S889084 |
05/30/2024 |
SW - Deficient BMP Implementation |
Sweep sediment from all paved roadways within the construction project to the Shady View Dr and Mystic Canyon Dr intersection, reinstall stabilized construction entrances per site plan specifications to prevent the discharge of sediment offsite, above grade temporary concrete washout containers must utilize a liner and be emptied as to not exceed 75% capacity, slopes located at the northeastern portion of the property must install linear sediment control BMPs or utilize temporary stabilization measures, perimeter sediment controls must be installed at the northeastern corner of the project near the storm drain point of connection, damaged silt fencing located at the northwestern portion of the project must be corrected/replaced, silt fencing must be properly trenched into the ground or other BMPs utilized behind lot 115, and all trash in the area cleaned, perform and upload sampling results for the next qualifying precipitation event, and submit a Change of Information via SMARTS to update the construction commencement and completion dates, as well as upload a revised SWPPP and site maps to reflect the Parcel 2 entrance adjustments, v-ditch installations, retaining wall outlet pipes and associated rip rap, northwest construction entrance, proposed northwest modular wetland systems, western vehicle storage area, and southern staging/storage area. |
Violation |
N |
Inspection |
TR 20317 Shady View |
S546672 |
2009-0009-DWQ |
Y |