General Information Party ID Party Name Party Classification Mailing Address Work Phone Email/Website 632458 Erin Jonasson null null Erin.Jonasson@Waterboards.ca.gov Related Places Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date Related Parties Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification 229003 Central Valley Regional Water Quality Control Board, Redding Office Organization Employee 04/07/2022 null Waterboard Regulatory Measures(non-enforcement) Reg. Measure ID Regulatory Measure Type Region WDID Title Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Violations within the past calendar year Violation ID Occurrence Date Violation Type Violation Description Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked To Enf. 1143970 05/02/2025 Deficient Monitoring Due to transitional period of Enviromental Coordinators, a sample was not collected for the dates of 5/1/25 and 5/2/25. There were no more discharges from SW-006 after 5/2/25. Violation N eSMR Sierra Pacific Industries Quincy Division Sawmill 444887 R5-2021-0036 N 1143772 02/11/2025 Order Conditions By-pass of unfiltered secondary wastewater to the receiving water is a violation of Discharge Prohibition III.B. Violation null Report Red Bluff WW Reclamation Plant 448935 R5-2023-0048 Y 1143771 02/11/2025 Order Conditions Failure to filter wastewater as described in the permit Fact Sheet section II.A prior to discharge to the receiving water is a violation of Discharge Prohibition III.A. Violation null Report Red Bluff WW Reclamation Plant 448935 R5-2023-0048 Y 1143770 02/11/2025 Other Codes The Discharger violated California Water Code (CWC) Section 13376. As reported, the Discharger discharged approximately 5.68 million gallons of unfiltered disinfected secondary treated wastewater to the receiving water, the Sacramento River. Failure to provide a report of waste discharge 180 days in advance of the discharge of wastewater is a violation of CWC Section 13376. Violation null Report Red Bluff WW Reclamation Plant 448935 R5-2023-0048 Y 1143725 04/30/2025 Deficient Monitoring There was a failure to collect a sample of discharge on SW006 for analytical analysis for the month of April 2025. This failure was due to a transitional period between Enviromental Coordinators. Violation N eSMR Sierra Pacific Industries Quincy Division Sawmill 444887 R5-2021-0036 N 1143630 02/28/2025 Order Conditions The power plant pond had a pH greater than 9.0 standard units following the 11 February 2025 and the 16/17 February 2025 unauthorized discharge events. The storm water retention pond had a pH greater than 9.0 standard units following the 11 February 2025 discharge event. Violation N Report Burney Cogeneration/Sawmill 433220 R5-2019-0048 Y 1143619 02/28/2025 Order Conditions Violation of R5-2019-0048 Discharge Prohibitions III.H. (2/11/2025) (2/17/2025) Violation N Report Burney Cogeneration/Sawmill 433220 R5-2019-0048 Y 1143618 02/28/2025 Order Conditions Violation of R5-2019-0048 Discharge Prohibitions III.I. (2/11/2025) (2/17/2025) Violation N Report Burney Cogeneration/Sawmill 433220 R5-2019-0048 Y 1143612 02/28/2025 Order Conditions Violation of R5-2019-0048 Discharge Prohibitions III.F. (2/11/2025) (2/17/2025) Violation N Report Burney Cogeneration/Sawmill 433220 R5-2019-0048 Y 1143611 02/28/2025 Order Conditions Violation of R5-2019-0048 Discharge Prohibitions III.E. (2/5/2025) (2/11/2025) (2/17/2025) Violation N Report Burney Cogeneration/Sawmill 433220 R5-2019-0048 Y 1143609 02/28/2025 Order Conditions Violation of R5-2019-0048 Discharge Prohibitions III.D. (2/11/2025) (2/17/2025) Violation N Report Burney Cogeneration/Sawmill 433220 R5-2019-0048 Y 1143608 02/28/2025 Order Conditions Violation of R5-2019-0048 Discharge Prohibitions III.B. (2/5/2025) (2/11/2025) (2/17/2025) Violation N Report Burney Cogeneration/Sawmill 433220 R5-2019-0048 Y 1143607 02/28/2025 Order Conditions Violation of R5-2019-0048 Discharge Prohibitions III.A. (2/5/2025) (2/11/2025) (2/17/2025) Violation N Report Burney Cogeneration/Sawmill 433220 R5-2019-0048 Y 1143606 02/28/2025 Other Codes Failure to provide a report of waste discharge 180 days in advance of the discharge of waste is a violation of CWC Section 13376. (2/5/25) (2/11/2025) (2/17/2025) Violation null Report Burney Cogeneration/Sawmill 433220 R5-2019-0048 Y 1143574 04/01/2025 Order Conditions Log Deck Pond exceeded its 2-foot freeboard requirement until April 6, 2025. The 2-foot freeboard requirement has been achieved from April 6, 2025, through the entire month of April. Violation N eSMR Burney Cogeneration/Sawmill 453615 R5-2025-0012 N 1142834 02/05/2025 Deficient Monitoring Prior to April 2025, it was understood that discharge from the round tanks at the Feather River Fish Hatchery was directed into the sump, then into the two percolation/settling ponds. After an in-depth analysis of engineering schematics, it was discovered that the water from those round tanks flows into a chamber adjacent to the sump, but not the sump itself. The water subsequently exits the chamber through EFF-003 and directly enters the Feather River. As part of collecting steelhead broodstock in January and February, adult fish are held for short periods of time in one round tank until they are ripe for spawning. It is necessary to feed these fish while they are being held so that they remain in good condition, survive the spawning process, and reenter the Feather River to continue their lifecycle. California Central Valley steelhead are listed as threatened under the Federal Endangered Species Act, so it is imperative that CDFW minimize incidental take during the spawning process. During the months of January and February in 2025, small amounts of feed (3 cups of feed per day) were given to steelhead in one of the round tanks. Because the understanding of the facility¿s infrastructure at that time was that water from the round tanks did not enter the EFF-003 discharge point, EFF-003 was not sampled in either of these two months. Therefore, the parameters missing from the Quarter 1 SMR include TSS, net TSS, turbidity, pH, and electrical conductivity. It is our understanding, based on data from other California hatcheries such as the Mokelumne River Fish Hatchery where similar feeding practices are conducted and water discharge is monitored, that giving three cups of feed to steelhead each day in one round tank would not have violated any thresholds for water quality parameters. Violation N eSMR Feather River Hatchery 376866 R5-2014-0161 N 1142833 01/07/2025 Deficient Monitoring Prior to April 2025, it was understood that discharge from the round tanks at the Feather River Fish Hatchery was directed into the sump, then into the two percolation/settling ponds. After an in-depth analysis of engineering schematics, it was discovered that the water from those round tanks flows into a chamber adjacent to the sump, but not the sump itself. The water subsequently exits the chamber through EFF-003 and directly enters the Feather River. As part of collecting steelhead broodstock in January and February, adult fish are held for short periods of time in one round tank until they are ripe for spawning. It is necessary to feed these fish while they are being held so that they remain in good condition, survive the spawning process, and reenter the Feather River to continue their lifecycle. California Central Valley steelhead are listed as threatened under the Federal Endangered Species Act, so it is imperative that CDFW minimize incidental take during the spawning process. During the months of January and February in 2025, small amounts of feed (3 cups of feed per day) were given to steelhead in one of the round tanks. Because the understanding of the facility¿s infrastructure at that time was that water from the round tanks did not enter the EFF-003 discharge point, EFF-003 was not sampled in either of these two months. Therefore, the parameters missing from the Quarter 1 SMR include TSS, net TSS, turbidity, pH, and electrical conductivity. It is our understanding, based on data from other California hatcheries such as the Mokelumne River Fish Hatchery where similar feeding practices are conducted and water discharge is monitored, that giving three cups of feed to steelhead each day in one round tank would not have violated any thresholds for water quality parameters. Violation N eSMR Feather River Hatchery 376866 R5-2014-0161 N 1142156 03/28/2025 Order Conditions The measured value for total Iron from the samples collected at discharge point SW-001 on 3/28/2025, was 1940 ug/L which exceeded the Storm Water Action Level of 1000 ug/L. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1142155 03/05/2025 Order Conditions The measured value for total Iron from the samples collected at discharge point SW-001 on 3/5/2025, was 2090 ug/L which exceeded the Storm Water Action Level of 1000 ug/L. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1142154 03/28/2025 Order Conditions The measured value for total Aluminum from the samples collected at discharge point SW-001 on 3/28/2025, was 1550 ug/L which exceeded the Storm Water Action Level of 750 ug/L. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1142153 03/05/2025 Order Conditions The measured value for total Aluminum from the samples collected at discharge point SW-001 on 3/5/2025, was 1430 ug/L which exceeded the Storm Water Action Level of 750 ug/L. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1142152 02/28/2025 Order Conditions The Discharger failed to maintain a freeboard of 2 feet or greater in the power plant pond and the log deck pond and the inability to maintain adequate freeboard was not due to direct precipitation or storm water runoff occurring as a result of annual precipitation with a greater than 100-year recurrence interval, or a storm event with an intensity greater than a 25-year, 24-hour storm event. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 Y 1142151 12/28/2024 Order Conditions Log Deck pond in freeboard violation from December 28, 2024, thru March 31, 2025. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1141802 02/18/2025 Deficient Monitoring SPI failed to realize the flow meter was not downloading data. Did not get a daily flow measurement. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1141801 02/17/2025 Deficient Monitoring SPI failed to realize the flow meter was not downloading data. Did not get a daily flow measurement. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1141800 02/16/2025 Deficient Monitoring SPI failed to realize the flow meter was not downloading data. Did not get a daily flow measurement. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1141799 02/20/2025 Deficient Monitoring SPI failed to realize the flow meter was not downloading data. Did not get a daily flow measurement. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1141798 02/15/2025 Deficient Monitoring SPI failed to realize the flow meter was not downloading data. Did not get a daily flow measurement. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1141797 02/11/2025 Deficient Monitoring SPI failed to realize the flow meter was not downloading data. Did not get a daily flow measurement. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1141796 02/19/2025 Deficient Monitoring SPI failed to realize the flow meter was not downloading data. Did not get a daily flow measurement. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1141795 02/14/2025 Deficient Monitoring SPI failed to realize the flow meter was not downloading data. Did not get a daily flow measurement. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1141794 02/13/2025 Deficient Monitoring SPI failed to realize the flow meter was not downloading data. Did not get a daily flow measurement. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1141793 02/12/2025 Deficient Monitoring SPI failed to realize the flow meter was not downloading data. Did not get a daily flow measurement. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1141488 02/13/2025 Order Conditions The measured value for total Aluminum from the samples collected at discharge point SW-001 on 2/13/2025 was 2810 ug/L, which exceeded the Storm Water Action Level of 750 ug/L. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1141487 02/28/2025 Order Conditions The measured value for total Aluminum from the samples collected at discharge point SW-001 on 2/28/2025 was 2050 ug/L, which exceeded the Storm Water Action Level of 750 ug/L. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1141486 02/13/2025 Order Conditions The measured value for total Iron from the samples collected at discharge point SW-001 on 2/13/2025 was 2690 ug/L, which exceeded the Storm Water Action Level of 1000 ug/L. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1141485 02/28/2025 Order Conditions The measured value for total Iron from the samples collected at discharge point SW-001 on 2/28/2025 was 2390 ug/L, which exceeded the Storm Water Action Legel of 1000 ug/L. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1140716 01/15/2025 OEV pH Instantaneous Minimum limit is 6 SU and reported value was 5.62 SU at EFF-002. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1140563 12/28/2024 Order Conditions Power plant pond in freeboard violation from December 28, 2024 through January 12, 2025. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1140562 12/28/2024 Order Conditions Log deck pond in continuous freeboard violation from December 28, 2024 through entire month of January 2025. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1140561 01/10/2025 Order Conditions The measured value for total Aluminum from the samples collected at discharge point EFF-001 on 1/10/2025 was 1390 ug/L, which exceeded the Storm Water Action Level of 750 ug/L. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1140560 01/03/2025 Deficient Monitoring The measured value for total Aluminum from the samples collected at discharge point EFF-001 on 1/3/2025 was 6280 ug/L, which exceeded the Storm Water Action Level of 750 ug/L. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1140559 01/03/2025 Order Conditions The measured value for total Iron from the samples collected at discharge point EFF-001 on 1/3/2025 was 4670 ug/L, which exceeded the Storm Water Action Level of 1000 ug/L. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1140558 01/10/2025 Order Conditions The measured value for total Iron from the samples collected at discharge point EFF-001 on 1/10/2025 was 1160 ug/L, which exceeded the Storm Water Action Level of 1000 ug/L. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1139659 12/29/2024 Deficient Monitoring SPI did not measure settled matter depth for LND-006. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1139658 12/30/2024 Deficient Monitoring SPI did not measure settled matter depth for LND-005. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1139657 12/29/2024 Deficient Monitoring SPI did not measure settled matter depth for LND-004. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1139656 12/29/2024 Deficient Monitoring SPI did not measure settled matter depth for LND-003. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1139093 12/28/2024 Order Conditions Log Deck pond exceeded its freeboard requirement on December 28, 2024 thru December 31, 2024. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1139089 12/28/2024 Order Conditions Power Plant pond exceeded its freeboard requirement on December 28, 2024 thru December 31, 2024. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1138310 11/24/2024 Order Conditions Log Deck Pond exceeded the 2ft Freeboard requirement from 11/24/2024 to 12/14/2024. The power plant was unable to process water the entire month of November. In addition, there was an atmospheric river event week of November 21 which dropped 1.5 ft of snow followed with five (5) inches of rain. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1138309 11/22/2024 Order Conditions Power Plant Pond exceeded the 2ft Freeboard requirement from 11/22/2024 to 12/10/2024. The power plant was unable to process water the entire month of November. In addition, there was an atmospheric river event week of November 21 which dropped 1.5 ft of snow followed with five (5) inches of rain. Violation N eSMR Burney Cogeneration/Sawmill 433220 R5-2019-0048 N 1137888 11/21/2024 Deficient Monitoring Flow readings were not taken on the first day of discharge for RSW-003 and RSW-004. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1137887 11/21/2024 Deficient Monitoring SPI did not complete an acute toxicity test the first day of discharge. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1137886 11/21/2024 Deficient Monitoring SPI did not complete a Total Hardness (as CaCO3) analysis for RSW-03 and RSW-04 upon start of discharge. Violation N eSMR Sierra Pacific Industries Burney Division 436971 R5-2020-0017 N 1137680 12/02/2024 Late Report Once Only OneTime ( TECHRPT ) (Grit Pond Operating Plan) report for 2023/12/01 (2791477) was due on 01-DEC-24 Violation null Report Red Bluff WW Reclamation Plant 448935 R5-2023-0048 N 1131974 09/02/2024 Late Report Monthly SMR ( MONNPDES ) report for July 2024 (2730086) was due on 01-SEP-24 Violation null Report Reynolds Molded Pulp Mill 443201 R5-2023-0018 N Enforcement Actions Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status Regulatory Measures linked to Related Parties Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status