Violation ID |
Occurrence Date |
Violation Type |
Violation Description(+) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
1092086 |
07/07/2021 |
Unauthorized Discharge |
Windblown waste outside the active fill Area - Prohibition A.4 of the WDRs, whic |
Violation |
None |
Complaint |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
Y |
1099367 |
09/22/2021 |
Order Conditions |
1. Ten gallons of liquid were removed from the West Pond Leak Detection sump (We |
Violation |
None |
Report |
Recology Blossom Valley Organics North |
402519 |
2015-0121-DWQ |
Y |
1111158 |
05/27/2022 |
Order Conditions |
Violations: 1. At the time of the inspection, the Discharger failed to place and |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1111215 |
09/22/2021 |
Deficient Reporting |
2. The Discharger failed to notify Water Board staff of concentration limit exce |
Violation |
None |
Report |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1114537 |
01/18/2023 |
Order Conditions |
2. Compost leachate overtopping the East and West compost leachate ponds is a vi |
Violation |
None |
Inspection |
Recology Blossom Valley Organics North |
402519 |
2015-0121-DWQ |
Y |
1114712 |
01/18/2023 |
Unauthorized Discharge |
3. Intentionally allowing water to pond at numerous locations within the site?s |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1114713 |
01/18/2023 |
Unauthorized Discharge |
4. Failure to maintained 7 feet of freeboard in the site Class II surface impoun |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1120445 |
06/07/2023 |
Order Conditions |
Elevated leachate levels were observed in multiple LCRS sumps |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120447 |
06/07/2023 |
Order Conditions |
Violation 3 ? Scattered waste was observed in Module 16 outside the limit of the |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120454 |
06/07/2023 |
Order Conditions |
Violation 10 ? Multiple Facility monitoring locations are no longer properly lab |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1126003 |
04/10/2024 |
Order Conditions |
Compost and compost leachate appears to have been pushed or flowed off the Facil |
Violation |
None |
Inspection |
Western Placer Waste Management Authority Materials Recovery Facility |
408196 |
2015-0121-DWQ |
Y |
1126004 |
04/10/2024 |
Order Conditions |
The concrete lined drainage channel that discharges runoff from the Receiving/ P |
Violation |
None |
Inspection |
Western Placer Waste Management Authority Materials Recovery Facility |
408196 |
2015-0121-DWQ |
Y |
1126128 |
02/28/2024 |
Order Conditions |
Violation 2 - During the 28 February 2024 inspection of the Facility, Central Va |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1126131 |
02/28/2024 |
Order Conditions |
Violation 5 - During the 28 February 2024 inspection of the Facility, Central Va |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1128524 |
05/08/2024 |
Order Conditions |
Numerous areas of leachate-stained soil and ponded leachate atop FA1/ Unit 1 and |
Violation |
None |
Inspection |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
Y |
1106260 |
07/19/2022 |
Deficient Reporting |
Outlined in the 19 July 2022 WB staff letter is a summary of each report, along |
Violation |
None |
Report |
Buena Vista Biomass Power, LLC |
377793 |
R5-2011-0009 |
Y |
1111213 |
05/07/2021 |
Unauthorized Discharge |
1. The Discharger failed to Notify Water Board staff of a release of waste or pr |
Violation |
None |
Report |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1111829 |
11/16/2022 |
Order Conditions |
1. A stockpile of finished compost was observed outside the facility?s designate |
Violation |
None |
Inspection |
City of Modesto Co-Compost Project |
408069 |
2015-0121-DWQ |
Y |
1119949 |
06/07/2023 |
Order Conditions |
Violation 3. Central Valley Water Board files do not contain a Final Post-Constr |
Violation |
N |
Inspection |
Western Placer Waste Management Authority Materials Recovery Facility |
408196 |
2015-0121-DWQ |
Y |
1120456 |
06/07/2023 |
Order Conditions |
Violation 12 ? A larger section of damaged liner remains exposed atop Module 11 |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1122914 |
10/04/2023 |
Order Conditions |
Exposed waste was observed outside the active disposal face at multiple location |
Violation |
None |
Inspection |
Fink Road LF |
445693 |
R5-2021-0060 |
Y |
1125998 |
04/10/2024 |
Order Conditions |
The legal requirements outlined below are specific to the violation noted above. |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1126127 |
02/28/2024 |
Order Conditions |
Violation 1 - During the 28 February 2024 inspection of the Facility, Central Va |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1126129 |
02/28/2024 |
Order Conditions |
Violation 3 - During the 28 February 2024 inspection of the Facility, Central Va |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1126130 |
02/28/2024 |
Order Conditions |
Violation 4 - During the 28 February 2024 inspection of the Facility, as well as |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1126132 |
02/28/2024 |
Order Conditions |
Violation 6 - During the 28 February 2024 inspection of the Facility, Central Va |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1128525 |
05/08/2024 |
Order Conditions |
Large and numerous areas of exposed waste without adequate daily cover were obse |
Violation |
None |
Inspection |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
Y |
1131977 |
01/13/2024 |
Order Conditions |
The ALR was exceeded at 2,405.7-gallons per day between 13 January 2023 and 20 J |
Violation |
None |
Report |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1079675 |
06/17/2020 |
Order Conditions |
1. The Discharger has failed to place and/or maintain an adequate layer of daily |
Violation |
N |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
N |
1126407 |
01/03/2024 |
Order Conditions |
Violation 3 - A buildup of hydraulic head on the underlying Primary liner of the |
Violation |
None |
Report |
Rock Creek Solid Waste Facility |
417039 |
R5-2017-0108 |
N |
1126405 |
01/23/2024 |
Order Conditions |
Violation 1 - Unauthorized discharge of contact storm water/leachate to surface |
Violation |
None |
Report |
Rock Creek Solid Waste Facility |
417039 |
R5-2017-0108 |
N |
1099368 |
09/22/2021 |
Order Conditions |
2. No liquid was detected in the East Pond LD and lysimeter during all of 2020 a |
Violation |
None |
Report |
Recology Blossom Valley Organics North |
402519 |
2015-0121-DWQ |
Y |
1104666 |
03/16/2022 |
Order Conditions |
Violations: 1. The Discharger has failed to place and/or maintain an adequate la |
Violation |
None |
Inspection |
Fink Road LF |
445693 |
R5-2021-0060 |
Y |
1114711 |
01/18/2023 |
Unauthorized Discharge |
2. The presence of deteriorated asphalt, in need of patching, sealing, or repavi |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1120449 |
06/07/2023 |
Order Conditions |
The erosion noted in Violation 4 above has caused significant sedimentation to o |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120455 |
06/07/2023 |
Order Conditions |
Violation 11 ? Deep-rooted Milk-Thistle was observed atop the cover (Figures 57) |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1126119 |
02/14/2024 |
Order Conditions |
Violation 2 - In a 14 February 2024 letter, the Discharger submitted a report wi |
Violation |
None |
Report |
Fink Road LF |
445693 |
R5-2021-0060 |
Y |
1099334 |
08/13/2021 |
Unauthorized Discharge |
On 20 July 2021, a Notice of Violation (NOV) was issued to Waste Management for |
Violation |
None |
Inspection |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
N |
1099335 |
08/31/2021 |
Unauthorized Discharge |
On 20 July 2021, a Notice of Violation (NOV) was issued to Waste Management for |
Violation |
None |
Inspection |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
N |
1117946 |
01/19/2023 |
Order Conditions |
The discharge of compost leachate from CWP-2 onto the Curing Pad is a violation |
Violation |
None |
Inspection |
Altamont/Resource Recovery Composting Facility |
409686 |
2015-0121-DWQ |
N |
1085345 |
01/27/2021 |
Deficient Reporting |
4. The Annual Report did not contain any documentation regarding leachate monito |
Violation |
N |
Report |
Sierra Conservation Ctr-LF |
145921 |
96-010 |
N |
1079470 |
06/10/2020 |
Order Conditions |
2. Trash was observed along and outside the eastern and southern limits of the d |
Violation |
N |
Inspection |
City of Modesto Co-Compost Project |
408069 |
2015-0121-DWQ |
N |
1079469 |
06/10/2020 |
Order Conditions |
1. A stockpile of finished compost was observed outside the designated compostin |
Violation |
N |
Inspection |
City of Modesto Co-Compost Project |
408069 |
2015-0121-DWQ |
N |
1088451 |
05/13/2020 |
Order Conditions |
1. Failure to install an approved monitoring network and establish water quality |
Violation |
N |
Inspection |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
Y |
1092087 |
07/07/2021 |
Unauthorized Discharge |
Windblown waste outside the facility boundary - Discharge Specifications B.9 of |
Violation |
N |
Complaint |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
Y |
1094850 |
09/29/2021 |
Order Conditions |
In the noted 30 November 2016 NOV, Water Board staff directed the Discharger to |
Violation |
None |
Report |
Union Pacific Railroad Company - Roseville Rail Yard |
383392 |
R5-2012-0009 |
Y |
1111214 |
07/27/2021 |
Deficient Reporting |
2. The Discharger failed to notify Water Board staff of concentration limit exce |
Violation |
None |
Report |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1119834 |
05/10/2023 |
Order Conditions |
Placement of waste atop the old Class III WMU, where a final cover has not been |
Violation |
None |
Inspection |
Union Mine LF |
418632 |
R5-2018-0048 |
Y |
1120452 |
06/07/2023 |
Order Conditions |
Violation 8 ? Minor soil excavations, which could result in pounding, were obser |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120457 |
06/07/2023 |
Order Conditions |
Violation 13 ? A seep and exposed section of damaged final cover was observed at |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1139172 |
11/20/2024 |
Order Conditions |
Violation 1 ? Compost and compost leachate were observed south off the South Pad |
Violation |
None |
Inspection |
Western Placer Waste Management Authority Materials Recovery Facility |
408196 |
2015-0121-DWQ |
Y |
1126406 |
01/03/2024 |
Order Conditions |
Violation 1 -Unauthorized discharge of waste/leachate into the newly completed P |
Violation |
None |
Report |
Rock Creek Solid Waste Facility |
417039 |
R5-2017-0108 |
N |
1088452 |
05/13/2020 |
Order Conditions |
2. Failure to implement the leachate and underdrain separation project is a viol |
Violation |
N |
Inspection |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
Y |
1092085 |
07/07/2021 |
Unauthorized Discharge |
Windblown waste outside the active fill Area - Prohibition A.4 of the WDRs, whic |
Violation |
N |
Complaint |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
Y |
1094851 |
09/29/2021 |
Order Conditions |
a. Section X.C.1 of the 2003 Standard Provisions states in part: If the detectio |
Violation |
None |
Report |
Union Pacific Railroad Company - Roseville Rail Yard |
383392 |
R5-2012-0009 |
Y |
1114536 |
01/18/2023 |
Order Conditions |
1. The discharge of compost leachate into the unlined North Pond, a storm water |
Violation |
None |
Inspection |
Recology Blossom Valley Organics North |
402519 |
2015-0121-DWQ |
Y |
1114538 |
01/18/2023 |
Order Conditions |
3. The presence of poor drainage, ponding, tire ruts, and statured compost at nu |
Violation |
None |
Inspection |
Recology Blossom Valley Organics North |
402519 |
2015-0121-DWQ |
Y |
1114710 |
01/18/2023 |
Unauthorized Discharge |
1. The presence of storm water runoff from the treated wood storage area in cont |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1114715 |
01/18/2023 |
Unauthorized Discharge |
6. Intentionally allowing water to pond in the CCA/ACZA diversionary structure i |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1119947 |
06/07/2023 |
Order Conditions |
Violation 1. The concrete lined drainage channel that discharges runoff from the |
Violation |
None |
Inspection |
Western Placer Waste Management Authority Materials Recovery Facility |
408196 |
2015-0121-DWQ |
Y |
1120450 |
06/07/2023 |
Order Conditions |
Violation 6 ? Erosional damage has occurred atop the Module 2 cover, beyond the |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1126118 |
02/06/2024 |
Order Conditions |
Violation 1 ? In a 31 January 2024 email, the Discharger asked Central Valley Re |
Violation |
None |
Report |
Fink Road LF |
445693 |
R5-2021-0060 |
Y |
1099336 |
10/07/2021 |
Unauthorized Discharge |
On 20 July 2021, a Notice of Violation (NOV) was issued to Waste Management for |
Violation |
None |
Inspection |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
N |
1093982 |
09/15/2021 |
Late Report |
Failure to submittal an AROWD as required by the 17 January 2019 Notice of Viola |
Violation |
N |
Report |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1114714 |
01/18/2023 |
Unauthorized Discharge |
5. Failure to operate the site?s treatment system at its maximum flow rate allow |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1120451 |
06/07/2023 |
Order Conditions |
Violation 7 ? Areas of notable sedimentation and ponding were observed along the |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1120453 |
06/07/2023 |
Order Conditions |
Violation 9 ? Recently re-graded sections of the outer southern slope of Module |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1136036 |
11/18/2024 |
Order Conditions |
Discharge of waste outside the Facility?s Class III landfills to the unsaturated |
Violation |
None |
Report |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1088428 |
02/10/2021 |
Order Conditions |
Observed Violation: 1. The Discharger has failed to place an adequate layer of |
Violation |
N |
Inspection |
Rock Creek Solid Waste Facility |
417039 |
R5-2017-0108 |
Y |
1088439 |
02/10/2021 |
Order Conditions |
1. A large slide remains unrepaired along the northwestern toe of Unit B. This s |
Violation |
N |
Inspection |
Red Hill Class III Landfill & Class II Surface Impoundments |
312329 |
R5-2006-0045 |
Y |
1094852 |
09/29/2021 |
Order Conditions |
Section X.C.4 of the 2003 Standard Provisions states in part: ? the Discharger m |
Violation |
None |
Report |
Union Pacific Railroad Company - Roseville Rail Yard |
383392 |
R5-2012-0009 |
Y |
1100124 |
01/28/2022 |
Failure to Notify |
Failure to submit the required reports |
Violation |
N |
Report |
Buena Vista Biomass Power, LLC |
377793 |
R5-2011-0009 |
Y |
1107737 |
06/28/2022 |
Unauthorized Discharge |
Violations The occurrence of windblown waste within the Facility, outside the |
Violation |
None |
Inspection |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
Y |
1119948 |
06/07/2023 |
Order Conditions |
Violation 2. Central Valley Water Board files do not contain any documentation t |
Violation |
None |
Inspection |
Western Placer Waste Management Authority Materials Recovery Facility |
408196 |
2015-0121-DWQ |
Y |
1120446 |
06/07/2023 |
Order Conditions |
EViolation 2 ? The Discharger stated that they, at the request of the Placer Cou |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1124321 |
11/02/2023 |
Order Conditions |
Construction of Module 6 of the Class II Waste Management Unit (WMU) has begun w |
Violation |
None |
Report |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1124334 |
01/17/2024 |
Order Conditions |
Board staff observed an intentional unauthorized discharge of compost leachate b |
Violation |
None |
Inspection |
City of Modesto Co-Compost Project |
408069 |
2015-0121-DWQ |
Y |
1131978 |
08/02/2024 |
Order Conditions |
No Financial Assurance updates, as required by Section E of the WDRs, have been |
Violation |
None |
Report |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1139173 |
11/20/2024 |
Order Conditions |
Violation 1 ? Blockage and damage to the curbed drainage channel along the south |
Violation |
None |
Inspection |
Western Placer Waste Management Authority Materials Recovery Facility |
408196 |
2015-0121-DWQ |
Y |
1100998 |
02/09/2022 |
Order Conditions |
The continued presence of both new and old windblown waste from the Altamont Lan |
Violation |
None |
Inspection |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
N |
1085343 |
01/27/2021 |
Deficient Reporting |
2. The Annual Report did not contain any Standard Observation. Section C, Standa |
Violation |
N |
Report |
Sierra Conservation Ctr-LF |
145921 |
96-010 |
N |
1085342 |
01/27/2021 |
Deficient Reporting |
1. The Annual Report did not contain a transmittal letter as required by the WDR |
Violation |
N |
Report |
Sierra Conservation Ctr-LF |
145921 |
96-010 |
N |
1099337 |
10/19/2021 |
Unauthorized Discharge |
On 20 July 2021, a Notice of Violation (NOV) was issued to Waste Management for |
Violation |
None |
Inspection |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
N |
1140020 |
01/30/2025 |
Order Conditions |
Sumps 1, 6, and 9 no longer discharge to onsite storage tanks or to the Class II |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
N |
1088440 |
02/10/2021 |
Order Conditions |
2. Leachate impacted soil remains beneath the two repaired SI-A leachate lines. |
Violation |
N |
Inspection |
Red Hill Class III Landfill & Class II Surface Impoundments |
312329 |
R5-2006-0045 |
Y |
1088442 |
02/10/2021 |
Order Conditions |
3. Failure to repair the deep tire rut that was first observed by Water Board st |
Violation |
N |
Inspection |
Red Hill Class III Landfill & Class II Surface Impoundments |
312329 |
R5-2006-0045 |
Y |
1094849 |
11/02/2020 |
Order Conditions |
Discharge Specification B.9 of the WDRs states in part: Prior to the wet season |
Violation |
None |
Report |
Union Pacific Railroad Company - Roseville Rail Yard |
383392 |
R5-2012-0009 |
Y |
1099369 |
09/22/2021 |
Order Conditions |
3. No surface water sampling results are provided from location SW-1 or SW-2. Th |
Violation |
None |
Report |
Recology Blossom Valley Organics North |
402519 |
2015-0121-DWQ |
Y |
1120448 |
06/07/2023 |
Order Conditions |
Significant and widespread erosion has occurred across the soil stockpiles place |
Violation |
None |
Inspection |
Western Regional Sanitary LF |
329292 |
R5-2007-0047 |
Y |
1122917 |
11/20/2023 |
Order Conditions |
Unauthorized discharge of waste/leachate into the under-construction Phase III A |
Violation |
None |
Report |
Rock Creek Solid Waste Facility |
417039 |
R5-2017-0108 |
Y |
1124335 |
01/17/2024 |
Order Conditions |
the southern portion of the active compost pad and most of the 10-acre final pro |
Violation |
None |
Inspection |
City of Modesto Co-Compost Project |
408069 |
2015-0121-DWQ |
Y |
1130369 |
07/16/2024 |
Order Conditions |
Standard Provisions and Reporting Requirements, December 2015, Section D.1 state |
Violation |
None |
Report |
Altamont/Resource Recovery Class II & III Landfills,Class II Surface Impoundment |
407660 |
R5-2016-0042 |
Y |
1131979 |
08/02/2024 |
Order Conditions |
5. The Discharger failed to complete GeoTracker uploads as outlined below: a. Fo |
Violation |
None |
Report |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
Y |
1085344 |
01/27/2021 |
Deficient Reporting |
3. The Annual Report did not contain a discussion regarding the site¿s run-off/r |
Violation |
N |
Report |
Sierra Conservation Ctr-LF |
145921 |
96-010 |
N |
1140019 |
01/30/2025 |
Order Conditions |
Violation 1. The concrete curb of the expanded CCA/ACZA diversionary structure h |
Violation |
None |
Inspection |
Thunderbolt Wood Treating Class II Surface Impoundment |
377017 |
R5-2010-0125 |
N |
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
|