|
General Information |
|
Party ID |
Party Name |
Party Classification |
Mailing Address |
Work Phone |
Email/Website |
630253 |
Erin Schmitt |
|
2375 Northside Drive Ste 100 San Diego, CA 92108 |
619-521-5898 |
erin.schmitt@waterboards.ca.gov |
|
|
|
|
|
|
Related Places
|
|
Total Related Places: 0
|
|
|
|
|
|
|
Related Parties
|
|
Total Related Parties: 1
|
|
|
|
|
|
|
Regulatory Measures (non-enforcement)
|
|
Total Regulatory Measures: 0
|
|
|
|
|
|
|
Violations within the past year
|
Violation ID |
Occurrence Date |
Violation Type |
Violation Description(-) |
Violation Status |
Priority |
Source |
Facility Name |
Violated Reg. Meas. ID |
Violated Reg. Meas. Order No. |
Linked to Enf. |
1119643 |
08/20/2023 |
Unauthorized Discharge |
Unpermitted Discharge of a Pollutant to Waters of the U.S. in violation of the Federal Water Pollution Control Act, as amended (Clean Water Act), Porter-Cologne Water Quality Control Act, as amended, Water Quality Control Plan for the San Diego Basin, and Order No. R9-2010-0004. |
Violation |
None |
Report |
Las Pulgas Sanitary Landfill |
374495 |
R9-2010-0004 |
Y |
1119642 |
08/20/2023 |
Unauthorized Discharge |
Failure to comply with Order No. R9-2010-0004. 1. Landfill Operation Specifications D.7.e: Erosion Control. The Landfill cover must be maintained to minimize the percolation of liquids through waste. 2. Landfill Construction Specifications E.4.e: Slope Stability. The Discharger must design, construct, and maintain all containment structures so they are capable of containing waste, waste constituents, and degradation products of wastes to prevent water quality impacts from the discharges of waste at the Landfill. 3. Landfill Construction Specifications E.10.a: Landfill Cover. The Discharger must ensure that the intermediate cover is designed and constructed to minimize the percolation of liquids through waste. 4. Provisions G.5: proper Operation and Maintenance. The Discharger must properly operate and maintain all facilities and systems of treatment and control installed or used to achieve compliance with this Order. 5. Reporting Requirements H.11: Endangerment of Health and Environment. The Discharger must report any noncompliance that endangers human health or the environment. This information must be provided orally to the San Diego Water Board within 24-hours from the time the owner becomes aware of the circumstances. A written submission must also be provided within five days of the time the owner becomes aware of the circumstances. 6. Reporting Requirements H.12: Notification of Slope Failure. The Discharger must immediately notify the San Diego Water Board when a determination is made that a slope failure is occurring or has occurred at the Landfill. The Discharger must promptly repair any slope failure that affects or threatens the integrity or the performance of waste containment systems. |
Violation |
N |
Report |
Las Pulgas Sanitary Landfill |
374495 |
R9-2010-0004 |
Y |
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
|
|
Total Violations: 2
|
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
|
|
|
|
|
|
|
Enforcement Actions
|
|
Total Enforcement Actions: 0
|
|
|
|
|
|
|
Regulatory Measures linked to Related Parties
|
|
Total Regulatory Measures linked to Related Parties: 1
|
|
|