1115051 |
02/01/2023 |
CAT2 |
Chlorine, Total Residual 1-Hour Average (Mean) limit is 0.018 mg/L and reported value was 0.28 mg/L at EFF-001. |
Violation |
N |
eSMR |
EchoWater Resource Recovery Facility |
443209 |
R5-2021-0019-02 |
Y |
1114028 |
01/07/2023 |
CAT1 |
Settleable Solids Weekly Average limit is 0.2 ml/L and reported value was 0.5 ml/L at EFF-001. |
Violation |
N |
eSMR |
EchoWater Resource Recovery Facility |
443209 |
R5-2021-0019-02 |
Y |
1114027 |
01/31/2023 |
CAT2 |
Copper, Total Monthly Average limit is 7.4 ug/L and reported value was 8.3 ug/L at EFF-001. |
Violation |
N |
eSMR |
EchoWater Resource Recovery Facility |
443209 |
R5-2021-0019-02 |
Y |
1112739 |
12/02/2022 |
Deficient Monitoring |
Loss of continuous effluent monitoring for CL2, SO3, DO, pH for 1 minute and 20 seconds due to operator error. Operator was working on redundant sample pump and accidently opened a bypass valve that caused a loss of flow from the in service pump. |
Violation |
N |
eSMR |
EchoWater Resource Recovery Facility |
443209 |
R5-2021-0019-02 |
Y |
1111086 |
05/31/2022 |
Deficient Monitoring |
Effluent total residual chlorine, sulfur dioxide, sodium bisulfite, temperature, pH, DO, influent pH and emergency storage freeboard was not recorded due to a data server capacity issue for 2.75 hours on 3 May 2022 and for 5 hours on 4 May 2022. The issue has been resolved. |
Violation |
N |
Report |
EchoWater Resource Recovery Facility |
443209 |
R5-2021-0019-02 |
Y |
1110656 |
10/06/2022 |
CAT2 |
Chlorine, Total Residual 1-Hour Average (Mean) limit is 0.018 mg/L and reported value was 0.086 mg/L at EFF-001. |
Violation |
N |
eSMR |
EchoWater Resource Recovery Facility |
443209 |
R5-2021-0019-02 |
Y |
1110655 |
10/21/2021 |
Deficient Monitoring |
Lost sample pumps that feed EFF-001 continuous analyzers for pH, Dissolved Oxygen, Total Residual Chlorine, and Sulfur Dioxide for approximately 9 minutes. Error occurred during an unplanned SMUD power outage. Error occurred when redundant sample pumps/analyzers were offline for routine preventative maintenance. See cover letter for additional details. |
Violation |
N |
eSMR |
EchoWater Resource Recovery Facility |
443209 |
R5-2021-0019-02 |
Y |
1102622 |
02/28/2022 |
CAT2 |
Chlorine, Total Residual 1-Hour Average (Mean) limit is 0.019 mg/L and reported value was 0.255 mg/L at EFF-001. |
Violation |
N |
eSMR |
EchoWater Resource Recovery Facility |
443209 |
R5-2021-0019-02 |
Y |
1095886 |
09/30/2021 |
CAT2 |
Dichlorobromomethane Monthly Average (Mean) limit is 31 ug/L and reported value was 32 ug/L at EFF-001. |
Violation |
N |
eSMR |
EchoWater Resource Recovery Facility |
443209 |
R5-2021-0019-02 |
Y |
1092573 |
12/13/2020 |
Order Conditions |
On 13 December 2020, approximately 400,000 gallons of Chlorinated Secondary Effluent (CSE) spilled at the Facility due to a failure of a restrained coupler in an underground high pressure reclaimed water pipe. The majority of the spill discharged to pavement and drained back to the treatment plant¿s headworks; however, a portion of the spill discharged to dry land and was not recovered. No surface water was impacted by the spill. The failed section of pipe was replaced with a restrained sleeve coupling in accordance with current design standards and recurrence of the spill is unlikely. The 13 December 2020 spill is a violation of WDRs Discharge Prohibition III.A, which prohibits discharge of wastewater in a manner different from what the WDRs describe. |
Violation |
N |
Report |
EchoWater Resource Recovery Facility |
405960 |
R5-2016-0020-01 |
Y |
1091465 |
05/02/2021 |
Deficient Monitoring |
On May 2, 2021 laboratory staff collected a CFE sample while SRWTP was in diversion. This sample was taken while SRWTP was not discharging to the Sacramento River, therefore the sample was not representative of the discharge for that day. |
Violation |
N |
eSMR |
EchoWater Resource Recovery Facility |
405960 |
R5-2016-0020-01 |
Y |
1089522 |
03/26/2021 |
CAT2 |
Chlorine, Total Residual 1-Hour Average (Mean) limit is 0.019 mg/L and reported value was 0.023 mg/L at EFF-001. |
Violation |
N |
eSMR |
EchoWater Resource Recovery Facility |
405960 |
R5-2016-0020-01 |
Y |
1085508 |
10/29/2020 |
Order Conditions |
On 29 October 2020, approximately 4.5 million gallons of CSE spilled at the Facility for a duration of approximately 40 minutes due to a closed motorized gate blocking flow while diverting flow to Emergency Storage Basin A . The spill discharged to dry land and storm water and plant drainage structures that return flow to the headworks for retreatment. The spill was contained within the Facility and no surface water was impacted. The 29 October 2020 spill is a violation of WDRs Discharge Prohibition III.A, which prohibits discharge of wastewater in a manner different from what the WDRs describe. |
Violation |
N |
Report |
EchoWater Resource Recovery Facility |
405960 |
R5-2016-0020-01 |
Y |
1085507 |
11/01/2020 |
Deficient Monitoring |
On October 20, 2020 SRWTP had a power failure at the outfall facility where continuous effluent monitoring is performed prior to effluent discharge to the Sacramento River. This resulted in effluent discharge that was not monitored for pH, dissolved oxygen, total residual chlorine, and sulfur dioxide (or sodium bisulfite) for a period of approximately nine minutes. A second power failure occurred on 27 October 2020 which resulted in a loss of effluent continuous monitoring for pH, dissolved oxygen, total residual chlorine, and sulfur dioxide (or sodium bisulfite), temperature and flow rate for a period of nine minutes and 32 seconds. No loss of treatment occurred during either of these power failures. |
Violation |
N |
Report |
EchoWater Resource Recovery Facility |
405960 |
R5-2016-0020-01 |
Y |
1083509 |
11/16/2020 |
Order Conditions |
On 16 November 2020, approximately 4,280 gallons of Chlorinated Secondary Effluent (CSE) spilled at the Facility because a contractor struck a hydrant with a vehicle in an active contruction zone. The spill occured for a duration of 5 minutes dispersed to dry land and sanitary drains nearby and no CSE discharged to surface water during the event. Sanitary drains return flow to SRWTP for retreatment. No surface water was impacted by this spill and no one was injured as a result of this spill. |
Violation |
N |
eSMR |
EchoWater Resource Recovery Facility |
405960 |
R5-2016-0020-01 |
Y |
Report currently showing last five years of violations. Click here to return to viewing one year of violations. Refer to the Interactive Violation Report for more data.
|