Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   ESMR At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Reporting Year 0
  
  
DRILLDOWN HISTORY:      [GO BACK TO ESMR AT-A-GLANCE LIST]  
Report Monthly SMR ( MONRPT ) (Monthly SMR) report for July 2011
  
  
  
  
  
General Information
Contract All Sections Expand All Sections
Agency Facility Reporting Period Due Date Date Received Certified By
Novato Sanitary District Novato and Ignacio WWTP 07/01/2011 to 07/31/2011 08/30/2011 08/30/2011 John Bailey
  
  
  
  
Expand/Contract Monitoring Locations
Monitoring Locations
Name Type Lat/Long Associated Discharge Point Receiving Water Description(+)
E-003 Effluent Monitoring None Novato Discharge Point 001 N/A At a point in the outfall from the Novato Plant between the point of discharge
EFF-001 Effluent Monitoring None Novato Discharge Point 001 N/A At any point in the Novato Plant?s outfall between the point of discharge and t
EFF-001P Effluent Monitoring None Novato Discharge Point 001 N/A At a point where all water from the pond to the outfall is present upstream of
INF-001 Influent Monitoring None Novato Discharge Point 001 N/A At any point in the Novato Plant headworks after the influent bar screens at whi
Total Monitoring Locations: 4
  
  
  
  
Expand/Contract No Discharge Dates
No Discharge Dates
Discharge Point Name Description(+) Dates of No Discharge Comments
Novato Discharge Point 001 Secondary Effluent disharge to San Pablo Bay 07/01/2011 - 07/31/2011 All water reclaimed during July, no discharge.
  
  
  
  
Expand/Contract Analytical Data
Data Summary-Analytical
Monitoring Point Parameter Analytical Method Qualifier Result Units Sample Date MDL ML RL Comments
Total Analytical Data Points: 0
  
  
  
  
Expand/Contract Calculated Data
Data Summary-Calculated
Monitoring Point Parameter Analytical Method Qualifier Result Units Sample Date Comments
Total Calculated Data Points: 0
  
  
  
  
Expand/Contract Calculated Data
Violations
Violation ID Violation Date Violation Type Description(+) Corrective Action Created By Last Modified By
Total Violations: 0
  
  
  
  
Expand/Contract Attachment Data
Attachments
File Name Description Size
eSMR Attachments July 2011.pdf None 1.05 MB
Total Attachments: 1
  
  
  
  
Expand/Contract Cover Letter
Cover Letter
File Name
eSMR Cover Trans July 2010.pdf
Total No. of Cover Letter Files: 1      Cover Leter Text: No
  
  
The current report was generated with data as of: 03/28/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page