Failure to implement construction entrance BMPs, maintenance of storm water conveyance system, properly manage waste, failure to protect construction materials, failure to implement erosion controls, and failure to provide correct information in SWPPP.
Violation
N
Inspection
Pure Water Program Morena Conveyance South & Middle
S555446
2009-0009-DWQ
Y
S890668
11/17/2024
SW - Effluent
Citizen complaint documented unauthorized trench dewatering discharge to the City of San Diego's MS4.
Violation
N
Inspection
Pure Water Program Morena Conveyance South & Middle
S555446
2009-0009-DWQ
Y
S890667
11/18/2024
SW - Incomplete/Insufficient SWPPP
CGP Attachment A. section K. Failure to provide necessary and correct information.
Violation
N
Inspection
Pure Water Program Morena Conveyance South & Middle
S555446
2009-0009-DWQ
Y
S890666
11/18/2024
SW - Deficient BMP Implementation
1. CGP Attachment A, section J.1.ii. Failure to implement Best Management Practices (BMPs) to minimize or prevent pollutants in storm water discharges. 2. CGP Attachment A, section J.2.a.iv. Failure to minimize exposure of construction materials to precipitation. 3. CGP Attachment A, section J.2.a.v. Failure to implement BMPs to control off-site tracking of loose construction and landscape materials. 4. CGP Attachment A, section J.2.b.v. Failure to prevent discharges from waste disposal containers to the storm water drainage system or receiving water. 5. CGP Attachment A, section J.2.c.i. and ii. Failure to implement BMPs to prevent vehicle oil, grease, or fuel from leaking into the ground, storm drains or surface waters. 6. CGP Attachment A, section J.4.b. Failure to provide effective soil cover. 7. CGP Attachment A. section J.5.a. Failure to implement perimeter control BMPs. 8. CGP Attachment A. section J.5.c. Failure to implement linear sediment control BMPs.
Violation
N
Inspection
Pure Water Program Morena Conveyance South & Middle
S555446
2009-0009-DWQ
Y
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 4
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
Total Regulatory Measures linked to Related Parties: 0
The current report was generated with data as of: 05/23/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.