Violation ID |
Occurrence Date |
Violation Type |
Violation Description(-) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
1126541 |
01/30/2024 |
OEV |
pH Daily Maximum limit is 9 SU and reported value was 9.1 SU at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1126540 |
03/25/2024 |
OEV |
pH Daily Maximum limit is 9 SU and reported value was 9.2 SU at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1123529 |
10/06/2023 |
CAT1 |
Total Suspended Solids (TSS) Monthly Average (Mean) limit is 30.0 mg/L and reported value was 41.8 mg/L at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1122497 |
09/08/2023 |
Deficient Reporting |
Ammonia and chromium analyzed outside holding time |
Violation |
N |
Report |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1121456 |
09/01/2023 |
Deficient Monitoring |
Due to limited operation during September, the facility was unable to collect monthly DDT samples from EFF-002. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1121455 |
07/17/2023 |
CAT1 |
Total Suspended Solids (TSS) 30-Day Average limit is 30 mg/L and reported value was 32.5 mg/L at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1117717 |
10/31/2022 |
CAT2 |
Copper, Total Recoverable Monthly Average limit is 2.1 ug/L and reported value was 4.3 ug/L at EFF-002. |
Violation |
N |
Report |
Redondo Generating Station |
398295 |
R4-2016-0222 |
Y |
1117703 |
03/31/2023 |
Deficient Monitoring |
Discharger did not monitor or report for polychlorinated biphenyls [PCBs], sum of Aroclors at 001 and did not self-report the violation. Reported NODI E in their DMR and I confirmed the missing sample in CIWQS. |
Violation |
N |
Report |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1116039 |
01/31/2023 |
CAT1 |
Oil and Grease 30-Day Average limit is 15 mg/L and reported value was 16.15 mg/L at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
Y |
1112924 |
11/01/2022 |
Deficient Monitoring |
DDT Monthly NPDES samples normally performed by an outside vendor were not collected. Facility environmental coordinator suddenly resigned so sampling was not scheduled. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1112923 |
11/01/2022 |
Deficient Monitoring |
DDT Monthly NPDES samples normally performed by an outside vendor were not collected. Facility environmental coordinator suddenly resigned so sampling was not scheduled. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1112922 |
11/01/2022 |
OEV |
pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.3 SU at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
Y |
1112921 |
11/01/2022 |
Deficient Monitoring |
TSS and O&G Monthly NPDES samples normally performed by an outside vendor were not collected. Facility environmental coordinator suddenly resigned so sampling was not scheduled. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1112920 |
12/30/2022 |
Deficient Monitoring |
DDT Monthly NPDES samples normally performed by an outside vendor were not collected. Facility environmental coordinator suddenly resigned so sampling was not scheduled. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1106810 |
06/06/2022 |
Deficient Monitoring |
2Q22 report missing arsenic from INT-001A monitoring of ocean plan pollutants |
Violation |
N |
Report |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1106809 |
06/30/2022 |
Deficient Monitoring |
2Q22 report missing copper, mercury, nickel, silver, thallium, zinc, and PCBs from EFF 002, required quarterly |
Violation |
N |
Report |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1106729 |
06/04/2022 |
OEV |
Temperature Instantaneous Maximum limit is 86.0 Degrees F and reported value was 91.26 Degrees F at EFF-002. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
Y |
1106728 |
06/05/2022 |
OEV |
Temperature Instantaneous Maximum limit is 86.0 Degrees F and reported value was 87.14 Degrees F at EFF-002. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
Y |
1103762 |
01/31/2022 |
CAT1 |
Total Suspended Solids (TSS) Monthly Average (Mean) limit is 30 mg/L and reported value was 32.5 mg/L at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
Y |
1103761 |
03/31/2022 |
CAT1 |
Total Suspended Solids (TSS) Monthly Average (Mean) limit is 30 mg/L and reported value was 35.84 mg/L at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
Y |
1100023 |
10/31/2021 |
CAT1 |
Total Suspended Solids (TSS) 30-Day Average limit is 30.0 mg/L and reported value was 44.93 mg/L at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
Y |
1100022 |
11/30/2021 |
CAT1 |
Total Suspended Solids (TSS) 30-Day Average limit is 30.0 mg/L and reported value was 34.03 mg/L at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
Y |
1100021 |
12/31/2021 |
CAT1 |
Total Suspended Solids (TSS) 30-Day Average limit is 30.0 mg/L and reported value was 42.53 mg/L at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
Y |
1092486 |
04/30/2021 |
CAT1 |
Total Suspended Solids (TSS) 30-Day Average limit is 30 mg/L and reported value was 42.69 mg/L at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
Y |
1085172 |
10/01/2020 |
Deficient Monitoring |
Because of limited operation in the fourth quarter, chronic toxicity samples for EFF-002 were not collected. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1080792 |
09/01/2020 |
Deficient Monitoring |
The pH readings measured on August 30 and September 1 and 7 were not collected using the standard ELAP certified pH probe; the probe had malfunctioned, and a new probe had to be ordered. These pH readings were conducted using a pH meter that is generally used to support the boiler chemistry analysis within the laboratory and requires a different calibration method. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
N |
1077610 |
06/03/2020 |
OEV |
pH Monthly Discharge limit is 9.0 SU and reported value was 9.09 SU at INT-001A. |
Violation |
N |
eSMR |
Redondo Generating Station |
398295 |
R4-2016-0222 |
Y |
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
|