Failure to implement required BMPs, failure to improve BMPs after NAL exceedance, discharge to waters of the state, discharge in exceedance of NAL to waters of the US
Violation
N
Inspection
43640 Dr Fine Bridge Replacement
S586453
2009-009-DWQ
Y
S903816
11/05/2025
SW - Deficient BMP Implementation
1. Failure to implement required minimum BMPs, 2. Failure to implement Additional Risk Level 2 and 3 requirements, including failure to install linear sediment control BMPs at the toe of slopes, 3. Failure to improve BMPs after an NAL exceedance, 4. Failure to amend the SWPPP to reflect current conditions, 5. Failure to perform required monitoring and/or sampling, 6. Unpermitted discharges and/or threatened discharges of earthen material or other construction related pollutants into waters of the state and waters of the United States.
Violation
N
Inspection
43640 Dr Fine Bridge Replacement
S586453
2009-009-DWQ
Y
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 2
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
Total Regulatory Measures linked to Related Parties: 0
The current report was generated with data as of: 05/20/2026