- Need attention and maintenance around the entire site, including stockpiles. - Additionally, no perimeter controls were installed along the fence line adjacent to the Los Angeles River.
Violation
N
Inspection
Reseda HS Comprehensive Modernization
S536233
2009-0009-DWQ
Y
S889594
10/11/2023
SW - Deficient BMP Implementation
Entrances/exits with deficient stabilization and sediment controls in place. Tracked out sediment was observed on sidewalks and streets. Perimeter controls were inadequate throughout the perimeter of the site. Trash debris was observed along the perimeter of the site (Photographs 20-26) Storm drains/catch basins with sediment and torn fabric filter/plastic liner without BMPs or have deficient BMPs in place. Large metal trash bins without covers. Soil stockpiles with deficient cover and no sediment control BMPs in place.
Violation
N
Inspection
Roosevelt HS Comprehensive Modernization
S495795
2009-0009-DWQ
Y
S888419
02/01/2024
SW - Deficient BMP Implementation
1. The discharger failed to minimize or prevent pollutants in stormwater discharges through the use of controls, structures, and management practices that achieve BAT for toxic and non-conventional pollutants and BCT for conventional pollutants. 2. The discharger failed to cover and berm loose stockpiled construction materials that were not actively being used (i.e., soil, spoils, aggregate, fly-ash, stucco, hydrated lime, etc.). 3. The discharger failed to ensure the effectiveness of existing BMPs to reduce or prevent pollutants in stormwater discharges. 4. The discharger failed to provide effective soil cover for inactive areas and all finished slopes 5. The discharger failed to establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site. 6. The discharger failed to effectively manage all run-on, all runoff within the site, and all runoff that discharges off the site. Run-on from off-site shall be directed away from all disturbed areas or shall collectively be in compliance with the effluent limitations in this General Permit.
Violation
N
Inspection
San Pedro HS Comprehensive Modernization
S525978
2009-0009-DWQ
Y
S888418
02/01/2024
SW - Incomplete/Insufficient SWPPP
1. The discharger failed to upload a copy of the Post-Construction BMP Plan into SMARTS. 2. The discharger failed to update the contractors? list in the SWPPP. 3. Failed to provide training information in the Annual Reports
Violation
N
Inspection
San Pedro HS Comprehensive Modernization
S525978
2009-0009-DWQ
Y
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 4
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
Total Regulatory Measures linked to Related Parties: 0
The current report was generated with data as of: 05/16/2025