| Violation ID |
Occurrence Date |
Violation Type |
Violation Description(-) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
| 1153669 |
03/17/2026 |
CAT2 |
Chlorine, Total Residual Instantaneous Maximum limit is 5.28 mg/L and reported value was 5.5 mg/L at EFF-001. |
Violation |
N |
eSMR |
USMC Camp Pendleton Southern Regional Tertiary Treatment Plant |
422969 |
R9-2019-0167 |
N |
| 1153668 |
03/17/2026 |
CAT2 |
Chlorine, Total Residual Instantaneous Maximum limit is 159 lb/day and reported value was 192.1 lb/day at EFF-001. |
Violation |
N |
eSMR |
USMC Camp Pendleton Southern Regional Tertiary Treatment Plant |
422969 |
R9-2019-0167 |
N |
| 1152940 |
02/17/2026 |
Surface Water |
Enterococcus result was 2000 MPN/100mL. This was one of 4 results >110 MPN/100mL resulting in more than 10% of monthly samples in exceedance. The exceedance was likely due to the sample being taken within 72 hours after precipitation was greater than 0.10 inch. |
Violation |
N |
eSMR |
USMC Camp Pendleton Southern Regional Tertiary Treatment Plant |
422969 |
R9-2019-0167 |
N |
| 1152939 |
02/17/2026 |
Surface Water |
Enterococcus result was 121 MPN/100mL. This was one of 4 results >110 MPN/100mL resulting in more than 10% of monthly samples in exceedance. The exceedance was likely due to the sample being taken within 72 hours after precipitation was greater than 0.10 inch. |
Violation |
N |
eSMR |
USMC Camp Pendleton Southern Regional Tertiary Treatment Plant |
422969 |
R9-2019-0167 |
N |
| 1152938 |
02/17/2026 |
Surface Water |
Enterococcus result was 594 MPN/100mL. This was one of 4 results >110 MPN/100mL resulting in more than 10% of monthly samples in exceedance. The exceedance was likely due to the sample being taken within 72 hours after precipitation was greater than 0.10 inch. |
Violation |
N |
eSMR |
USMC Camp Pendleton Southern Regional Tertiary Treatment Plant |
422969 |
R9-2019-0167 |
N |
| 1152937 |
02/17/2026 |
Surface Water |
Fecal coliform result was 540 MPN/100mL. The exceedance was likely due to the sample being taken within 72 hours after precipitation was greater than 0.10 inch. |
Violation |
N |
eSMR |
USMC Camp Pendleton Southern Regional Tertiary Treatment Plant |
422969 |
R9-2019-0167 |
N |
| 1152936 |
02/17/2026 |
Surface Water |
Fecal coliform result was 1100 MPN/100 mL. The exceedance was likely due to the sample being taken within 72 hours after precipitation was greater than 0.10 inch. |
Violation |
N |
eSMR |
USMC Camp Pendleton Southern Regional Tertiary Treatment Plant |
422969 |
R9-2019-0167 |
N |
| 1152935 |
02/17/2026 |
Surface Water |
Fecal coliform result was 540 MPN/100mL. The exceedance was likely due to the sample being taken within 72 hours after precipitation was greater than 0.10 inch. |
Violation |
N |
eSMR |
USMC Camp Pendleton Southern Regional Tertiary Treatment Plant |
422969 |
R9-2019-0167 |
N |
| 1152934 |
02/17/2026 |
Surface Water |
Enterococcus result was 295 MPN/100mL. This was one of 4 results >110 MPN/100mL resulting in more than 10% of monthly samples in exceedance. The exceedance was likely due to the sample being taken within 72 hours after precipitation was greater than 0.10 inch. |
Violation |
N |
eSMR |
USMC Camp Pendleton Southern Regional Tertiary Treatment Plant |
422969 |
R9-2019-0167 |
N |
| 1151149 |
01/28/2026 |
Sanitary Sewer Overflow/Spill/ |
Type: Category 1 Spill; Debris-General,Fats, Oil and Grease (FOG) caused 15000 gallons of sewage to spill from Manhole at Manhole 02Y111 15 Area Housing to Unpaved Surface,Surface Water |
Violation |
None |
SSO |
USMC Base, Camp Pendleton CS |
300837 |
2022-0103-DWQ |
N |
| 1150880 |
01/28/2026 |
Deficient Reporting |
Inadequate Sewer System Management Plan (SSMP); failure to include all elements of Attachment D to the SSS WDRs that describe required SSMP elements. |
Violation |
N |
Report |
USMC Base, Camp Pendleton CS |
300837 |
2022-0103-DWQ |
Y |
| 1150500 |
01/06/2026 |
Sanitary Sewer Overflow/Spill/ |
Type: Category 1 Spill; Pipe Structural Problem/Failure - Installation caused 22950 gallons of sewage to spill from Force Main at 41300 Force Main on N. Stuart Mesa to Drainage Conveyance System that discharges to surface water |
Violation |
None |
SSO |
USMC Base, Camp Pendleton CS |
300837 |
2022-0103-DWQ |
N |
| 1150449 |
10/30/2025 |
Sanitary Sewer Overflow/Spill/ |
Type: Category 1 Spill; Pipe Structural Problem/Failure - Installation caused 21131 gallons of sewage to spill from Force Main at 170831 Force Main to Surface Water,Unpaved Surface |
Violation |
None |
SSO |
USMC Base, Camp Pendleton CS |
300837 |
2022-0103-DWQ |
N |
| 1150142 |
11/17/2025 |
OEV |
Fecal Coliform Single Sample Maximum limit is 400 MPN/100 mL and reported value was 690 MPN/100 mL at S3. |
Violation |
N |
eSMR |
USMC Camp Pendleton Southern Regional Tertiary Treatment Plant |
422969 |
R9-2019-0167 |
N |
| 1148860 |
09/21/2025 |
CAT1 |
Total Suspended Solids (TSS) Weekly Average (Mean) limit is 45 mg/L and reported value was 50 mg/L at EFF-001. |
Violation |
N |
eSMR |
USMC Camp Pendleton Southern Regional Tertiary Treatment Plant |
422969 |
R9-2019-0167 |
N |
| 1147784 |
08/05/2025 |
Order Conditions |
A spill was reported on 8/5/2025 at approximately 13:20 at the AWT Brine Line ARV ROC #16. The spill occurred when a vehicle struck and sheared off the ARV pipe connection, causing the brine to percolate into ground on the dirt shoulder of Vandergrift Blvd. West. The spill was contained by responders at 14:20 and a temporary valve was installed. The estimated spill volume of 300 gallons was calculated using the volume by area estimation method. The spill did not reach or affect any drinking water systems or surface waters and did not result in any closures. |
Violation |
N |
eSMR |
Advanced Water Treatment Plant at Haybarn Canyon |
422969 |
R9-2019-0167 |
N |
|
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
|