General Information Party ID Party Name Party Classification Mailing Address Work Phone Email/Website 556490 Ryan Harris null 3737 Main Street 500 Riverside, CA 92501-3348 951-320-2008 Ryan.Harris@waterboards.ca.gov Related Places Place ID Place Name County Region Place Type Relationship to Party Relationship Start Date Relationship End Date Related Parties Party ID Party Name Party Type Role/Relationship Relationship Start Date Relationship End Date Classification 137767 Santa Ana Regional Water Quality Control Board Organization Employee 05/04/2016 null Waterboard Regulatory Measures(non-enforcement) Reg. Measure ID Regulatory Measure Type Region WDID Title Status Program Order No. RM Effective Date RM Termination Date Relationship Relationship Start Date Relationship End Date Violations within the past calendar year Violation ID Occurrence Date Violation Type Violation Description Violation Status Priority Source Facility Name Violated Reg. Meas. ID Violated Reg. Meas. Order No. Linked To Enf. 1119231 08/02/2023 Late Report Annual SMR ( SUMRPT ) report for 2022 (2505006) was due on 01-AUG-23 Violation null Report Poseidon Huntington Beach Seawater Desalination Facility 422463 R8-2021-0011 N 1128217 04/05/2024 CAT2 Hydrocarbons, Petroleum Daily Maximum limit is 100 ug/L and reported value was 246 ug/L at M-008. Violation N eSMR Michelson WWRF 402182 R8-2015-0024 N 1123578 12/17/2023 Order Conditions Temp Diff b/n Intake and Discharge Instantaneous Maximum limit is 30.0 Degrees C and reported value was 31.6 Degrees C at M-001. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1126587 03/04/2024 OEV pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.42 SU at M-INTB2. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1120669 08/29/2023 OEV pH Instantaneous Maximum limit is 9 SU and reported value was 9.96 SU at M-INTB1. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1119737 07/24/2023 OEV pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.24 SU at M-INTB1. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1126586 03/04/2024 OEV pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.14 SU at M-INTB1. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1120668 08/29/2023 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 30 mg/L and reported value was 33.8 mg/L at M-INTB1. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1128213 04/23/2024 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 30 mg/L and reported value was 40.0 mg/L at M-INTB2. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1128215 04/23/2024 OEV pH Instantaneous Maximum limit is 9.0 SU and reported value was 9.59 SU at M-INTB2. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1120670 08/29/2023 OEV pH Instantaneous Maximum limit is 9 SU and reported value was 9.2 SU at M-INTB2. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1121427 09/20/2023 Deficient Monitoring Samples were collected per the NPDES permit requirement. Cross contamination occurred during the laboratory analysis and results of the analysis were received too late to conduct a second sample within the same month. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1128214 04/23/2024 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 13.2 lb/day and reported value was 17.6 lb/day at M-INTB2. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1122294 10/30/2023 Deficient Monitoring pH measurements outside the acceptable range for relative percent difference (RPD) of 0.1 pH unit Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1121426 09/20/2023 Deficient Monitoring Samples were collected per the NPDES permit requirement. Cross contamination occurred during the laboratory analysis and results of the analysis were received too late to conduct a second sample within the same month. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N 1121428 09/20/2023 Deficient Monitoring Samples were collected per the NPDES permit requirement. Cross contamination occurred during the laboratory analysis and results of the analysis were received too late to conduct a second sample within the same month. Violation N eSMR Huntington Beach Generating Station 422464 R8-2020-0040 N Enforcement Actions Enforcement ID Enforcement Type Enf. Order No. Title Program Effective Date Status Regulatory Measures linked to Related Parties Reg. Measure ID Organization Regulatory Measure Type Program Effective Date Status