah Access Road
460874
None
Y
1131744
08/27/2024
Unauthorized Discharge
A frac-out of drilling fluid (bentonite mixture) occurred while conducting horiz
Violation
None
Report
PG&E Freestone Frac-Out
458373
None
Y
1122086
08/10/2023
Unauthorized Discharge
Failure to obtain Clean Water Act section 401 authorization for the discharge of
Violation
N
Report
Butte Canal Debris Flow Mitigation Project
454608
2023-0061-DWQ
Y
1116484
12/12/2022
Basin Plan Prohibition
Placing or disposal of sand, silt, clay, bark, slash, sawdust, or other organic
Violation
None
Inspection
Rocky Creek Sediment Removal Project
452559
None
Y
1116483
12/12/2022
Basin Plan Prohibition
The discharge or threatened discharge of sand, silt, clay, bark, slash, sawdust,
Violation
None
Inspection
Rocky Creek Sediment Removal Project
452559
None
Y
1116482
09/22/2022
Basin Plan Prohibition
The placing or disposal of soil, silt, bark, slash, sawdust, or other organic an
Violation
None
Inspection
Rocky Creek Sediment Removal Project
452559
None
Y
1116481
09/22/2022
Basin Plan Prohibition
The discharge or threatened discharge of soil, silt, bark, slash, sawdust, or ot
Violation
N
Inspection
Rocky Creek Sediment Removal Project
452559
None
Y
1116479
03/08/2022
Basin Plan Prohibition
The placing or disposal of soil, silt, bark, slash, sawdust, or other organic an
Violation
None
Inspection
Rocky Creek Sediment Removal Project
452559
None
Y
1116478
03/08/2022
Basin Plan Prohibition
The discharge or threatened discharge of soil, silt, bark, slash, sawdust, or ot
Violation
N
Inspection
Rocky Creek Sediment Removal Project
452559
None
Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 9
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
Total Regulatory Measures linked to Related Parties: 1
The current report was generated with data as of: 10/17/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.