Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Party At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
  
  
  
  
General Information
Party ID Party Name Party Classification Mailing Address Work Phone Email/Website
139190 Trinh Pham 1001 I Street Sacramento, CA 95814 916-341-5871 trinh.pham@waterboards.ca.gov
  
  
  
  
Expand/Contract Related Places
Related Places
Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date
Total Related Places: 0
  
  
  
  
Expand/Contract Related Parties
Related Parties
Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification
137769 State Water Resources Control Board Organization Employee 11/17/2010 None Waterboard
137762 Central Valley Regional Water Quality Control Board, Sacramento Office Organization Employee 06/17/2005 01/01/2010 Waterboard
Total Related Parties: 2
  
  
  
  
Expand/Contract Regulatory Measures
Regulatory Measures (non-enforcement)
Reg. Measure ID Regulatory Measure Type Region WDID Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Amended?
Total Regulatory Measures: 0
  
  
  
  
Expand/Contract Violations
Violations within the past year
Violation ID Occurrence Date Violation Type Violation Description(-) Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked to Enf.
1138528 10/29/2024 Unauthorized Discharge On October 28, 2024, a PG&E gas crew was in the process of assessing and repairing a natural gas line suspected of leaking at the PG&E Cupertino Service Center when a 3-in potable water line was accidentally struck and began to slowly leak. A plumbing contractor was then scheduled to repair the leak the following day. To access the leaking pipe for repairs, the excavation had to be dewatered. While water was discharged as an Unplanned discharge under the provisions of the General Order, required BMPs to filter the water prior to discharge were not implemented. The contractor performing the repair was not aware of PG&E's dewatering requirements and discharged the water without notifying PG&E Environmental staff or applying a filter sock prior to discharge. Water was pumped directly from the excavation and onto the ground where it flowed approximately 700 feet north along the facility's stormwater drainage swales and into the storm drains. Violation N Report Pacific Gas & Electric Company - Natural Gas Utilities 418337 2017-0029-DWQ N
Report defaults to display violations within the last year. Click here to see last five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 1
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
  
  
  
  
Expand/Contract Enforcement Actions
Enforcement Actions
Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status
Total Enforcement Actions: 0
  
  
  
  
Expand/Contract Enforcement Actions
Regulatory Measures linked to Related Parties
Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status
374958 State Water Resources Control Board Enrollee - WDR SSOMUNISML 02/02/2007 Active
Total Regulatory Measures linked to Related Parties: 1
  
  
The current report was generated with data as of: 02/21/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page